NAVY MIL-J-7093 A-1964 JATO MARK 6 MOD 1《MARK 6 MOD 1型喷气式起飞助推器》.pdf
《NAVY MIL-J-7093 A-1964 JATO MARK 6 MOD 1《MARK 6 MOD 1型喷气式起飞助推器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-J-7093 A-1964 JATO MARK 6 MOD 1《MARK 6 MOD 1型喷气式起飞助推器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-J-7093A (Weps) 8 September i964 Superseding MI L-E-7093 (Aer) 9 August 1955 MI LIT ARY SPEC1 FI CAT I ON JATO MARK 6 MOD 1 This specification has been approved by Bureau of Naval Weapons, Department of the Navy 1. SCOPE 1.1 Mark 6 Mod 1, 15KS-1000, referred to herein as rocket motor or unit. Thi
2、s specification covers the solid propellant rocket motor JATO 2. APPLICABLE DOCUMENTS 2.1 Government Furnished Documents.- The fol lowing documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFI
3、CATIONS Military .- MIL-Q-9858 Quality Control System Requirements STANDARDS Military MI L-STD-105 Sampling Procedures and Tables for Inspection by Attributes Marking for Shipment and Storage Ballistic Nomenclature, Rocket Static Tests -Ml L-ST D-129 . MI L-ST D-292 pl R THIS M)CUMEWT CONTAINS -/. P
4、AGES. _ .-I _- Licensed by Information Handling Services7 _ _-_ - HIL-J-7073A 13 I 9999706 O292222 2 m MI L-J-7093A (Neps) Ml L-STD-414 Sampling Procedures and Tables for Inspection by Variables- for Percent De fe cti ve Manual on Quality Control of Materials ASTM-STP-15-6 (When requesting any of th
5、e applicable docments, refer to both title and number, All requests should be made via the cognizant Government Inspector, Copies of this specification and other unclassified specifications and drawings required by contractors in connection with specific procurement functions should be obtained upon
6、 application to the Commanding Officer, Naval Supply Depot (Code105 1, 5801 Tabor Avenue, Philadelphia 20, Pennsylvania, All other documents shouid be obtained fr-om the procuring activity or as directed by the contracting officer.) (ASTM Specification maybe obtained from American Society for Testin
7、g Materials1916 Race St. Philadelphia, Pa.) DRAWINGS . Bureau of Naval Weapons -LD 419664 -,LD 515662 JATO Mk 6 Mod 1,lgniter Mk 165 Mod O, Carloading, Packaging, Palletizing and Shipping Assemblies JATO Mk 6 Mod 1, Loaded Assembly - CD 2000087 . JATO Mk 6 Mod 1 (Requests for the drawings, list of d
8、rawings, and Classification of Defects (CDs) should be addressed to the Commanding Officer, Central Technical Documents Office, Louisville, Kentucky.) 2.2 Other Publications.- The follawing document of the issue in effect on date of invitation for bids or request for proposal, forms a part of this s
9、pecifi- cation to the extent specified herein, CODE OF FEDERAL REGULATIONS Title 49 CFR Parts 71 -90 Interstate Commerce Commission Rules and Regulations for the Transportation of Explosives and Other Dangerous Articles (The Interstate Commerce Commission tegulations are a part of he Code of Federal
10、 Regulations (1949 Edition - Revised 1963) wailable from the Super- intendent of Documents, Government Printing Office, Washington 25, D. C, Orders for the above publication should cite 49 CFR 71-9(Rev0 1963).) 2 - - . - - - - _ - .- _- z Licensed by Information Handling Services3. MI L-J-7093A (Wep
11、s) REQUIREMENTS 3.1 activity, each contractor shd I before beginning large scere produdion under- any contract or order, submib for testing a preproduction lot -mnufactursd by proposed piduetion methods. The preproduction lot shall consist of twenty-eight (28) loaded motors repre- senting four (4) p
12、ropellant batches. The motors shall be tested as specified in section 4 of this specification and figure 1 at an activity designated by the procuring activity to confirm that production equipment, methods, and criteria proposed are suitable for mass production and will yield rocket motors meeting th
13、e requirements of this specification. At the discretion of the procuring activity, these tesis may be repeated under any ofthe following conditions: Preproduction Requ remen one at -75F and one at 150F. 4.5.2.1.1 Requirements. -Ballistic data obtained from the test firings shall meet the requirement
14、s of 3.3.1 4.5.2.1.2 Nozzle Resizing. -When the results of the above test (4.5.2.1) do not meet the requirements (3.3.1) and it appears that the performance of the pro- pellant batch can be brought within limits by changing the nozzle throat diameter, one (i) udditional lot test sample shall be fire
15、d wth the revised nozzle throat diameter and at a temperature to be specified by the procuring agency. Satis- factory performance of this test shall qualify the lot for acceptance with the re- vised nozzle size. 4A2.1.3 Test Results. -Prior to the initiation of the Intermediate Sampling Schedule (4.
16、5.2.2) the contractor shall furnish the procuring agency, for review 5 . -+-; .* ._ Licensed by Information Handling Services. . . . - - - . MI L- J -7093A (weps) and acceptance, the results of test firings (4.5.2.1) including pressure and thrust time curves. Abnormal performance, blow-ups or reject
17、ion of propellant batches or motors for defects may be cause for continuation of initial sampling plan, until adequate verification of unit is approved in writing to iustify reduction of sampling. Any revision to test plan is at contractors risk if approval is not granted. 4.5.2.2 random from each l
18、ot, conditioned and test fired (in accordance with 4.8.3) Intermedigte Sampling Schedule. -One motor shall be selected at alternately at -75OF and 15OOF. 4.5.2.2.1 requirements of 3.3.1. Requirements. -Ballistic data obtained from test firings shall meet the 4,5.2.2.2 Selection of Units, -The test m
19、otor shall be selected at random from all the assembled motors of the lot. By specific agreement between the contractor and the customer, it will be permissible to select the test motor prior to assembly of the entire lot. 4.5.2.2. meet the 3 Nozzle Resizing. -When the results of the above test (4.5
20、.2.2) do not requirements (3.3.1) and it appears that the performance of the propellant batch can be brought within limits by changing the nozzle throat diameter, one (1) additional lot test sample shall be fired with the revised nozzle throa diameter and at a temperature to be specified by the proc
21、uring agency. Satisfactory performance of this test shall qualify the lot for acceptance with the revised nozzle size. 4.5.2.2.4 Test Results. initiation of the Normal Sampling Schedule (4.5.2,3) the contractor shall furnish the procuring agency the results of test firings (4.5.2.2) including pressu
22、re and thrust time curves. Abnormal performance, blow-ups or rejection of propellant batches or motors for defects may be cause for continuation of initial sampling plan, until adequate verification of unit is approved in writing to justify reduction of sampling. Any revision to test plan is at cont
23、ractors risk if approval is not granted. 4.5.2.2.5 Review. -The test data shall be submitted to the procuring activity for review for the purpose of reducing sampling in accordance with the Normal Sampling Sc hedu I e (4.5.2.3). 4.5.2.3 under the Intermediate Sampling Schedule (4.5.2.2) and upon app
24、roval by the procuring activity in writing, the Normal Sampling Schedule shall form the basis for acceptance of the assembled motors. -After production of at least 3,000 moton and prior to the Normal Sampling Schedule. -After the production of the 2,000 motors 4.5.2.3.1 Selection of Units. -One (i)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILJ7093A1964JATOMARK6MOD1MARK6MOD1 喷气式 起飞 助推器 PDF

链接地址:http://www.mydoc123.com/p-980102.html