NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf
《NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、NIL-I-85365A 13 7799706 036q570 W ML-1-8 5 365A(AS) 5 August 1982 SUPERSEDING 9 February 1981 MIL-1-853 65(AS) MILITARY SPECIFICATION Igniter Mark 296 Mods (Loaded Assembly) This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is avaihble for use by al
2、l Departments and Agencies of the Department of Defense. 1. SCOPE. 1.1 Scope. This specfication establishes the manufacturing and testing requirements for the procurement of Igniter Mark 296 Mods (Loaded Assembly), hereafter called the igniter. 2. APPLICABLE DOCUMENTS. 2.1 Government documents. 2.1.
3、1 Specifications, standards, and handbooks. Unless otherwise specified, the following specifications, standards, and handbooks of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation form a part of this specification
4、 to the extent specified herein. SPECIFICATIONS Military MIL-E5272 STANDARDS Military Environmental Testing, Aeronautical and Associated Equipment, General Specification for MIL-STD-105 Sampling Procedures and Tables for Inspections by Attributes Beneficial comments (recommendations, additions, dele
5、tions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD) Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardized Document hprove- me
6、nt Proposal (DD Form 1426) appearing at the end of this document or by letter. .=- / FSC 1340 THIS DOCUMENT CONTAINS l2 PAGES. Licensed by Information Handling ServicesMIL-I-85365A 13 W 7777906 0364571 T W MIL-1-8 5 3 65 (AS) MILSTD-129 Marking for Shipment and Storage MIL-STD-33 1 Fuze and Fuze Com
7、ponents, Environmental and Performance Tests for MIL-STD-4 14 Sampling Procedures and Table for Inspection by Variables for Percent Defective Environmental Test Methods MIL-STD-8 1 O 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and
8、 publications form a part of this specification to the extent specified herein. DRAWINGS Naval Air Systems Command (Code Ident 30003) 1255AS114 1255AS133 1255AS14 1 DL 1255AS114 Mark 296 Mod O Igniter, Explosive, Loaded Assembly Shipping Container, Mark 296 Mod O, Igniter Mark 296 Mods, Test Chamber
9、 Assembly Igniter, Mark 296 Mod O, Loaded Assembly PUB LICATIONS Naval Sea Systems Command OR 10 OR 11 Documentation Requirements for Packaging, Packing, Shipping, and Handling of Weapon System Components Development of Packaging, Handling, Storage, and Transportation Systems for Weapons (Copies of
10、specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functionsshould be obtained from the contracting activity or as directed by the contracting officer.) 2.2 Other publications. The following document(s) form a part of th
11、is specification to the extent specified herein. The issues of the documents which are indicated as DoD adopted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable. I Licensed by Information Handling ServicesNIL-I-853bSA 13 9999906 0364592 1 W O“ F Min I Max MIL
12、-1-8 53 65 (AS) +li Min 1 1 Pellet peak pressure (chamber pda) Time to pellet peak chamber pressure (ms) Code of Federal Regulations 95 210 100 15 50 15 49 CFR 100-177 Transportation (Copies are available from the Superintendent of Documents, Government Printing Office, Washington, D.C. 20402. Order
13、s for the above publications should cite latest issue and supplements thereto.) 3. REQUIREMENTS. 3.1 Conformance with drawings. Unless otherwise specified in the contract, the igniter shall meet all the requirements specified herein and on the applicable drawings listed on DL 1255AS114. 3.2 First ar
14、ticle. When specified in the contract (see 6.2), the contractor shall furnish sample unit(s) for first article inspection and approval (see 4.4 and 6.4). 3.3 Circuit resistance. The igniter circuit resistance between the ends of the lead wires shall be between 0.40 and 0.60 ohms (see 4.6.2). 3.4 Per
15、formance requirements. The performance requirements of the igniter shall be as specified in Table I (see 4.6.1 O). TABLE I. Performance requirements. I Requirement l- 14- initiator peak pressure da) F MaX 65 220 50 3.5 Environmental requirements. 3.5.1 Impact. The igniter shall withstand the 40-foot
16、 drop test without igniting (see 4.6.3). 3.5.2 Two-foot-drop. The igniter shall withstand the 2-foot drop test without spilling any explosive material and without igniting (see 4.6.4). 3 Licensed by Information Handling ServicesMIL-I-85365A 13 I 7977906 0364573 3 I MIL-1-8 5 3 65 (AS) 3.5.3 Temperat
17、ure and humidity. The igniter shall withstand the temperature and humidity test (see 4.6.5). 3.5.4 Vibration. The igniter shall withstand the simulated shipboard vibration test (see 4.6.6). 3.5.5 Acceleration. The igniter shall withstand the 15 g load and acceleration test (see 4:6.7). 3.5.6 High te
18、mperature test. The igniter shall not ignite when subjected to a tempera- ture of 350“ F for 120 minutes minimum (see 4.6.8). 3.5.7 Salt Spray. The igniter shall withstand the salt spray test without corrosion or damage (see 4.6.9). 3.5.8 Transportation shock, storage, and handling. The igniters, wh
19、en packed in accordance with Section 5 , shall not rupture so as to spill the package contents or break the seals on unit packages (see 4.6.1 1). 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is respons
20、ible for the performance of all inspection require- ments as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein unless disapproved by th
21、e Government. The Government reserves the right to perform any of the inspections set forth in the specifi- cation where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. 4.2 Classifcation of inspections. The inspection requirements specif
22、ied herein are classified as follows : a. First article inspection (see 4.4). b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified in the contract (see 6.2. i), all inspections shall be performed in accordance with the test conditions specified herein. 4
23、.4 First article inspection. First article inspection shall be performed by the con- tractor, after award of contract and prior to production, at a location acceptable to the Government. First article inspection shall be performed on sample units which have been produced with equipment and procedure
24、s normally used in production. First article approval is valid only on the contract under which it is granted, unless extended by the Government to other contracts. 4 Licensed by Information Handling ServicesMIL-I-85365A 13 777770b 0364574 5 I Examination Rea uirement MIL-1-8 5 3 65(AS) Test 4.4.1 S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI85365A1982IGNITERMARK296MODSLOADEDASSEMBLYMARK296MODS 点火器 装卸 组件 PDF

链接地址:http://www.mydoc123.com/p-980050.html