NAVY MIL-I-82880-1994 INITIATOR CARTRIDGE ACTUATED M5A2 REMANUFACTURED METAL PARTS ASSEMBLY《M5A2火药驱动起始延迟装置金属装配件再改造》.pdf
《NAVY MIL-I-82880-1994 INITIATOR CARTRIDGE ACTUATED M5A2 REMANUFACTURED METAL PARTS ASSEMBLY《M5A2火药驱动起始延迟装置金属装配件再改造》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-82880-1994 INITIATOR CARTRIDGE ACTUATED M5A2 REMANUFACTURED METAL PARTS ASSEMBLY《M5A2火药驱动起始延迟装置金属装配件再改造》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-I-82B80 = 9999906 1785960 T12 = MILITARY SPECIFICATION I INCH-POUND 1 MIL-I-82880(OS) 10 Augiist 1994 SUPERSEDING 18 May 1965 FA-PD-MI-2659 INITIATOR, CARTRIDGE ACTUATED, M5A2 REMANUFACTURED METAL PARTS ASSEMBLY is speci3cation is approved for use by the Naval Sea Systems Command, Department of
2、the Navy, and is available for use by all Departments and Agencies of the Departments of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the M5A2 Cartridge Actuated Initiator Remanufactured Metai Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents.
3、2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODI
4、SS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For STANDARDS MILITARY MIL-STD-105 Sampling Procedures And Tables For Inspection By Attributes Beneficial comments (recommendations, additions, deletions) anrl any p
5、ertinent clata which may be of use in improving this document should be addressed to: Commander, Mian Head Division, Naval Surface Warfare Center, Standardization Branch (Coe 8420), 101 Strauss Avenue, Mian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426)
6、appearing at the end of this document or by sending a letter. _ AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-BZBBO 9999906 1985961 959 u MIL-
7、STD- 1 O9 Quality Assurance Terms And Definitions MIL-STD-4 13 Visual Inspection Guide for Elastomeric O-Rings (Unless otherwise indicated, copies of federal and military specifications and standards are available fi-om Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia
8、, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Ce
9、nter, Indian Head Division (CAGE Codes 19200 and 19203) 8596171 Initiator, Cartridge Actuated, M5A2 Metal Parts Assembly 8796541 Box, Fiberboard (Inner), Packing, Ammunition, For Initiator, Cartridge Actuated, M3A2, M5A2 8796542 Box, Packing, Ammunition, For Initiator, Cartridge Actuated, M3A2, M5A2
10、 92 16934 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Initiator, Cartridge Actuated, M3A2, M5A2 U.S . Air Force TPO OO-932-503 1 Initiator, Cartridge Actuated, M3A2, M5A2 (Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center,
11、Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and reg
12、ulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. Ali materials used in the manufacture of the initiators shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtain
13、ed from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. The remanufactured initiator metal part assembly shall contain a new shear pin and new O-
14、rings. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-1-82880 9979906 L7859b2 895 3.2 Hydrostatic pressure. The initiator chamber and cap shall withstand a hydrostatic pressure of 5500 to 6500 pounds per square inch (psi) for 15 seconds, minim
15、um, without deformation or mechanical failure (see 6.3.1). 3.3 Protective finish. Protective finish shall be in accordance with the applicable specifications and drawings and shall apply to ail surfaces of the component, regardless of configuration. Remanufactured exterior components shall have the
16、existing protective finish stripped and the specified protective finish reapplied (see 6.3.2). 3.4 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either direction using procedures in 4.5.3. 3.5 Shear pin strength. The shear pin,
17、after application of protective finish, shall shear when a load of 41 f 5 pounds is applied at a steady rate of 0.125 inch per minute. 3.6 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints
18、shall be assembled handtight. 3.7 Threaded component parts. Class 2A or 2B thread gage shall be used on remanufactured component parts inspection versus class 3A or 3B thread gage required on new hardware for initiators. 3.8 Workmanship. Initiators shall be free of cracks, splits, or other defects w
19、hich might prevent proper mating with connecting parts or proper functioning of the device. 3.8.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity, or any similar defect. 3.8.2 Burr. No part shall have a burr which might interfere with the assembly or
20、 function of the item or which might be injurious to personnel handling the item. 3.8.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in th
21、e contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the perfor
22、mance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requireme
23、nts (see 6.2). 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specifi
24、cation shall not relieve the 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-IL-1-82880 W 9999906 1985963 721 m MIL-1-82 8 80(0S) contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI828801994INITIATORCARTRIDGEACTUATEDM5A2REMANUFACTUREDMETALPARTSASSEMBLYM5A2 火药 驱动 起始 延迟 装置 金属

链接地址:http://www.mydoc123.com/p-980033.html