NAVY MIL-I-6115 A-1951 INSTRUMENT SYSTEMS PITOT TUBE AND FLUSH STATIC PORT OPERATED INSTALLATION OF《皮托管和冲水静态港口经营仪表系统安装指南》.pdf
《NAVY MIL-I-6115 A-1951 INSTRUMENT SYSTEMS PITOT TUBE AND FLUSH STATIC PORT OPERATED INSTALLATION OF《皮托管和冲水静态港口经营仪表系统安装指南》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-6115 A-1951 INSTRUMENT SYSTEMS PITOT TUBE AND FLUSH STATIC PORT OPERATED INSTALLATION OF《皮托管和冲水静态港口经营仪表系统安装指南》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、MI L-il- 6 I I SA 29 MARCH 1951 Superseding 26 April 1950 KIIL-1-6115 MILITARY SPECIECATION INSTRUMENT SYSTEMS, PITOT TUBE AND FLUSH STATIC WRT OPERATED, INSTALLATION OF This specification was approved by the Departments of the Amy, the Navy, and the Air Force for use of. procurement services of the
2、 respective Departmnts. 1. SCOPE 1.1 This specification covers the general requirements for the installation of all types of pitot tube and flush static port-operated instniment systems for use on aircraft to provide a source for dynamic and static pressures. 2. APFKtCABLE SPECIFICATIONS, OMER PUBLI
3、CATIONS, AND DRAWINGS 2.1 The following publications, of the issue in effect on date of invitation for bids, shall form a pert of this specification to the ,extent specified herein: 2.1.1 Specifications. - Federal - W-T-787 Ribing, Aluminum-Alloy (AL-52) (Aluminum- Magnesium-chmmium); Round, Seamles
4、s Mlitaq EL-P-6889 Primer; Zinc Chmmate JBN-A- Anti-Seize Coqund; White bad Base, General Purpose (For Thmaded Fittings) Air Force-Navy Aeronautical Corrosim-Pmtectiw (For) Aluminum Alloya 2.1.2 Other Publications.- Air Force-Navy Aeronautical Bulletin NO. U3 Specifications and Standards; Use of Nav
5、al Air Experimental Station Report No. NAES-INSTR. 16-44 Dual Sighting Stand and Other Wthods of Calibrating Altimeter and Airspeed (Copies of this publication may be obtained from the Technical Infomtion Branch, Bureau of Aeronautics, Navy Department, Washington 25, D. C.) c Provided by IHSNot for
6、ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-b335A 66 H 7779706 0325400 T t L-I -6llrA (Ilarch 1951) National Advisory Codttee for Aeronautics Tech. Note No. 1605 Accuracy of Airspeed Measurements Calibration Procedures (Copies of this mport may be obtained from t
7、he National Advisory Cornnittee foi Aeronautics, 3.724 F Street, N, U., Washington, D. C.) 2.1.3 DrawinEs. - Air Force-Navy Aeronautical Standard Drawings AN929 AN58ll AN5812 AN5813 AN6270 AND10056 AND10375 AND10398 AND10410 Cap - Pressure Seal Flared Tube Fitting Tube - Pitot, Electrically Heated,
8、“L“ Shaped, Inverted Tube - Pitot, Electrically Heated, “LIt Shaped Tube - Pitot, Electrically Gated Hose Assembly -Detachable Swiwl Fitting, Low Pressure Fitting End - Standard Dimensions for FLared Tube Colors - Fluid Line Identification Metals - Definition of Dissimilar Pitot-Static and Pitot Tub
9、e - Wiring Diagram for Connection and Gasket Seal (Unless otherwise specified, copies of this specification and copies of other publications referenced herein or required for Govemmnt procurement, and the index of Military Aeronautical (AN or HIL) Standards, my be obtained upon application to the Co
10、nmianding General, Air Materiel Command, Wright-Patterson Air Force Base, Dayton, Ohio; or the Comnanding Officer, U. S. Naval Air Station, Johnsville, Pennsylvania.) 3. REQJ1FEMEXI“T 3.1 Materials.- Materials used in the installation of pitot tube and flush static port-operated instrunrent systems
11、in military aircraft- shall be of high quality, suitable for the purpose, and shall conform to applicable Govemment specifications. Materials confoming to contractorrs specificaticns may be used provided they are released by the Government and contain provisions for adequate tests. The we of con- tr
12、actors specifications will not constitute waiver of Govenunent inspection. port-operated instrument systems Yi military aircraft shall be suitably protected to resist corrosion during nom1 service life. 3.1.1 or if more cmvenient, some of the additional instrurnts may be connected to one tube and so
13、me to the other. airspeed switches, Mach number limit switches, or amamnt controls, shall be supplied by the copilots pitot tube if a copilots pitot tube is used. Additional pitot tubes may be required to insure reliability in very large aircraft. Other pitot pressure-operated equipment, such as 3.2
14、.3.2 Number of Instruments per Pair of Static Ports.- Not more than six instruments consisting of a combination of altimeters, airspeed indicators, and rate of climb indicators, and other instruments of similar volume shall be connected to one line leading from the ITI between the static ports. If t
15、here are more than 6 but not mre than I2 such instmurients installed, a CMBS however, Inspection doors may . i.2.13 Removal of Tube.- A union shall be installed in the pitot and static Ums at the point of attachment of the mounting strut to the wing or fuselage to permit the mmval and replacernt of
16、the pitot tube and flush static port. 3,2.13.1 Modification,- The pitot tube shall not be modified in form or color by the attachnisnt of any rings, sleeves, or other additions of pint or finish. 3.2.y Clearing of Lines.- The pitot aqd static Unes shall be blown clear vbth dry, high-presm air inmedi
17、ately before the pitot and static tube or tubes are connected and the instruments are installed in the system or sgsttjms. remomd, and all instrunient connections ahall be vented to the atmosphere while the air is being bown through all Unes. with heater elements shall be in accordance with Drawing
18、ANDl0410. be lowted where they can be convenientlv reset in flight. All Win plugs shall be 3.2.15 Eleotrica1Circuit.- The electrical circuit for the pitot tubes provide( Circuit breakers shall c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-I-
19、bLL5A bb W 7777906 OL25Y09 b W MIL-1-6ll5A (March 1951) 3.3 Perfornrance.- “he installation of pitot tubes and flush static port-operated instrument systems shall satisfy the performance requiremnts as specified in Section 4 when subjected to the tests headed as follows: Electrical Wiring Compass De
20、viation Leakage Flushness and Smoothness Determination of Pitot Tube and Flush Static Port Effect of Maneuver System installation Error 4. SAMPLING, INSPECTION, AND “EST PROCEDUFES 4.1 General.- All the tests required for the testing of these installations are classified as Inspection tests, for whi
21、ch necessary sampJing techniques and methods of testing are specified in this section. The contractor shall be responsible for accom- plishing the required tests. all inspection and testing shall be under the supemision of the Government Inspector. Acceptance or approval of matetial during course of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI6115A1951INSTRUMENTSYSTEMSPITOTTUBEANDFLUSHSTATICPORTOPERATEDINSTALLATIONOF 托管 冲水 静态 港口 经营 仪表

链接地址:http://www.mydoc123.com/p-979949.html