NAVY MIL-I-60639 A-1991 INITIATOR CARTRIDGE ACTUATED DELAY M31 ASSEMBLY《 M31火药驱动起始延迟装配件》.pdf
《NAVY MIL-I-60639 A-1991 INITIATOR CARTRIDGE ACTUATED DELAY M31 ASSEMBLY《 M31火药驱动起始延迟装配件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-60639 A-1991 INITIATOR CARTRIDGE ACTUATED DELAY M31 ASSEMBLY《 M31火药驱动起始延迟装配件》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、1 . a- r MIL-I-bOb39A 13 9999906 0478267 L 9 INCH-POUND MIL-Id0639A 23 Amil 1991 SUPERSEDING 27 July 1967 MIL-Ido639(0S) MILITARY SPECIFICATION INITIATOR, CARTRIDGE ACTUAmD, DELAY, M31 ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SC
2、OPE 1.1 Scope. This specification covers the requirements for the M31 Delay Cartridge Actuated Initiator Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1. Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this d
3、ocument to the extent specified herein. Unless otherwise specified, the issues of these documents are. those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550
4、 Ammunition, General Specification For MIL-1-14857 Initiator, Cartridge Actuated, Delay, M10, M31, M42, M72, and M114 Remanufactured Metal Parts Assembly Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addres
5、sed to: Commanding Officer, Naval Ordnance Station, Standardization Branch (3730), Indian Head, Maryland 20640-5000, by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A. Approved for
6、public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-bOb39A 13 m 999940b OLI782b8 3 m MIL-Id0639A . MIL-1-60296 STANDARDS MILITARY MIL-STD-LO5 MIL-STD- 1 O9 MIL-STD-453 MIL-STD-1168 MS28741 Initiator, Cartr
7、idge Actuated, Delay, M10, M31, M42, M72, and M114 Metal Parts Assembly Sampling Procedures and Tables for Inspection by Attributes Quality Assurance Terms and Definitions Inspection, Radiographic Ammunition Lot Numbering Hose Assembly, Detachable End Fitting, Medium Pressure (Unless otherwise indic
8、ated, copies of federal and military specifications, standards, and handbooks are available from Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 19 111-5094). 2.1.2 Other Government documents, drawings, and publications. The following other Government document
9、s, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS NAVAL ORDNANCE STATION, INDIAN HEAD, MD (CAGE Codes 19200 and 19203) 8593312 Cartridge, Delay, M93 Assembly DL8595
10、25 1 Initiator, Cartridge Actuated, Delay, M3 1, Assembly 8798142 Box, Packing, Ammunition for Initiator, Cartridge Actuated, Delay, M10, M30A1, M31, M32A1, M42, M43A1, M72, M92, or M114 8798 143 Box, Fiberboard (Inner) Packing, Ammunition for Initiator, Cartridge Actuated, Delay, M10, M30A1, M31, M
11、32A1, M42, M43A1, M72, M92, or M114 9216933 Box, Fiberboard (Outer) Alternative, Packing Ammunition, for Initiator, Cartridge Actuated, Delay, M10, M30A1, M31, M32A1, M42, M43A1, M72, M92, or M114 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL
12、-I-bOb39A 13 9999906 OY782b9 5 = MIL-I-60639A U.S. AIR FORCE Jge Actuata M72 (Application for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5000.) 2.2 Order of precedence. In the event of a conflict between the text
13、of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. All materials used in the manufacture of the initi
14、ators shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings,
15、the bidders selections shall be clearly stated in the proposal. 3.2 Conformance to documents. Ths M31 initiator covered by this specification shall be manufactured in accordance with DL8595251. 3.3 Components. 3.3.1 Primary components. For the purpose of this specification, the M93 delay cartridge r
16、awing 8593312) is defined as a primary component. Only primary components from a single lot shall be used in a production lot of initiators. One primary component production lot may be used in more than one initiator production lot. 3.3.2 Component parts. All component parts shall meet the applicabl
17、e requirements of MIL-I- 14857 or MIL-1-60296 prior to assembly. 3.4 Breakaway torque. The chamber and cap of each assembled initiator shall withstand a breakaway torque application of 400 inch-pounds without loosening or deformation (see 4.3.1). 3.5 Residual magnetism. The initiator shall not defle
18、ct the indicator of the compass more than five degrees in either direction (see 4.3.2). 3.6 Radiographic examination. Each initiator assembly shall be radiographically examined for defects (see 4.3.3). 3.7 Functional. 3.7.1 Ballistics. Initiators loaded with cartridges from one accepted lot and temp
19、erature conditioned shall perform within the pressure values and delay times (see 6.6. i) specified in table I. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-bOb39A 13 M 999990b O478270 L ME-I-60639A I Temperature (OF) I Minimum Maximum Pre
20、ssure values shall be recorded at the end of 15 feet of aircraft hose, assembly number MS28741-4, and a pressure chamber with a volume of 1 cubic inch. TABLE I. Pressure values. I Delay time (sec) I I I -60 to -70 65 to 75 195 to 205 500 1250 1.00 + 0.30 - 0.20 600 1500 1.00 + 0.30 - 0.20 800 1800 1
21、.00 + 0.30 - 0.20 3.7.1.1 Initiation. The initiator shall be fired by a source delivering an output pressure of 700 +25, -O pounds per square inch (gage) (psig) at 70 f 5F. 3.7.2 Misfires. There shall be no misfires. 3.7.3 Mechanical failures. The initiator shall function without mechanical failure
22、(see 6.6.2). 3.8 Workmanship. Initiators shall be free of cracks, splits, incomplete or damaged threads on inlet and outlet ends, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.8.1 Metal defects. All components shall be free from crack
23、s, splits, cold shuts, inclusions, porosity or any similar defect. 3.8.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.8.3 Foreign matter. No part or assembly shall contain chips, dirt, gr
24、ease, rust, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herei
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI60639A1991INITIATORCARTRIDGEACTUATEDDELAYM31ASSEMBLYM31 火药 驱动 起始 延迟 装配 PDF

链接地址:http://www.mydoc123.com/p-979939.html