NAVY MIL-I-28763 C (2)-1985 INTERROGATOR SET AN UPX-27《AN UPX-27型询问器设备》.pdf
《NAVY MIL-I-28763 C (2)-1985 INTERROGATOR SET AN UPX-27《AN UPX-27型询问器设备》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-28763 C (2)-1985 INTERROGATOR SET AN UPX-27《AN UPX-27型询问器设备》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-I-28763C( EC) AMENDMENT 2 30 August 1985 SUPERSEDING AMENDMENT 1 20 July 1983 MILITARY SPECIFICATION INTERROGATOR SET, AN/UPX-27 This amendment forms a part of Military Specification MIL-I-28763C, dated 30 November 1977, and is approved for use within the Space and Naval Warfare Systems Comand,
2、Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1, line 1: 2.1 alSPECIFICATIONS“, “MILITARY“: Delete “The“ and substitute “Unless otherwise specified, the“. After “MIL-E-16400“. delete llL/ll and at bottom of page, delete I- 1/
3、Revision F applies“. PAGE 2 2.1, “STANDARDS“, “MILITARY“, MIL-STD-781: Delete “Re1 i abi 1 ity Test Exponent i al/Di stribu- tion“ and substitute “Reliability Design Qualification And Production Acceptance Tests: Exponent i al Distribution“. * 2.2, “other pub1 icat ions“, after “DoD AIMS 64-900A“, a
4、dd: “NAVAL AIR SYSTEMS COMMAND (NAVAIR) WS-6536D Process Specification Procedures And Requirements For Prepara- tion And Soldering Of Electrical Connections“. PAGE 3 3.4.1: Delete the text and substitute: “The selection of parts shall be in accordance with MIL-E-16400. However, this requirement shal
5、l not preclude the use of parts of smaller physical characteristics, provided that the use of such parts is restricted to those applications whereby a saving in weight or one metric (linear) dimension of at least 25 percent can be effected. PAGE 4 3.4.3.3. 1 ine 5: Delete “prevent“ and substitute “p
6、reclude“. PAGE 6 3.4.12, line 2: Delete “rough shocks during transportation and“. 3.4.12.2, line 2: Delete “MIL-STD-167“ and substitute “MIL-E-16400“. 3.4.13.1e: After “Primary“ add .power*. PAGE 7 3.4-13.3, line 2: After “ambient“, add operating“. 3.4.15.2: Delete. test points for all-video signal*
7、. 3.4.18. last sentence: Delete “Test points for all signal“. Substitute “Reatiily accessible 1 of 6 FSC 5895 DISTRIBUTION STATEMENT A. Approved for public release; distribution is un1 imited. THIS DOCUMENT CONTAINS & PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without
8、 license from IHS-,-,-MI L-I-28763C( EC) AMENMIENT 2. PAGE 12 3.5.20, last sentence: Delete “Lowered“ and substitute “Louvered. PAGE 24 3.7.1.1, title: 3.7.1.1.: Add the following title: “KIR-1A computer enable“. Delete “KIR-1A computer enable“ and substitute “Mode 4 enabling“. PAGE 26 3.7.1.1.2: Ad
9、d the following title: “KIR-1A normal-remote operation“. 3.7.1.1.3: Add the following title: “KIR-1A normal or multiplex operation“. After 3.11, add the following new paragraph: “3.12 Leakage current (equipment). When practicable, the leakage current of the equipment shall not exceed 5 milliamperes
10、(mA) to ground, whether or not such equipment contains radio inter- ference filters or capacitors. of 5 rii4, a warning plate shall be attached to the equipment reading: Should the equipment have an unavoidable leakage current in excess DANGER - Do not energize this equipment unless frame and all ex
11、posed metal parts are grounded.“ After “3.12“, added by amendment 1, add the following new paragraphs: * “3.13 Workmansh i p. * “3.13.1 General workmanship. Workmanship shall conform to the Workmanship paragraph of * “3.13.2 Workmanship screen. All equipment shall withstand a detect detection vibrat
12、ion screen of random type vibration at 0.049 /Hz +_3 di3 from 80 Hz to 350 Hz and temperature cycling with operation at the maximum and minimum operating temperatures and dwell time at the nonoperating temperature extremes. MI L-E- 16400. 2 * “3.13.3 Solaering and soldering processes. Soldering, sol
13、dering procedures, and processes shall conform to WS-6536 It PAGE 27 4.3: Delete first two sentences and substitute: “First article inspection shall be performed on two sampie units, and shall consist of all examination and testing necessary to determine compliance wth the requirements herein.“. 4.3
14、.1, line 3: Delete “consecutive“. PAGE 28 4.3.8: Delete and substitute: “4.3.8 Vibration tests. Vibration tests shall be conducted in accordance with MIL-E-16400, with the equipment energized and in the operating condition during and after this test.“. 4.3.8.1 and 4.3.8.2: Delete. 4.3.10.2: After “w
15、ith“, add “the AN/UPX-27“. PAGE 29 4.4.1, last sentence: Delete. 4.4.2, first sentence: After “except“, Add “heat test,“. 2 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3 MIL-I-287b3C (2) 58 9999906 OL5qbbb h m! I -1 I 1- MIL-I-28763C(EC) AMENDM
16、ENT 2 PAGE 30 * 4.5.2: Delete. 4.5.3: Add as last sentence: “If a failure occurs, the contractor shall, at no additional cost to the Government, analyze the failure, determine the corrective action required, implement and demonstrate the effectiveness of the corrective action to the satisfaction of
17、the Government. After “4.61, Add the following new paragraphs and figure: “4.7 Leakage current. Leakage current shall be measured at 115 volts (V), 60 Hz and 400 Hz. Leakage current shall be measured on one equipment of the first months production. WARNING THIS TEST MAY BE HAZARDOUS DUE TO THE UNGRO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI28763C21985INTERROGATORSETANUPX27ANUPX27 询问 设备 PDF

链接地址:http://www.mydoc123.com/p-979847.html