NAVY MIL-HDBK-1013 5-1988 STEEL-PLY WALL HARDENING SELECTION AND INSTALLATION《淬火钢模板 选择和安装》.pdf
《NAVY MIL-HDBK-1013 5-1988 STEEL-PLY WALL HARDENING SELECTION AND INSTALLATION《淬火钢模板 选择和安装》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-HDBK-1013 5-1988 STEEL-PLY WALL HARDENING SELECTION AND INSTALLATION《淬火钢模板 选择和安装》.pdf(48页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-HDBK71013/5 3 1 JANUARY 1988 MILITARY HANDBOOK STEEL-PLY WALL HARDENING SELECTION AND INSTALLATION GUIDE AMSC NIA . DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE: DISTRIBUTION IS UNLIMITED F , AREA FACR THIS DOCUMENT CONTAINS y,f PAGES. _ - C Provided by IHSNot for ResaleNo reproduction o
2、r networking permitted without license from IHS-,-,-MIL-HDBK-L013/C FA 9999970 602i545 I - MIL-HDBK-1013/5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-L013/5 FA W 7777770 002q5qb 3 1 MIL-HDBK-1013/5 ABSTRACT This publication provides gui
3、dance for the selection and installation of various steel and plywood wall hardening retrofit systems. The use of a selected system will provide additional protection to Naval arms, ammunition, .and explosives against theft and sabotage by both increasing the time required for unauthorized entry and
4、 hardening the facility against ballistic penetration of small arms fire. The Naval Civil Engineering Laboratory (NCEL) has conducted various wall hardening tests, and the results are incorporated in this publication to assist in proper selection of materials. The criteria and considerations present
5、ed within this document complement the decision-making process found in the MIL-HDBK-1013/1, Design Guidelines For Physical Security of Fixed Land-Based Facilities. iii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MLL-HDRK-L023/5 FA 9777970 002q54
6、7 5 MIL-HDBK-1013/5 iV Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i MIL-HDBK-1013/5 FA m 7777970 0024548 7 = I 6 I MIL-HDBK-1013/5 FOREWORD This military handbook has been developed from an evaluation of facilities in the shore establishment, fr
7、om surveys of the availability of-new materials and construction methods, and from selection of the best design practices of the Naval Facilities Engineering Command (NAVFACENGCOM), other Government agencies, and the private sector. It uses to the maximum extent feasible, national professional socie
8、ty, association, and institute standards. Deviations from this criteria, in the planning, engineering, design, and construction of Naval shore facilities, cannot be made without prior approval of NAVFACENGCOMHQ Code 04. Design cannot remain static any more than can the functions it serves or the tec
9、hnologies it uses. Accordingly, recommendations for improvement are Code L30, Port Hueneme, CA 93043, (805) 982-5743. THIS HANDBOOK SHALL NOT BE USED AS A REFERENCE DOCUMENT FOR PROCUREMENT OF FACILITIES CONSTRUCTION. IT IS TO BE USED IN THE PURCHASE OF FACILITIES ENGINEERING STUDIES AND DESIGN (FIN
10、AL PLANS, SPECIFICATIONS, AND COST ESTIMATES). DO NOT REFERENCE IT IN MILITARY OR FEDERAL SPECIFICATIONS OR OTHER PROCUREMENT DOCUMENTS. 1 encouraged and should be furnished to the Naval Civil Engineering Laboratory, I I. V Provided by IHSNot for ResaleNo reproduction or networking permitted without
11、 license from IHS-,-,-flIL-HDBK-LOL3/5 FA W 9999970 0024549 9 MIL-HDBK-1013/5 PHYSICAL SECURITY CRITERIA MANUALS Criteria Number PA NCEL - Title MIL-HDBK-1013/1 Physical Security of Fixed Land-based Facilities DM-13.02 Commercial Intrusion Detection Systems (IDS) LANTDIV . MIL-HDBK-1013/3 Bolt-on In
12、stallation . BIBLIOGRAPHY . REFERENCES INDEX Page 18 19 20 20 21 24 27 28 29 30 31 32 33 34 35 36 6 15 22 26 26 37 38 39 viii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a O O 1.1 Scop , This public MIL-HDBK-1013/5 Section 1: INTRODUCTION tion pr
13、ovides guidance on s lecting and installing retrofit systems to harden existing structures against unauthorized entry and ballistic penetration of small arms fire. Sufficient information is presented in this publication to enable personnel to select and install retrofit systems to harden existing st
14、ructures. This military handbook shall not be used as a reference document for procurement purposes. Further, it shall not be referenced in military or federal specifications or other procurement documents. 1.2 Cancellation. This handbook supersedes no other publication. 1.3 General Safety Notices.
15、Warnings and notes appearing throughout this publication are of paramount importance to personnel and system safety. following general safety notices supplement the specific warnings appearing in this publication. and applied during installation of hardening structures covered herein. Should a situa
16、tion arise that is not covered in the general or specific safety pre- cautions, the Commanding Officer or other authority will issue orders as deemed necessary to cover the situation. The They are recommended precautions that must be understood 1.3.1 Personnel Requirements. Do not install alone. Und
17、er no circumstances shall movement or installation of hardening stock be attempted without the immediate presence of an individual capable of rendering aid. 1.3.2 First Aid and Resuscitation. An injitry, no matter how slight, should never go unattended. Always get first aid or medical attention imme
18、diately. Should an individual stop breathing, initiate resuscitation immediately. A delay could cost the victims life. 1.3.3 General Precautions. (a) All signs and markings that pertain to safety measures shall be displayed. (b) Personnel shall always wear protective eyeshields, clothing, and safety
19、 shoes during installation of sheet stock. catch on sharp corners shall not be worn. Loose clothing that could (c) Manhandling heavy panels shall be avoided. (d) All swinging loads shall be controlled by at least two taglines. (e) A safety/fire watch shall be posted during movement of equipment or f
20、lame cutting operations. measures to have immediate access to and be in full view of all moving equip- ment or flame-cutting operations for the safety of personnel. The safety watch shall take full precautionary (f) All fabrication, installation, and maintenance actions shall comply with appropriate
21、 policies, procedures, and guidelines provided in the Command 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-1013/5 Safety and Health Program, Naval Facilites Engineering Command (NAVFAC) Instruc- tion 5100.11, as well as all other pertin
22、ent NAVFAC 5100 series instructions: 1.3.4 Warnings. Warnings applying to the installation of hardening materials sr existing structures, as covered in this publication, are summarized below. These warnings are repeated throughout the publication following paragraph headings and preceding text where
23、 they apply. WARNINGS Post KEEP AWAY placards along laminate delivery forklift Foute to installation site. (Page 23) Always have sheet stock steadied by at least one man durjng transit via forklift and crane attachment. (Page 23) Safety goggles must be worn by all personnel wAthin direct line of sig
24、ht of power actuator fastener drvers. (Page 23) Safety goggles must be worn when cutting or drillhg polycarbonate. (Page 23) Do not attempt to manually lift or move sheets o stock without assistance. may result from strains or dropped sheets. (Page 24) Serous injury Post KEEP OUT placard at each ent
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILHDBK101351988STEELPLYWALLHARDENINGSELECTIONANDINSTALLATION 淬火 模板 选择 安装 PDF

链接地址:http://www.mydoc123.com/p-979541.html