NAVY MIL-H-24146-1965 HEADS SPRINKLER FIRE PROTECTION FOAM WATER《防火泡沫水洒水器冲头》.pdf
《NAVY MIL-H-24146-1965 HEADS SPRINKLER FIRE PROTECTION FOAM WATER《防火泡沫水洒水器冲头》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-H-24146-1965 HEADS SPRINKLER FIRE PROTECTION FOAM WATER《防火泡沫水洒水器冲头》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-H-24146 2 June 1965 , MILITARY SPECIFICATION HEADS, SPRINKLER, FIRE PROTECTION, FOAM WATER This specification is mandatory for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. - This specification covers foam-water fire extinguishing sprinkler heads for uprig
2、ht or pendant installation in overhead sprinkler systems. 2, APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of the specification to the extent speci- fied herein: . SPECIFICATIONS . FEDERAL QQ-B-613 QQ- B- 6
3、2 6 QQ-B-639 QQ-S-781. . PPP-B-566 PPP-B-601 PP P- B- 62 1 PPP-B-636 PPP-B-640 PPP-B- 665 PPP-B- 67 6 MILITARY Brass, Leaded and Non-Leaded; Flat Products (Plate, Bar, Sheet, and Strip). Brass, .Leaded and Non-Leaded: Rod, Shapes, Forgings and Flat Products with Finished Edges (Bar, Flat Wire, and S
4、trip). Brass, Naval: (Flat Products) Plate, Bar, Sheet and Strip. Steel Strapping, Flat. - - Boxes, Folding, Paperboard. Boxes, Wood, Cleated-Plywood Boxes, Wood, Nailed and Lock-Corner Boxes, Fiberboard Boxes, Fiberboard, Corrugated, Triple Wall Boxes, Paperboard, Metal Stayed (Including Stay Mater
5、ial). Boxes, Set-up, Paperboard MIL-P-116 Preservation, Methods of . MIL-S-901 Shock Test, H. I. (High Impact); Shipboard Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL- H-2 4146 MIL-B-16444 MIL - B- 16541 Bronze, Hydraulic (Ounce Metal): Castin
6、gs. Bronze, Valve: Castings. STANDARDS MILITARY MIL-STD-105 MIL-STD-129 Sampling Procedures and Tables for Inspection by attributes. Marking for Shipment and Storage (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement functio
7、ns should be obtained from the procuring activity or as directed by the contracting officer. ) 2.2 Other publications, - The following document forms a part of this speci- fication to the extent specified herein, Unless otherwise indicated, the issue in effect on date of invitation for bids or reque
8、st for proposal shall apply, OFFICIAL CLASSIFICATION COMMITTEE Uniform Freight Classification Rules. (Application for copies should be addressed to the Official Classification Committee, 1 Park Avenue at 33rd Street, New York, N. Y. 10016.) 3. REQUIREMENTS 3.1 Preproduction sample. - Prior to beginn
9、ing production four samples shall be inspected as specified in 4.4 and 4.5 (see 6.4). 3.2 Material. - Sprinkler head bodies shall be made of bronze conforming to QQ-B-626, MIL-B-16444 or MIL-B-16541. Deflector plates and other fabri- cated parts shall be Naval brass conforming to QQ-B-639 or QQ-B-61
10、3. Support- ing arms shall be of corresponding or other suitable materials resistant to corrosion and high temperature. 3.3. Construction. - The foam-water sprinkler shall have a single, open orifice and a deflector plate firmly supported. The deflector plate shall be supported by one cross yoke of
11、5/32-inch maximum thickness designed to produce a homogeneous conical spray which will not impinge on the overhead. The body shall be designed to introduce and mix air into foam-liquid solution in order to pro- duce foam (see 6.2.2). Unless otherwise specified (see 6. l), the sprinkler head shall in
12、corporate a 1/2-inch National Pipe Threads (NPT) male threaded inlet for installation in galvanized steel fittings. wrench to be used during installation. ler shall be 6-1/2 inches; the maximum width or diameter shall be 2-1/4 inchss. The orifice shall be greater than 1/4 inch diameter. Flat surface
13、s shall be pruvided for a The maximum overall length of the sprink- 3.3.1 Shock and vibration. - Sprinkler heads shall be designed for shock arad vibration, 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-2414b 42 m 77777Ob 0232b37 T m MIL-H-
14、24146 3,4 Drawings. - . 3-4.1 Detail assembly drawings, - The contractor shall submit class A drawings in accordance with MIL-D-963. These drawings shall be certified dimensional drawings of a sprinkler head which has passed the qualification test. All sprinkler heads shall- be manufactured in accor
15、dance with these drawings. 3.5 Marking. - 3.5,l Body marking. - Each sprinkler head shall be clearly marked with the manufacturers name or trade mark, the manufacturers number and the number of this specification. 3. 6 Workmanship. - 3,6.1 All sprinkler heads shall be sound, smoothly cored, true to
16、form, uniform in texture, and free from cold shunts, porosity, or any other defects which may affect their serviceability. They shall be thoroughly cleaned, both inside and outside, and all fins and roughness shall be removed. - 3.6.2 Castings-shall notbe repaired, plugged, or welded without permiss
17、ion from the inspector, which shall be given only when the defects are small (less than 10 percent of a size which would be cause for rejection of the heads) and do not adversely affect the strength, use, or machinability of the castings. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspec
18、tion. - Unless otherwise specified in the con- tract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the rhvern
19、ment, inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. The Government reserves the right to perform any of the - - 4.2 Preproduction inspection, - Preproduction inspection shall consist or the e
20、xamination and tests specified in 4.4 and 4.5. 4,3 Sampling. - 4.3.1 .Lot. - All sprinkler heads offered for delivery at one time shall be considered a lot. 4.3.2 Sampling for visual and dimensional examination. - A random sample of sprinkler heads shall be selected from each lot offered f0.r examin
21、ationof visual and dimensional characteristics in accordance with MIL-STD- 105, at Inspection Level II and shall be examined ;ts specified in 4.4. shall be 1.5 percent defective. . The Acceptable Quality Level 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
22、m IHS-,-,-MIL-H-2414b Li2 7777706 0232b40 b MIL-H-24146 4.4 Visual and dimensional examination. - Each of the sample sprinkler ha the drainage pan, a metal pan at least 9 inches in diameter and about 1 inch high, shall be used to collect the liquid draining during the weighing operation, Prior to te
23、st, (a) the total weight (W1) of the sieve plus drainage pan shall be determined, (b) the weight of the receiving pan (W3) shall be determined and (c) the drainage pan shall be positioned on the labora- tory balance and the balance weights then set to indicate the weight of the drain- age pan. Befor
24、e the foam-application, the sieve shall be wetted with water and then shaken to remove excess water. The sieve shall be nested in the receiving pan and both placed below the funnel. Foam generation shall be staeted and after . 4 Provided by IHSNot for ResaleNo reproduction or networking permitted wi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILH241461965HEADSSPRINKLERFIREPROTECTIONFOAMWATER 防火 泡沫 洒水 器冲头 PDF

链接地址:http://www.mydoc123.com/p-979478.html