NAVY MIL-G-81065 A-1967 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf
《NAVY MIL-G-81065 A-1967 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-G-81065 A-1967 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-810654( OS) 27 March 1967 Superseding MIL-G-o (ep ) 21 May 1964 MILITARY SPECIFICATION GYRO-PENDULUM ASSEMBLY (For Torpedo Mk 46 Mod O and Mk 46 Mod 1) This specification has been approved by the Naval Ordnance Systems Command, Department of the Navy 1. SCOPE 1.1 Scope. This specification cove
2、rs one type of Gyro-Pendulum Assembly, Dwg 2089913, for use in a torpedo. The gyro-pendulum assembly is of one type and class and is referred to herein as the gyro-pendulum. (See 6.1 for description. ) 2. APPLICABJX DOCUMENTS 2.1 The following documents of the issue in effect on date of invita- tion
3、 for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS Military MIL- P-116 MIL-E- 5272 1-8625 MIL-E-17555 Federal Preservation, Methods of Environmental Testing, Aeronautical and Associated Equipment; General Specification for Anodic Coatin
4、gs for Aluminum and Aluminum Alloys Electronic and Electrical Equipment and Associated Repair Parts; Prepara- tion for Delivery of PPP-B-585 Boxes, Wood, Wirebound Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G- 8106 5A( OS ) PPP-B- 591 PPP-B-
5、 601 PPP-B-621 PPP- B- 636 STANDARDS Military MIL-G-8L065A 13 7777706 0358422 1 Boxes, Fiberboard, Wood-Cleated Boxes, Wood, Cleated- Plywood Boxes, Wood, Nailed and Lock-Corner Boxes, Fiberboard MIL-STD- 129 MIL-STD -130 Identification Marking of U. S. Marking for Shipment and Storage Military Prop
6、erty MIL-STD-143 Specifications and Standards; Order of Precedence for the Selection of Soldering Techniques for Standard Type Solder Terminals MIL - STD- 440 m33586 Metals, Definitions of Dissimilar DRAW1 NGS Naval Ordnance Systems Command 2089913 Gyro -Pendulum As semb ly PUBLICATIONS Naval Ordnan
7、ce Systems Command WR-11 QAPO Design and Test of Packaging, Packing, Shipping, and Handling Equipment for Weapon Systems Components 14 Quality Assurance Provisions for Gyro - Pe ndulum As sembly (Copies of documents required by contractors in connection with specific procurement functions should be
8、obtained from the procuring activity or as directed by the contracting officer.) 2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposal sh
9、all apply. 2 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-G-BLOb5A 13 m 7977706.0358423 3 II MIL-G-81065A( OS) NATIONAL BUREAU OF STANDARDS Handbook 28 Screw-Thread Standard for Federal Service (Application for copies should be addressed to
10、the Superintendent of Documents, Government Printing Office, Washington, D. C. 20360. ) 3. REQUIFBMENTS 3.1 Preproduction sample. Unless otherwise specified in the contract or order, a preproduction sample shall: (a) Be manufactured using the procedures proposed for the produc- tion lot. (b) Consist
11、 of three gyro-pendulum assemblies. (c) Be tested as specified in Section 4 herein for the purpose of determining, prior to starting production, that the suppliers production methods are capable of yielding items that comply with the technical requirements of the contract. 3.2 Basie requirements 3.2
12、.1 Materials and treatments of materials and parts. Unless other- wise specified in the contract or order, all materials and treatments of materials and parts used in the manufacture of the gyro-pendulum shall be in accordance with the requirements specified herein and with the applicable documents
13、listed in Dwg 2089913. 3.2.1.1 Selection of materials. Specifications and standards for all materials, parts, and Government certification and approval of processes and equipment, which are not specifically designated herein, and which are necessary for the execution of this specification, shall be
14、selected in accordance with MIL-STD-143, except as provided herein. AN, JAN, or MS Standard parts shall be identified on the drawing by their part numbers. Commercial utility parts such as screws, bolts, nuts, and cotter pins may be used, provided they possess suitable pro O O ho Ln O O pi -P ho0 ho
15、 4% ho Co O O O +I a, d O O0 -P-P Inho 2 O ri - 8 ho Cu O O 7 i ho M O O O ho M O O a* ho5 m E + 3 O +I Cu ri 2 mm En E 2 g2 O0 In on c- CUM +I +I $I 2 *ri *I .a d O *d -P 5 ri O m 2 m *rf m a, k a, -P m k? H 4 % Ei 8 k E 0 a, m n P, O O Cu O -P ri 0 a, m a o O M O -P O Cu O s. O -P a, m k 3 %Pi O0
16、O-P Mm U OCu m o O0 8 -P +I-k 3 +ow -Pa, Oh -P 0.w *a, ola m i? 3 3 O +I Cu 0 a, m k w :x 8 O 0 a, m k a, pi Cu ri O O m alri $SI g 2 P MO m-P *rl ri orl do +I cd rf P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-BL065A 13 7779706 0358427 4
17、. - MIL-G-81065A( OS) n a 2 .rl -P 4 O u H v 3 f3 H rn O * a, k 2 - U a, rn M a, a O rl0 +I 6 3 M In M L) a, rn k a, Pl O O co O U vi -P a? -P rl . - ”_ n U *rl -P a? -P rl bn Co O O +l rl O -P Ln O Y k om a, rna, aJk UM ka, bna a, 53 A- +I +I g orl _ _- U a, rn k a, pi O Cu +I O 3 O -P M 8 9 Provid
18、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-G-810b5A 13 7799706 0358430 O M MIL-G-81065A60S) Table II Vibration Schedule Double Unit Amplitude Condition Ene rg iz ed o* 75 - I Fr e quenc y Acceleration minimum i* 3 I 6-16 - 16-24 3.0 24-40 o. 1 - I
19、 o. 036 3.4.2 Shock . 3.4.2.1 The gyro-pendulum shall be capable of withstanding shock as specified in Table III. Table III Shock Schedule t. Unit Minimum Duration . Peak Magnitude . Condition (gs) - (ms Acceleration Dir e c t i on Nonoperating Ready, non- ope rating 60 8.0 Ready 45 8 5 300 20. o 0*
20、5 0.5 gyro -pendulum, 1 show no 3.4.2.2 Shock; transportation, storage, and handling. The after being subjected to the test specified in 4.5.2.2.2, sha damage and shall meet al1 the requirements of Section 3. 3.4.3 Acceleration. The gyro-pendulum shall be capable of the accelerations specified in Ta
21、ble IV. withstanding 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-G-1065A 13 = 7797906 0358431 2 - MIL-G-810658( OS) Table IV Acceleration Schedule Magnitude Acceleration Direction Condition (g) Nonoperating 25 Forward Ready, non- 35 Aft op
22、e rating Ready 3.4.4 Temperature. The gyro-pendulum shall be capable of conforming to -the requirements of this specification at any temperature within the limits of Table V, in the unit conditions specified in Table V. Table V Tamperature Schedule Condition Temperature Range Nonoperating -45 to ti4
23、0 degrees F Ready, nonoperaiiing Ready and operating O to +lb0 degrees F O to +i60 degrees F 3.4.5 Pressure. The gyro-pendulum shall be capable of withstanding a pressure of 2.7 psia. 3.4.6 Humidity. The gyro-pendulum shall withstand exposure to 95 percent relative humidity at 110 degrees F for eigh
24、t hours without degra- dation of the finish or functional capabilities. 3.4.7 Storage orientation sensitivity. The rms static nuli signai output of each of the five instruments (see 6.1.2) shall not exceed 100 millivolts (mv) after the gyro-pendulum has been stored in any 90 degree pitch or rol1 ori
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILG81065A1967GYROPENDULUMASSEMBLYFORTORPEDOMK46MOD0ANDMK46MOD1MK46MODS01 鱼雷 陀螺 装配 PDF

链接地址:http://www.mydoc123.com/p-979374.html