NAVY MIL-G-81065 A (2)-1971 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf
《NAVY MIL-G-81065 A (2)-1971 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-G-81065 A (2)-1971 GYRO-PENDULUM ASSEMBLY (FOR TORPEDO MK 46 MOD 0 AND MK 46 MOD 1)《MK46MODS 0 1鱼雷陀螺摆装配》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、u - - MIL- G 81065A(OS) AMENDMENT 2 AMENDMENT 1 9 April 1969 MILITARY SPECIFICATION GYRO-PENDULUM ASSEMBLY (For Torpedo Mk 46 Mod O and Mk 46 Mod 1) This amendment forms a part of Military Specification MIGG 81065A(S) of 27 March 1967 and has been approved by the Naval Ordnance Systems Command, Depa
2、rtment of the Navy. Page 5, paragraph 3.3.2.2 (e). Delete and substitute: ”(e) The power factor correction capacitor (C10 on Drawing 2089913) shall be selected so that with 26 plus or minus O. 1 vrms (4.8 kilocycles (kc) plus or minus 10 cps) the current is 290 plus or minus 30 ma at a power factor
3、of O. 8 to O. 96 leading at room temperature. At O degrees and plus 160 degrees F the current shall be 290 plus or minus 50 ma and the power factor O. 8 to O. 96 leading. Page 12, paragraph 4.1. Delete and substitute: “4.1 Responsibility for inspection. Unless otherwise specified in the contract or
4、purchase order, the supplier is responsible for the performance of all in- spection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified her
5、ein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such in- spections are deemed necessary to assure supplies and services conform to prescribed requirements. (. Page 13, paragraphs 4.3.2 and 4.3.2.1. De
6、lete and substitute: “4.3.2 Periodic production sampling. Periodic production samples shall be selected from units that have passed the acceptance inspections of 4.7 satis- factorily. These samples shall be subjected to the tests of 4.6 at an activity designated by the procuring activity. Periodic p
7、roduction sampling shall be as follows: Step 1. Upon initiation of production, select at random 1 unit from each group of 30 units. Upon satisfactory compliance of samples selected from 3 consecutive groups, shift to Step 2. Each sample so selected shall LFSC 13551 - Provided by IHSNot for ResaleNo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILG81065A21971GYROPENDULUMASSEMBLYFORTORPEDOMK46MOD0ANDMK46MOD1MK46MODS01 鱼雷 陀螺 装配 PDF

链接地址:http://www.mydoc123.com/p-979372.html