NAVY MIL-E-23683 A-1976 EXPLOSIVE FITTING MARK 19 MOD 1《1系数19型 爆炸性组件》.pdf
《NAVY MIL-E-23683 A-1976 EXPLOSIVE FITTING MARK 19 MOD 1《1系数19型 爆炸性组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-E-23683 A-1976 EXPLOSIVE FITTING MARK 19 MOD 1《1系数19型 爆炸性组件》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-23683A 13 m 7779706 0303679 5 = MI L-E-23683A (OS ) (Application for copies should be addressed to
2、 the Superintendent of Documents, Government Printing Office, Washington, D. C. 20402.) 3. REQUIREMENTS 3.1 Description. The Explosive Fitting Mark 19 Mod 1 is a hexagonal explosive-loaded housing threaded at one end for mechanically connecting with a mating component. From the other end of the hous
3、ing extends a length of two-conductor cable terminating in a pair of phone tips by way of which a firing voltage is applied to the fitting. The explosive element of the fitting is the Explosive Actuator Mark 22 Mod O which is secured by potting within the threaded end of the housing. The electrical
4、leads of the actuator connect within the housing to the terminals of the cable. tips of the cable after loading of the fitting, serves to maintain the fitting in an electrically safe condition until removal of the clip prior to mounting of the fitting for service use. 3.2 First article sample. Unles
5、s otherwise specified in the contract or order, a first article sample of the fittings shall be manufactured and prepared for delivery using the methods and precedures proposed for the production lot. The sample is for the purpose of determining that, prior to starting production, the contractors pr
6、o- duction methods are capable of producing items that comply with this specification and the design. the contract or purchase order. A binding post spring, placed upon the phone The sample size shall be as specified in 3.3 General requirements. 3.3.1 Fabrication. Material s , fi ni shes, coatings ,
7、 con- struction, and dimensions for the Explosive Fitting Yark 19 Mod 1 (empty) and Explosive Fitting Mark 19 Mod 1 (loaded) shall be in accordance with the requirements of LD 516150 and LD 516153, respec- tively. Examination shall be in accordance with 4.7. 3.3.2 Interchangeability. Component parts
8、 of assembled units (unless otherwi-se specified on the applicable drawings) fabricated in accordance with applicable drawings shall assemble with mating components of the unit without selection for fit or performance. 3.3.3 Threads. Unless otherwise specified, al 1 threads shall be in.accordance wi
9、th the National Bureau of Standards Handbook H28, 3.3.4 Soldering. Soldering shall be in accordance with Requirement 5 of MIL-STD-454. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-23b83A 13 779970b 03o3bd I 6- MI L-E-23683A (OS) 3.4 Performa
10、nce requirements and product characteristics. The fittings shall meet the following performance requirements and -. product characteristics: 3.4.1 Empty assembly. The fol lowing requirements chal 1 pertain to the components of the explosive fitting prior to their -. assembly as the explosive-loaded
11、device. 3.4.1.1 Cleanliness. All components of the empty explosive fitting shall, at the time of acceptance, be completely clean of corrosion, metal chips, oil, grease, dirt, dust, or the like. cleaning shall not damage the surfaces of the components or leave a contaminating residue. Any agent used
12、in 3.4.1.2 Cable assembly. After potting the Shell, Drawing 2289314, and molding it to the cable in accordance with Drawing 2289986, the shell shall withstand a five-pound pull for a minimum of ten seconds without separating or slipping. 3.4.2 Loaded assembly. The requirements of 3.4.2.1 through 3.4
13、.2.7 pertain to the loaded explosive fitting. 3.4.2.1 Cleanliness. All components of the explosive fitting shall be free of dust, oil, grease, metal chips, filings, moisture, corrosion, and such other forms of contamination. 3.4.2.2 Explosive actuator. The Explosive Actuator Mark 22 Mod O shall have
14、 met acceptably all requirements of WS 2090 within 6 months prior to its assembly within the Explosive Fitting Mark 19 Mod 1; documentary proof thereof shall be submitted with each lot of explosive fittings tendered for acceptance. 3.4.2.3 Insulation resistance. The insulation resistance between the
15、 shorted terminals of the explosive fitting and the housing shall be 50 megohms or greater when measured at 500 i- 50 volts DC. This requirement shall be met after conditioning the explosive fitting for no less than 24 hours at a temperature of 78F 5 2F and a relative humidity of 75 5 5 percent. 3.4
16、.2.4 Bridge wire resistance. The bridge wire resistance, when measured at the phone tips of the assembled explosive fitting, shall be between 8 and 13 ohms. - 3.4.2.5 Leakage. After assembly and potting, the explosive fitting shall be capable of withstanding a 100 PSIG hydrostatic pressure applied f
17、or no less than five minutes without leakage or detrimentally af f ec ti ng i ts el ectri cal character i s ti cs. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-E-23683A 13 E 7777906 0303681 3 E MIL-E-23683A( OS) 3.4.2.6 Binding post spring. I
18、mmediately following the loading operation, the leads of the explosive fitting shall be shorted by the Binding Post Spring, Drawing T853142. The binding post spring shall remain on the fitting except during electrical testing and then be replaced until the fitting is installed for service use. When
19、mounted in the binding post spring, each phone tip shall withstand an axial pull of no less than 2 pounds without pulling free from the binding post spring. 3.4.2.7 Function. The Explosive Fitting Mark 19 Mod 1 shall function when the first discharge of a 1 .O microfarad capacitor charged to 40.0 A
20、1.0 volts DC is applied across the phone tips of the fitting. 3.5 Envi ronmental requi rements . 3.5.1 Vibration. The loaded explosive fitting shall meet the requirements of 3.4.2.3 through 3.4.2.6 after being subjected to the vibration test of 4.8.1. 3.5.2 Shock. The loaded explosive fitting shall
21、meet the requirements of 3.4mthrough 3.4.2.6 after being subjected to the shock test of 4.8.2. 3.5.3 Temperature and humidity. The loaded explosive fitting, packaged as in 5.1, shall meet the requirements of 3.4.2.3 through 3.4.2.6 after being subjected to one 14-day JAN TEMPERATURE AND HUMIDITY CYC
22、LE in accordance with MIL-STD-331, Test Method 105.1. 3.5.4 Jolt requirement. The loaded explosive fitting shall not fire or become unsafe when subjected to the jolt test of MIL-STD-331, Test Method 101.1. 3.6 C1 eanup. Al 1 parts, components, and the assembly shall be thoroughly cleaned of loose, s
23、pattered, or excess solder, metal chips, and other foreign matter. 3.7 Workmanship. Workmanship shall be in accordance with . Requirement 9 of MIL-STD-454. 3.8 Safety precautions. The supplier shall observe the safety precautions of DOD 4145.26M, as applicable. 4, QUALITY ASSURANCE PROVISIOS C Provi
24、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-VIL-E-23683A 13 m 777770b 0303682 5 m I I specified in the contract or purchase rdK II - 1 for the performance of al 1 inspection requirements as specified-herein. Except as otherwise specified in the contra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILE23683A1976EXPLOSIVEFITTINGMARK19MOD11 系数 19 爆炸性 组件 PDF

链接地址:http://www.mydoc123.com/p-979007.html