NAVY MIL-DTL-60561 C-2010 THRUSTER CARTRIDGE ACTUATED M25A1 METAL PARTS ASSEMBLY《M25A1金属零件组件弹药驱动推进器》.pdf
《NAVY MIL-DTL-60561 C-2010 THRUSTER CARTRIDGE ACTUATED M25A1 METAL PARTS ASSEMBLY《M25A1金属零件组件弹药驱动推进器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-60561 C-2010 THRUSTER CARTRIDGE ACTUATED M25A1 METAL PARTS ASSEMBLY《M25A1金属零件组件弹药驱动推进器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、 INCH-POUND MIL-DTL-60561C 14 December 2010 SUPERSEDING MIL-T-60561B 21 September 1992 DETAIL SPECIFICATION THRUSTER, CARTRIDGE ACTUATED, M25A1 METAL PARTS ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specifica
2、tion covers the requirements for the M25A1 Cartridge Actuated Thruster Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections
3、 of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whet
4、her or not they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the s
5、olicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-A-2550 Ammunition, General Specification For DEPARTMENT OF DEFENSE STANDARDS MIL-STD-413 Visual Inspection Guide for Elastomeric O-rings (Copies of these documents are available online at https:/assist.daps.dla.mil/ or from the Standa
6、rdization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia PA 19111- 5094.) Comments, suggestions, or questions on this document should be addressed to Department of the Navy, Indian Head Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Mar
7、yland 20640-5085, OFFICIAL BUSINESS, or emailed to amanda.pennnavy.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at https:/assist.daps.dla.mil/. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A: Approved for publ
8、ic release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60561C 2 2.2.2 Other Government documents, drawings, and publications. The following other Government drawings form a part of this document to the extent s
9、pecified herein. Unless otherwise specified, the issues are those cited in the solicitation or contract. DRAWINGS Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203) 11730535 Thruster, Cartridge Actuated, M25A1 Metal Parts Assembly 8797741 Box, Fiberboard (Inner), Packing, Ammunit
10、ion, For Thruster, Cartridge Actuated, M5A2, M20A1, or M25A1 8797742 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M5A2, M20A1, or M25A1 9217579 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge Actuated, M5A2, M20A1, or M25A1 U.S. Air Force TPO 00-554-3
11、103 Thruster, Cartridge Actuated, M25A1 (Application for copies should be addressed to the DEPARTMENT OF THE NAVY, Indian Head Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS.) 2.3 Non-Government publications and drawin
12、gs. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents are those cited in the solicitation or contract AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/AMERICAN SOCIETY FOR QUALITY CONTROL (ASQC) ANSI/ASQ Z1.4 Samp
13、ling Procedures And Tables For Inspection By Attributes ANSI/ISO/ASQ A8402 Quality Assurance Terms And Definitions (Copies of this document are available online at http:/e-standards.asq.org/ or from the American Society for Quality, 600 North Plankinton Avenue, Milwaukee, WI 53203.) 2.4 Order of pre
14、cedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exempti
15、on has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4.4 and 6.3). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DT
16、L-60561C 3 3.2 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufactur
17、e. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surf
18、ace and physical condition of the raw material intended for use in manufacture. 3.3 Hardness and other physical properties. Hardness and other physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be
19、 achieved by quenching and tempering. 3.4 Hydrostatic pressure. The body and head shall withstand a hydrostatic pressure of 8,000 pounds per square inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical failure (see 6.4.1). 3.5 Structural strength. The assembled thruster sha
20、ll withstand a static tensile force of 2,000 pounds, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechanical failure (see 6.4.1). 3.6 Shear pin strength. The shear pin, after application of protective finish, shall shear when a load of 48 4 pounds is applie
21、d at the steady rate of 0.125 inch per minute. 3.7 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.8 Protective finish. Protective finish shall be in accor
22、dance with the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.9 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either direction using procedures in 4.6.6. 3.10 Wo
23、rkmanship. Thrusters shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.10.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity, or any similar defect. 3.10.2
24、Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.10.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. VERIFICATION 4.1 Clas
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL60561C2010THRUSTERCARTRIDGEACTUATEDM25A1METALPARTSASSEMBLYM25A1 金属 零件 组件 弹药 驱动 推进器 PDF

链接地址:http://www.mydoc123.com/p-978858.html