NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf
《NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-46606 B-1991 DELAY ELEMENT CARTRIDGE M8 ASSEMBLY《M8型炮筒延迟发射装置》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-46bObB 13 9999906 0476826 I W I INCH-POUND -1 MILITARY SPECIFICATION MILD-46606B 23 Aori1 1991 SUPERSEDING MILD-46606A 31 July 1968 Amendment 1 DELAY ELEMENT, CARTRIDGE, M8 ASSEMBLY is specification is approved for use by all Departments and Agencies of the Deparhnent of Defense. 1. SCOPE 1.1
2、Scope. This specification covers the requirements for the M8 Cartridge Delay Element (see 6. i). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications and standards form a part of this document to the extent specified herein. U
3、nless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). 0 SPECIFICATIONS MILITARY MIL-B-550 Barium Chromate MIL-A-2550 Ammunition,
4、General Specification for MIL-B-51092 Baron, Amorphous, Powder MIL-(2-60539 Coating, Anodic, Conventional for Aluminum and Aluminum Alloy Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commandi
5、ng Officer, Naval Ordnance Station, Standardization Branch (3730), Indian Head, Maryland 20640-5000, by using the self addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for p
6、ublic release; distribution is unlimited. 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbBbB 13 = 999990b 047bA27 3 L MIL-D-46606B STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-453 Inspection, Radiographic MIL-STD-8 10 Sampling Proce
7、dures and Tables for Inspection by Attributes Quality Assurance Terms and Definitions Environmental Test Methods and Engineering Guidelines (Unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Building 4D, 7
8、00 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DR
9、AWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) DL8593 163 Delay Element, Cartridge, M8, Assembly 8826728 Ammunition, Container, Metal, M21 for Delay Element, M5 or M8 8826729 Box, Packing, Ammunition, for Delay Element, M5 or M8 in Metal Container M21 (Application for copies should be ad
10、dressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5000.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this doc
11、ument, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a first article sample shall be subjected to first article inspection (see 4.4, 6.2, and 6.3). 3.2 Conformanc
12、e to documents. The M8 delay element covered by this specification shall be manufactured in accordance with DL8593 163 and all documents listed thereon. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4660bB 13 W 9999906 0476828 5 W MIL-D4660
13、6B 3.3 Materiais. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufact
14、ure. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Components. 3.4.1 Primary components. For the purpose of this specification, the M42 Primer, Delay Charge and the output material charge.are cons
15、idered primary components. Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot (see 6.7). 3.4.1.1 Primer. The primer shall conform to the applicable drawing and
16、reference specification. Only percussion primers from lots manufactured within the last 24 months or recertified within the last 12 months shall be used in these units. Prior to assembly into a delay element, the primer shall be visually examined in accordance with 4.6.5 and radiographically examine
17、d for defects as specified in 4.7.1. 3.4.2 Protective finish. The finish of each component part shall be in accordance with MIL-Cd0539 and the applicable drawing (see 4.7.2). 3.5 Assembly. 3.5.1 Radiographic examination. Each delay element assembly shall be radiographically examined for defects (see
18、 4.7.3). 3.5.2 Vibration. The assembled delay element shall withstand vibration as prescribed in MIL-STD-810, Method 514.3, Test Procedure I, Test Condition 1-3.2.5 without evidence of any disintegration of the primer, propellant, or igniter, or derangement of any component (see 4.7.4 and 6.2). 3.6
19、Functional requirements. 3.6.1 Delay element performance. 3.6.1.1 Misfires. The ignition delay element shall not fail to fire. 3.6.1.2 Ballistics. The ignition delay charge shall consist of barium chromate, as specified in MIL-B-550, and boron, as specified in MIL-B-51092, in the proportion and quan
20、tity fixed by the contractor to produce the ignition delay times required in table I (see 6.6. i). 3.7 Workmanship. Delay elements shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3 Provided by IHSNot for R
21、esaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-4bbObB 13 W 999990b 0476829 7 H 195 to 205 MIL-D-4660633 .80 1.10 TABLE I. Ballistic reuuirements. Ignition delay time (sec) I I Temperature (O F) I Lower I upper I II -60 to -70 I .90 I 1.30 II 11 65 to 75 I .90 I 1.10
22、II 3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSUR
23、ANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase or
24、der, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD46606B1991DELAYELEMENTCARTRIDGEM8ASSEMBLYM8 炮筒 延迟 发射 装置 PDF

链接地址:http://www.mydoc123.com/p-978337.html