NAVY MIL-C-85003 B (1)-1986 CHAFF CARTRIDGE (TYPE RR-( ) AL) GENERAL SPECIFICATION FOR《RR-( ) AL型金属碎箔炮筒总说明书》.pdf
《NAVY MIL-C-85003 B (1)-1986 CHAFF CARTRIDGE (TYPE RR-( ) AL) GENERAL SPECIFICATION FOR《RR-( ) AL型金属碎箔炮筒总说明书》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-85003 B (1)-1986 CHAFF CARTRIDGE (TYPE RR-( ) AL) GENERAL SPECIFICATION FOR《RR-( ) AL型金属碎箔炮筒总说明书》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、t MIL-C-85003B (1) 58 = 7797706 0173172 T = MI L-C -85003B (AS) AMENDMENT 1 21 OCTOBER 1986 MI L ITARY SPEC I F ICATION CHAFF CARTRIDGE (TYPE RR-( )/AL), GENERAL SPECIFICATION for This amendment forms a part of Military Specification MIL-C-85003B(AS) dated 17 May 1983 and is approved for use within
2、the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 5 3.4.3: Delete “MK 131 MOD O and QII-1623-03 impulse cartridge“ and substitute “CCU-41/B (QII-1627-03) impulse cartridge“. PAGE 6 3.8.1: Delete “an oute
3、r case, cap, squib retainer,“ and substitute Ia one piece case/squib retainer, end-cap“. 3.8.2: Delete in its entirety and substitute: “3.8.2 Marking. The side of each cartridge and top of end-cap shall be marked in accordance with the requirements of MIL-STD-130, DL 1050AS126 and the applicable spe
4、cification sheet. The end-cap shall be the color as specified in the applicable specification sheet.“ PAGE 7 4.1.2: Delete in its entirety. 4.2.2: Lines 4 and 5: Delete “table I“ and substitute “Table I“. PAGE 8 Table I, High Temperature, Chaff Cartridge Group 3: Delete “X“. 4.3: “4.3 Initial produc
5、tion inspections. Ninety of the first 1,000 Delete in its entirety and substitute: production .chaff cartridges shall be selected and sent. at the contractors expense to a designated Government laboratory for inspection. No other AMSC No. NIA 1 of 4 FSC 5865 DISTRIBUTION STATEMENT A: Approved for pu
6、blic release, distribution is unlimited. - .- r THIS DOCUMENT CONTAINS 6 PAGES. Licensed by Information Handling Services1 MIL-C-5003B (1) 58 7977706 0173173 1 MI L-C-85003B (AS) AMENDMENT 1 inspections, other than those designated below, shall be conducted on the samples prior to starting the initi
7、al production inspections. The first article units shall not be selected for this inspection. The Government laboratory inspection procedures shall include, but not be restricted to, the procedures of 4.6, 4.7, 4.8.2 and 4.11. Initial production inspection shall. also include ground test firing (4.9
8、 and 4.9.2) and shall be conducted by the contractor or a Government approved facility. The ground test firing samples shall also be selected from the same first 1,000 production chaff cartridges, The initial production inspection samples shall be selected by the Government representative after they
9、 have successfully passed al 1 the production individual inspection procedures of 4.4.1 and material inspections of 4.6. The contractor shall also inspect to the procedures of 4.8.2, the cartridges selected by the Government representative prior to the contractors ground test firing and shipment to
10、the Government laboratory of the ninety cartridges noted above. I PAGE 11 4.6.1 .1.2 : Del ete II (M1 O 1 ) II . PAGE 12 4.6.1.2.1: Bel ete l(Mi02)“. 4.8.1: Delete “(M103)“. Sixth line, delete “squib retainer, piston and fiber dividers“ and substitute “end-cap“. and substitute “squib retainer“, and
11、delete “1“ and substitute IQ.5“. The ninth line, delete “between the end-cap“ and substitute “through the squib retainer against the piston“. substitute “piston“. Delete the last sentence and substitute: “Following the test the cartridge may be returned to the production lot, provided the cartridge
12、components are not damaged during performance of the test and a new end-cap is utilized.“. The eighth 1 ine, delete “end-cap“ The 10th and 16th line, delete “end-cap“ and PAGE 13 4.8.2: Delete I(M104)“. The second sentence, delete: “One hundred samples from the initial production units“ and substitu
13、te “all of the initial production samples (90 plus ground fire cartridges)“. 4.9.3: Delete in its entirety and substitute: “4.9.3 Quality conformance test firings. Cartridge case quality conformance inspection test firinqs shall be the test of 4.9.2 conducted on cartridges utilizing samples selected
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC85003B11986CHAFFCARTRIDGETYPERRALGENERALSPECIFICATIONFORRRAL 金属 炮筒 说明书 PDF

链接地址:http://www.mydoc123.com/p-978139.html