NAVY MIL-C-82735-1984 CATAPULT AIRCRAFT EJECTION SEAT CKU-5 A A REWORK ASSEMBLY《CKU-5 A A型再造飞机弹射座椅弹射器组件》.pdf
《NAVY MIL-C-82735-1984 CATAPULT AIRCRAFT EJECTION SEAT CKU-5 A A REWORK ASSEMBLY《CKU-5 A A型再造飞机弹射座椅弹射器组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-82735-1984 CATAPULT AIRCRAFT EJECTION SEAT CKU-5 A A REWORK ASSEMBLY《CKU-5 A A型再造飞机弹射座椅弹射器组件》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION CATAPULT, AIRCRILFT EJECTION SEAT: CKtJ-!j/A/A REWORX ASSEMBLY This specification is approved for use by the Naval Sea Systems Command, Department of the Navy, and is available for use by all Departments and agencies of the Department of Defense. I SCOPE 1.1 Scope. This specif
2、ication establishes the requirement for the refurbishment of the CK-S/A/A and CK-5/A rocket catapults which includes renovation of salvageable hardware, regraining, and replacement of non-repairable components. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unl
3、ess otherwise specified, the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DODISS) specified in the solicitation form a part of this specification to the extent specified herein. SPECIFICATIONS PIIILITARY
4、MIL-C-82733 Cartridge, Impulse, CCU-22/A/A Assembly MIL-C-82734 STANDARDS MILITARY MIL-STD-413 KI L-S TD- 4 5 3 Catapult, Aircraft Ejection Seat, CK-5/A/A Assembly Visual Inspection Guide for Elastomeric O-Rings Inspection, Radiographic 1.iSI 7983 Compass-Magnetic, Pilots Standby Beneficial comments
5、 (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station Standardiaation/Documentation Division ( 5241, Indian Head, MD by ushg the self-addressed Standardization Document Improve
6、ment Proposal (DD Form 1426) appearing at the end of this document or by letter. 20640 - I : -2 I. , , . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.2 Other Government documents, drawings, and publications. The following other Government docu
7、ments, drawings, and publications form a part of this spec- ification to the extent specified herein. DRAWINGS Naval Sea Systems Command (Code Ident 53711 ) DL 5184322 PL 5184328 Catapult, Aircraft Ejection Seat, CK-S/A/A Assembly Catapult, Aircraft Ejection Seat, CKlJ-5/A/A Metal Parts Assembly 52
8、8431 9 Tube, Booster 51 84322 Catapult, Aircraft Ejection Seat, CK-S/A/A Assembly 51 84323 51 84328 Cartridge, Impulse, CCU-22/A/A Assembly Catapult, Aircraft Ejection Seat CKU-5/A/A Metal Parts Assembly (Copies of specifications, standards, drawings, and publications required by manufacturers in co
9、nnection with specific procurement functions should be obtained from the contracting activity or as directed by the contracting officer). 2.2 Other publications. The following document forms a part of this specification to the extent specified herein. DOD shall be issued as listed in the current DOD
10、ISS and the supplement thereto, if applicable. The issue of the document which is indicated as MlERICAN NATIONAL STANDARDS INSTITIITE (ANSI ) B46.1-78 (Application for copies should be addressed to the American National Standards Surface Texture (Surface Roughness, Waviness and Lay) Institute (ANSI)
11、, I430 Broadway, New York, N.Y. 10018). 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS 3.1 First article. inspection (see 4.3). Wen specified, a sample s
12、hall be subject to first article 3.2 Conformance to documents. Materials, parts and assemblies, reclaimed and new, shall comply with the requirements specified on DL 5184322, applicable drawings, and referenced documents. 2 / Provided by IHSNot for ResaleNo reproduction or networking permitted witho
13、ut license from IHS-,-,-MIL-C-82735 13 0b 03b2767 O MIL-C- 82735 ( OS) 3.3 Catapult receipt, inspection, and disposition. The following procedures 3.3. I Government furnished material. Government furnished material (GFM) shall be inspected during the disassembly process to ascertain reclaimable comp
14、onents are not damaged. shall be followed: * 3.3.2 Reuseable components. The components listed in TABLE I are expected to have a 90 percent recovery rate and be retained for modification and/or reuse. TABLE I. Reusable components. Component Number required Drawing/part number I/ Tang - I/ Breech - N
15、ozzle Tube, Booster Tube, Launcher, Tube, Motor Plug, Breech Tube Assy I I 726657 I 1744253 11 743979 I 1743978 I I 726656 I I 726800 I 7726650 51 8431 5 I1 744249 - Repair threads as necessary 3.3.3 New components. The reworked catapult assembly shall cor:tain new components as listed in TABLE II.
16、* TABLE II. Required new components. Component Number required Screw I O-ring I O-ring 4 O-ring 2 O-ring I O- ring 2 O-ring I O-ring I O-ring 4 Set Screw, Hexagon Socket I Set Screw, Hexagon Socket I CUP I Seal I Pin 2 Cap, Protective I Lockwire 2 Pin, Spring 2 Spring, Tang I Retainer I Head I O-rin
17、g As Required 3.3.3.1 Nozzle. Nozzles conforming to Dwg. revisions may be used in the rework assembly. Ref er en ce/Dr awing MS35266-79 988AS150-2 (AS568-010)MS29513-01 0 988ASI 50-2 (AS568-02O)MS29513-020 988ASl50-2 (ASj68-024)MS29513-024 988ASl50-2 (AS568-OI4)29513-014 988AS150-7 (AS568-228)ZZR-76
18、%-228 988AS150-2 (AS568-026)MS-29513-026 988Asi 50-2 (As568-i 20)MS-29513-120 988150-2 (AS568-022)MS29513-022 MS28788-4 Ifs51 963-37 1 1726799 I i726798 I 1744252 I 1740596 11 735367 1 1726660 I 1744248 I 1744255 MS51963-34 MSI 71 522 I1 743978 revision (E) and subsequent All others must be replaced
19、. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82735 13 = 777790b 03b2768 2 I/ MIL-C- 82735 ( OS) 3.3.3.2 - Cartridge Assembly. The cartridge assembly shall be manufactured in accordance with Dwg. 5184323 and shall comply with the requiremen
20、ts of MIL-C- 82733. prior to the contract scheduled delivery date for the catapult assembly lot shall be installed in the CKU-5/A/A rework assembly (Dwg. 5184322). Only new CCU-22/A/A impulse cartridges manufactured within 12 months 3.3.4 Propellant, The propellant used shall be manufactured within
21、I50 days of the contract scheduled delivery date for the reworked catapult assembly lot. 3.3.5 Modified components. Conversion of CK-5/A catapults and CKU-5/A/A catapults to the latest CKshall not be loosened or deformed when subjected to a break- away torque of 200 inch-pounds. function without mec
22、hanical failure and shall meet the ballistic requirements of 3.8 Ballistics. The catapult, loaded with acceptable explosive components, shall MIL-C- 82734 3.9 Radiogrzhic requirements. Each loaded rocket catapult shall be radiograph- ically inspected for the presence, condition, and correct placemen
23、t of internal component s. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-rr MIL-C-82735 13 m 7777706 03627b7 4 M MIL-C-82735( OS) 3.10 Workmanship. The workmanship shall be that required by the applicable . drawings, referenced specifications and t
24、he best industrial practices governing the quality production of interchangeable parts for maintaining the dimensions, finishes, tolerances, and quality specified herein. All components and assemblies shall be free from burrs, contamination, corrosion, sharp edges, or foreign material which could re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC827351984CATAPULTAIRCRAFTEJECTIONSEATCKU5AAREWORKASSEMBLYCKU5AA 再造 飞机 弹射 座椅 弹射器 组件 PDF

链接地址:http://www.mydoc123.com/p-978107.html