NAVY MIL-C-82686-1979 CATAPULT AIRCRAFT EJECTION SEAT CKU-7 A REWORK ASSEMBLY《CKU-7 A型再造飞机弹射座椅弹射器组件》.pdf
《NAVY MIL-C-82686-1979 CATAPULT AIRCRAFT EJECTION SEAT CKU-7 A REWORK ASSEMBLY《CKU-7 A型再造飞机弹射座椅弹射器组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-82686-1979 CATAPULT AIRCRAFT EJECTION SEAT CKU-7 A REWORK ASSEMBLY《CKU-7 A型再造飞机弹射座椅弹射器组件》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、, -hg 1 Spring, Grain 1 Ville, Wk 2 MS16625-1259 MS29513-O12 MS29513-120 M929513-117 MS29513-O20 MS29513-148 hB29513-223 hE9021-34 PIS9021- 36 MS51963-35 MS51963-20 10551585 10551415 11820367 10533782 11731754 10533781 MS9048-104 Ring, Back-Qp 1 518t3G Release 1 1.05 5 14 16 Cam 1 10551411 Screw 2 1
2、1731753 Plug, Protective 1 MS5501/10-F4 4 II -II - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82bb 13 W 9779706 0362575 2 MIL-C-82686 3.2.3.1 Release. Replace the release, which has a 0.14 inch (in.) wide x 0,826 in. diameter O-ring groove
3、 in accordance with Dwg. 10551416, revision B, with a release which has a 0.17 in. wide x 0.831 in. diameter O-ring groove in accordance with Dwg. 10551416. Releases which have 0.17 in, wide X 0.831in. diameter O-ring groove, and conform to Dwg. 10551416, may also be used in the rework assembly. 3.2
4、.3.2 e. Replace the cams having a 1/16 in. radius in accordance with Dwg. 10551411, revision D with cams having a 114 in. radius in accordance with Dwg. 10551411. Cams which have % in. radius and conform to Dwg. 10551411, may also be used in the rework assembly. 3.2.3.3 Cartridge assembly. Only new
5、14270 impulse cartridges manu- factured within 12 months prior to the contract scheduled delivery date for the catapult assembly lot in accordance with Dwg. 10551431, and comply with the requirements of MIL-C-14814, shall be installed in the CKU 7/A rework assembly, Dwg. 11820361. 3.2.3.4 Propellant
6、. Only new sleeve and grain assemblies manufactured within 12 months prior to the contract scheduled delivery date for the catapult assembly lot in accordance with Dwg. 11820365, and conform. to the requirements of MIL-S-48567, shall be installed in the CKU-7/A rework assembly, Dwg. 11820361; 3.2.4
7、Modified components. Conversion of M38 and CKU-PIA catapults to the latest CKU-7/A catapult configuration shall be accomplished by modifying the following components: 3.2.4.1 Booster tube. Modify the booster tube which has a 0.995 in. outside diameter and single O-ring groove configuration in accord
8、ance with Dwg, 10551422, Revision C, to the dual O-ring groove configuration in accordance with Dwg. 5184310. grooves Booster tubes which have dual O-ring and conform to Dwg. 10551422 may also be used in the rework assembly. 3.2.4.2 Launcher tube. Modify the launcher tube in accordance with Dwg, 105
9、51423 by eliminating the two nylon pellets, Dwg. 8594155. 3.2.4.3 Track. Modify the track in accordance with Dwg. 10551421 by machining cross sections A-A, B-B, C-C, and D-D to allow for teflon finish. 3.2.4.4 Retainer. Modify the retainer which has a 318 in. radius in zone D-7 in accordance with Dw
10、g. 10551418, Revision C, to the configuration shown of Dwg. 5184309. Retainers which have 3/16 and 114 in. radii in zone D-7 and conform to Dwg. 10551418 may also be used in the rework assembly. 3.3 Hydrostatic pressure. The components listed in TABLE III shall withstand the corresponding internal p
11、ressure for 15 seconds (s) minimum, without application of any external load, and shall thereafter show no evidence of leakage or mechanical failure. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82686 TABLE III. Internal pressure requireme
12、nts. , I I I mnent I Hydrostatic pressure psi, minimum Booster tube (10551422) 11, mo Launcher tube (10551423) 11,000 Motor tube (10551424) 5,000 t 3.4 Torque. Torque shall be as specified in TABLE IV. No lo or deformation shall occur upon application of breakaway torque. TABLE IV. Torque values. Co
13、mponents . , . - -. . . . . - -. Booster tube assembly 10551422 to Head 10551412 8 Launcher tube assembly I 10551423 to Mount 10551413 ! Seating or bottoming (Inch-pounds) ._._ -_- _ 400 + 50 -0 400 + 50 -0 . . . . , . - . . -. . ._ enin -I-.- Breakaway 200 200 . - - - 3.5 Residual magnetism. The as
14、sembled catapult shall not deflect the indicator of a MS17983 compass more than5 in either direction when passed in front of the compass at a distance of 6 inches. 3.6 Nozzle leak test. Nozzle balllretainer O-ring shall show no indications of leakage throughout the operational range of the swivel no
15、zzle. 3.7 Release O-ring leak test. Release O-ring shall show no indication of leakage when subjected to test pressure. 3.8 Shear pin strength. Shear pins shall shear when subjected to a radial load of 41 t: 5 lbs. applied at the rate of 0.125 inches per minute. 6 Provided by IHSNot for ResaleNo rep
16、roduction or networking permitted without license from IHS-,-,-NIL-C-BZbb 13 W 779970b 03b2577 b = MIL-C-82686 3.9 Protective finish. Protective finish shall be in accordance with the applicable specification referenced on the drawings and shall apply to all surfaces regardless of configuration. ext
17、erior components shall have the existing protective finish stripped and the specified protective finish reapplied (see 6.4). Remanufactured 3.10 Workmanship. The requirements of workmanship shall be as specified on the applicable drawings, referenced specifications and the following: 3.10.1 Metal de
18、fects. All components shall be free from cracks, splits, cold shots, inclusions, porosity or other metal defects, 3.10.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.10.3 Foreign matter.
19、No part of the assembly shall contain chipe, dirt, oil, rust, corrosion or other foreign matter, 3.11 Ballistics. The catapult, loaded with acceptable explosive components, shall function without mechanical failure and conform to the requirements of MIL-C-48568. 3.12 Radiographic requirements. Each
20、loaded rocket catapult shall be radiographically inspected for the presence, condition, and correct placement of internal components. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of al
21、l inspection requirements as specified herein. in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspectio
22、ns set forth in the specifi- cation where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise specified 4.2 Classification of inspections. The requirements specified herein are for quality conformance inspection (see 4.4). 4.3
23、 Inspection conditions. Unless otherwise specified (see 6.2), all inspections shall be performed under the following conditions: a. Temperature: Room ambient 18 to 35OC (65 to 95F) b. Altitude: Normal ground C. Vibration: Not applicable d, Humidify; Room ambient to 95 percent relative, maximum 7 Pro
24、vided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-82686 4.4 Quality conformance inspection. The quality conformance inspection shall consist of the examinations of 4.5 and the tests of 4.6 performed on samples selected in accordance with 4.4.2 and 4
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC826861979CATAPULTAIRCRAFTEJECTIONSEATCKU7AREWORKASSEMBLYCKU7A 再造 飞机 弹射 座椅 弹射器 组件 PDF

链接地址:http://www.mydoc123.com/p-978097.html