NAVY MIL-C-22937-1961 CONTROL-MONITOR DCU-74 A《DCU-74 A控制监控》.pdf
《NAVY MIL-C-22937-1961 CONTROL-MONITOR DCU-74 A《DCU-74 A控制监控》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-22937-1961 CONTROL-MONITOR DCU-74 A《DCU-74 A控制监控》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION CONTROL-MONITOR DCU- 74/A This specification has been approved by the Bureau of Naval Weapons, Department of the Navy. 1. SCOPE 1.1 Scope - The equipment covered by this specification shall be of one type and shail monitor and control certain airborne armament stores. 2. APPLI
2、CABLE DOCUMENTS 2.1 General - The foilowing documents of the issue in effect on the date of invitation for bids form a part of this specification to the extent specified herein: SPECIFICATIONS Military MIL-W-5088 Wiring, Aircraft, Installation of MIL-E- 5400 Electronic Equipment, Aircraft, General S
3、pecification for MIL-T-5422 MIL-I- 61 81 MIL-C-6781 MIL-E-17555 Testing, Environmental, Aircraft Electronic Equipment Interference Control Requirements, Aircraft Equiphent Control Panel: Aircraft Equipment, Rack or Console Mounted Electronic and Electrical Equipment and Associated Repair Parts, Prep
4、aration for Delivery of MIL- T-18303 STANDARDS Military MIL-STD-704 Test Procedures; Preproduction and Inspection, For Aircraft Electronic Equipment, Format for Elatric Power, Aircraft, Characteristics and Utiliz;ation of Provided by IHSNot for ResaleNo reproduction or networking permitted without l
5、icense from IHS-,-,-Ms 26246 Connections, input Power Airborne Electronic Eaubment: 28-Volt DC, 115-Volt Single-Phase AC, il!5/300 Vlt 3-Phase AC, or Combi cables, shali be a design and shall not exceed 2 pounds. -K- however, it may be reworked by the contractor and submitted for acceptance as a pro
6、duction equipment, Equipments supplied under the contract shall in all respects, including design, constrution, workmanship, performance and quality be equivalent to tne approved preproduction sample. Each equipment shall be capable of successfully passing the same tests imposed on the preproduction
7、 sample. Evidence of non-compliance with the above shall constitute cause for rejection or if already accepted by the government it shall be the obligation of the contractor to make pecessary corrections as approved by the procuring activity, equipment shall be selected from the first 10 production
8、equipments submitted for acceptance and sent to a designated government laboratory ?or tests. The equipment shall be selected by the government inspector after the equipment has successfully passed all individual teste. 4.2. 5 4.3 Production Sample Tests - When requested by the procuring activity, o
9、ne 4.3.1 Scope of Tests - This equipment may be subjected to any and all tests the procuring activity deems necessary to assure that the production equipment is equivalent to the approved preproduction sample in design, construction, workmanship, performance and quality and that it is capable of mee
10、ting all applicable requirements. Production Sample Approval - Approval of the production sample shall be by the procuring activity upon satisfactory completion of all tests. Any design, material or performance defect made evident during this test shall be corrected by the contractor to the satisfac
11、tion of the procuring activity. Upon failure of the production sample to pass any of the tests, delivery of equipment under the contract shall cease until proper corrective action iS approved and awomplished. Corrective action shall also be accomplished on equipment previously accepted when requeste
12、d by the procuring activity. sample test the equipment shall be reworked by the contractor by replacing all wear or damaged items. After reworking the contractor shall resubmit the equipment for acceptance, 4.3.2 4?3.3 Reconditioning of Production Test Sample - On completion of the production 4.4 Ac
13、ceptance Tests - The contractor shall furnish all samples and shall be responsible for accomplishing the acceptance tests. All inspection and testing shall be under the supervision of the government inspector. Contractors not having testing facilities satisfactory to the procuring activity shall eng
14、age the service of a commercial testing laboratory acceptable to the procuring activity, The contractor shall furnish test reports showing quantitative results for all acceptance tests, Such reports shall be signed by an authorized representative of the contractor or laboratory, as applicable. Accep
15、tance or approval of material during the course of manufacture shall not be construed as a guarantee of the acceptance of the finished product. Acceptance tests shall consist of the following: (1) Individual Tests (2) Sampling Tests (3) Special Tests 8 Provided by IHSNot for ResaleNo reproduction or
16、 networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MXL-C- $2937 (WEP) . Quantity of Equipment6 3 Special Tests - Special tests shall be conducted on a quantity of equipments for the purpose of 6hecking
17、th e effect of any design or material change on the performance of the equipment and to assure adequate quality control. The equipment selected for special tests may be selected from equipments previously subjected to the sampl$ tests. 4.4.3.1 made as follows; except that when a Production Sample is
18、 requested and delivered to a government laboratory for test (See gara, 4.3) the requirement for a special test on an early production equipment may be omitted. Special Tests Schedule - Selection of equipments for special tests shall be (1) On an early production equipment. (2) On aa early equipment
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC229371961CONTROLMONITORDCU74ADCU74A 控制 监控 PDF

链接地址:http://www.mydoc123.com/p-977566.html