NAVY MIL-C-22845 A-1968 CARTRIDGE DELAY MARK 35 MOD 0《0型35号延时炮弹》.pdf
《NAVY MIL-C-22845 A-1968 CARTRIDGE DELAY MARK 35 MOD 0《0型35号延时炮弹》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-22845 A-1968 CARTRIDGE DELAY MARK 35 MOD 0《0型35号延时炮弹》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-22845A (AS) 2- Superseding MIL-C-2284.5 (Wep) 20 February 1961 MILITARY SPECIFICATION CARTRIDGE, DELAY, MARK 35 MOD O This specification has been approved by the Naval Air Systems Command, Department of the Navy, 1, SCOPE 1,l This document governs the manufactureo assembly and preparation for
2、delivery of the MARK 35.MOD O delay cartridge and the methods of inspection and tests upon which product acceptance will be based, 2, APPLICABLE DOCUMENTS 2-1 The following specifications, standards, drawings and publications, of the issue in effect on date of invitation for bids, form a part of thi
3、s document to the extent specified herein, SPECIFICATIONS Military MIL-D-21625 MIL-M-21383 MIL-P-20444 MIL-P-116 Design and Evaluation of Cartridges for Cartridge Actuated Devices Manganese Delay Composftion Primer, Percussion, M42, Loading, Assembling and Packing Preservation, Methods of MIL-P-2226
4、4 Powders, Ignition, Gasless r- -. THIS DOCUMENT CONTAINS 19 PAGES. -* Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-22845A 13 m 7779706 03027Lt 4 m MIL-C-2 2845A (AS ) STANDARDS Military MIL-STD-105 MIL-STD-129 DRAWINGS Bureau of Naval Weapo
5、ns LD 419707 LD 537899 LD 537900 Ordnance Corps of the Amy Ordnance Dwg, 8799925 PUBLICATIONS BUSANDA Instruction 4030,17 Bureau of Naval Weapons OP 5 WR-43 Sampling Procedures and Tables for Inspection by Attributes Marking for Shipment and Storage Cartridge, Delay, MARK 35 MOD Op List of Drawings
6、and Specifications Container, Inner, for Cartridges, Power Source, List of Drawings and Specifications Container, Outer, for Cartridges, Power Sourceo List of Drawings and Specifications Priqer, Percussion, M42, Assembly Preservation, Packaging, Packing and Marking; Navy Policy for Ammunition Ashore
7、 (This publication is not furnished to bidders and contractors by the procuring activity, Contractors should contact the Government inspector for use of the publication,) Preparation of Quality Assurance Provisions 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
8、e from IHS-,-,-(Copies of specifications, standards, drawings, and publications required by contractors in cannsctig.n with specific procurement functions should be obtainex3 fmn the procuring activity or as directed by the Contracting BB%icer.) . 2,2 Other publications. The following document forms
9、 a part of this specification, Unless otherwise indicated, the issue in effect on ate of invitation for bids shall apply, CODE OF FEDERAL REGULATIONS 49 CFR 71-78 Transportat-ion, Interstate Commerce Commission, Explosives and Other Dangerous Articles (Application for copies should be addressed to t
10、he Superintendent of Documents, Government Printing Office, Washington, Do Co 20402, Orders on the above publication should cite the latest edition and supplements thereto,) 3, REQUIREMENTS 3,l General. 3,101 The MARK 35 MOD O delay cartridge covered by this document shall be manufactured in accorda
11、nce with LD 419707 and all documents listed thereon, 3,2 Material, All materials used in the manufacture of the delay Cartridges shall conform strictly with the specification referred to on the respective Bureau of Naval Weapons drawings unless specific approval in writing covering a departure there
12、from has been obtained from the Navy design activity prior to manufacture, materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal, When alternate 3,2,1 Preproduction sample, Unless otherwise specified by the . procuring activ
13、ity, a preproduction sample of 76 MARK 35 MOD O delay cartridges shall be manufactured using the same methods and procedures proposed for the production lot, tested as specified in 4,3,2 and is for the purpose of determining that the contractorb prior to starting production, is capable of manufactur
14、ing items which comply with the technical requirements of the contract, The sample will be 3 . . _ -_ .- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3,s Primary components, For the purpose of this specification the percussion primer, the main pro
15、pellant charge, the gasless ignition powder and the manganese delay composition are defined as primary components, See 4,3,3, 3,4 Primer, delay cartridge shall be manufactured in accordance with Army Ordnance Drawing 8799925, loaded with Remington Arms primer mixture styphnate composition No, 50860
16、and accepted in accordance with the requirements of MIL-P-20444, The primers shall be from lots manufactured within a year past, See 407010 The M42 percussion primer used in the MARK 35 MOD O 3,4,1 Primer X-ray, All primers shall be X-rayed and screened for defects as prescribed in 4,7,2, 3,5 Mangan
17、ese delay composition, The manganese delay composition shall be accepted in accordance with requirements of MIL-M-21383 and loaded into.the cartridge as specified on Bureau of Naval Weapons Drawing 2230818 of LD 419707, 3,6 Gasless ignition powder, The A-IA gasless ignition powder shall be accepted
18、in accordance with the provisions of MIL-P-22264 and loaded into the cartridge as specified on Bureau of Naval Weapons Drawing 2230818 of LD 419707, 3,7 Propellant charge, 3,7,1 Quantitp Al propellant: and booster charges shall be as specified on Bureau of Naval Weapons Drawing 2164483 of LD 419707,
19、 Charges shall be determined by weight rather than by volume measurements, 3,7,2 Smokeless powdero handling and loading, Do not: subject the smokeless powder to unnecessary handling or exposure to the atmosphere, to the atmosphere shall be performed only under conditions that do not permit the relat
20、ive humidity to exceed 75 percent, The handling and loading of smokeless powder exposed 3,7,3 Smokeless powder condition, The smokeless powder utilized shall exhibit no evidence of decomposition, See 4,7,3, 3,7,4 Change of propellant lot, Whenever a change occurs in the propellant lot for the main c
21、harge, a new charge determination shall be made by performing the test prescribed in 4,90 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3,8 Cartridge inspection, 3,8.1 Visual inspection, The complete cartridge shall be free of visible defects not
22、ed in 4,7,4. 3-8+2 Leakage, There shall be no leakage of air in the completed cartridge, See 4,7,5, 3,8,3 X-ray, All cartridges manufactured under contract shall pass X-ray examination of 4,7,6, 3,9 Ballistic requirements, Cartridges from each production lot, selected in accordance with 4,7,7,1, sha
23、ll meet the requirements listed below when subjected to the test prescribed in 4,7070 3,9,1 Delay time, The Upper (U) and Lower (L) limits of delay time shall be U = 0.750 second and L = 0,500 second, See 4,7,7,2,1, 3,902 Maximum pressure, The Lower (L) limit of maximum pressure shall be 750 psi for
24、 a minimum of 0,020 second at Points A and B of Figure 1. See 4,7,7,2,2, 3.9,3 Misfire, There shall be no misfires, See 40707030 3,lO Workmanship, Cartridges shall be constructed and finished in a manner to assure compliance with all requirements of this specification, finishes and coatings, Particu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC22845A1968CARTRIDGEDELAYMARK35MOD00 35 延时 炮弹 PDF

链接地址:http://www.mydoc123.com/p-977561.html