NAVY MIL-C-18653 B-1961 CARTRIDGE ONE INCH MARK 1 AND MARK 2 ALL MODS (BOMB EJECTOR)《1号2号各种类型1英寸炮弹(带炸弹推顶器)》.pdf
《NAVY MIL-C-18653 B-1961 CARTRIDGE ONE INCH MARK 1 AND MARK 2 ALL MODS (BOMB EJECTOR)《1号2号各种类型1英寸炮弹(带炸弹推顶器)》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-18653 B-1961 CARTRIDGE ONE INCH MARK 1 AND MARK 2 ALL MODS (BOMB EJECTOR)《1号2号各种类型1英寸炮弹(带炸弹推顶器)》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 . 1 March 196$ SPERSEDIW- . MILc-1 of the first 100 cartridges manufactured. (See 4.6.2). 3.11 Ballistics and functioning. The cart- ridges when fired using the test assembly described in 4.6.3.1 shall have a hook open- ing time no greater than 100 milliseconds and the average horizontal velocity i
2、mparted to the bomb shall not be less than 6.4 feet per second. (See 4.6.3.1, 4.6.3.2, and 4.6.3.3.) 4. QUALITY ASSURANCE PROVISIQNS AND TEST REQUIREMENTS 4.1 Suppliers responsibility, The supplier is responsible for the performance of all in- spection requirements as specified herein. Except as oth
3、erwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. Inspection records of the ex- c amination and tests shall be kept complete and available to the Government as specified in the contract or order. The Government reserves t
4、he right to perfoi-m any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplier and services conform to prescribed requirements. 4.2 Sampling. Unless otheiwise specified (see 3.5) and when applicable, the sampling plans and procedures used by
5、 the Govern- ment inspector in the determination of the acceptability of products submitted by a suppliei- for Government inspection will be in accordance with the provisions of Stand- ard MIGSTD-105. 4.2.1 Lot. As applied to the Government inspection of units of product, the term “lot” shall mean “
6、inspection lot”, Le., a col- lection of units of the product used as a basis for Government inspection. “A lot shall consist only of cartridges of one mark and mod manufactured under essentially the same conditions and submitted for inspec- tion at the same time.” Unless otherwise specified, the num
7、ber of units of product in “inspection lots” shall be as determined by the Government inspectoi; and may differ from the quantity designated in the con- tract or order as a lot for production, ship- ment, or other purpose. 4.2.2 Production lot. FOS procurement purposes the pi*oduction lot shall cons
8、ist o not less than 1301 or more than 20,000 com- pletely loaded cartridges of one Mark and Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-RIUGG18653B Mod plus those required for all test pur- poses, Unless otherwise stated (see 6.2), all units for
9、test purposes shall be provided at the expense of the contractor. The produc- tion lot should not be confused with the lot for inspection purposes as defined in 4.2.1. 4.3 Preproduction sample. Before entering into quantity production, a preproduction sample of 150 completely loaded cartridges of th
10、e specified Mark and Mod shall be de- livered by the contractor for test to an agency designated by the procuring activity. The number of units subjected to each test shall be determined on the basis of a lot size of 1301 units. These cartridges shall be manufactured by the same procedures and proce
11、sses and at the same location proposed by the contractor for the execution of the contract. Prior to submission of the pre- production sample for acceptance, the cart- ridges shall have received the same degree of component and assembly inspection as that which will be employed on production lots. W
12、hen a preproduction sample is re- ceived which complies with all the quality assurance requirements of this specification, the contractor will be notified and will be authorized by the procuring activity to pro- ceed with the submission of the product for acceptance. Accepted samples will become the
13、 property of the procuring activity and will be included in the number called for in the contract schedule. 4.3.1 Preproduction sample for a subse- quent contract. The necessity for a prepro- duction sample will be determined by the procuring activity when production under a new contract by the same
14、 contractor at the same location follows the manufacture of satisfactory material as covered by this specification. (See 6.2.) 4.4 Government inspection. Government inspection and acceptance of supplies f urn- ished hereunder will be in accordance with the contract or order and this specification. 4
15、.4.1 Preproduction hspection. Unless otherwise specified in the contract or order (see 6.2), the Government will be responsible for the performance of the preproduction in- spection, The samples specified in 4.3 will be examined and tested to determine compli- ance with the requirements specified he
16、rein. Government approval of the results of the preproduction inspection will be based on compliance of the samples with the specified requirements. 4,5 Quality control system. Except as otherwise specified herein, the contractor shall establish and maintain a system for the control of the quality o
17、f material offered for Government acceptance. Quality control systems so established shall be in accordance with Section 3, Requirements, of Specifica- tion MIL-Q-9858. 4.6 Test procedures. 4.6.1 Bridge tuire resistance. Conformance with the bridge circuit resistance require- ment of 3.5 shall be as
18、certained by means of a test circuit which limits the bridge current to 50 millamperes, maximum. A safety chamber with an interlock switch shall be used to protect the operator during appli- cation of the current. A suitable bridge which is known to be accurate within 0.005 ohm in the range of resis
19、tance specified shall be utilized to determine whether or not the resistance requirement is being met. 4.6.2 Cartl-idge we;ght test. After com- pletion of the assembly and loading, cart- ridges shall be selected for weighing from each lot in accordance with MIL-STD-105, Inspection Level I, AQL of 1.
20、0 percent de- fective. A cartridge having weight, which varies more than plus or minus 3.0 standard deviations from the average weight of the first 100 cartridges manufactured shall be classed as defective, Disposition of the lot shall be in accordance with the sampling plan given above. 4.6.2.1 Com
21、putation of standard deviation. The standard deviation(s) of the weights of the first 100 cartridges manufactured shall be computed as follows: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-e- (ZX)“ S= n-I n (n-1) x= cartridge weight n= 100 2x.k su
22、mmation of the squares of individual Xx= summation of individual cartridge (sx) 5 square of summation of individual cartridge weights weights cartridge weights 4.6.3 Bailstics and ftmctionng tests. 4.6.3.1 Assemblp foF test. Fos test fking the Mk 1 and Mods cartridges, a 2000 pound general purpose s
23、hall be mounted in a stand- ard bomb ejector; for the Mk 2 and Mods cartridges, a 250 pound general purpose bomb shall be wed. Both bombs shall be inertly loaded to service weight. The posi- tion of the ejectoi- shall be such that when a bomb is mounted in the ejector nose down, axis vertical, its n
24、ose shall be held seven (7) feet six (6) inches from the ground. A type I-2 intervalometer with a 20 Volt de re- lease circuit of 2.0 4-02 ohms resistance shall be used in firing cartridges. Normally, the intervalometer shall be calibrated and fired at conrol position No. 21. Suitable in- strumentat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC18653B1961CARTRIDGEONEINCHMARK1ANDMARK2ALLMODSBOMBEJECTOR1 各种 类型 英寸 炮弹 炸弹 推顶器 PDF

链接地址:http://www.mydoc123.com/p-977432.html