《NAVY MIL-C-18419 B (2)-1965 COMPRESSORS RECIPROCATING MOTOR DRIVEN NAVAL SHIPBOARD HIGH PRESSURE AIR SERVICE《海军船高压空中服务发动机驱动摆动压缩机》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-18419 B (2)-1965 COMPRESSORS RECIPROCATING MOTOR DRIVEN NAVAL SHIPBOARD HIGH PRESSURE AIR SERVICE《海军船高压空中服务发动机驱动摆动压缩机》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-C-LiLSB (2) i3 M 99777Ob 04bL2b0 1i - L s, MIL-C-184 19B(SHIPS) AMENDMENT- 2 6 January 1965 SUPERSEDING 1:- - Amendment- 1 . . 14 April 1964 0 MILITARY SPECIFICATION COMPRESSORS, RECIPROCATING, MOTOR DRIVEN, NAVAL SHIPBOARD HIGH PRESSURE AIR SERVICE This amendment forms a part of Military Spec
2、i- fication MIL-C-l8419B(SHIPS), 29 June 1962. + Pages 1 and 2, paragraph 2.1: Make the following changes: Under “Specifications, Federal“ add: IFF-B- 185 - Bearings, Roller, Cylindrical: and Bearings, Roller, Self-aligning. I Under “Standards, Military“ add: “MIL-STD-276 - Impregnation of Porous No
3、nferrous Metal Castings. “MIL-STD-438 - Schedule of Piping, Valves, Fittings and Associated Piping Components for “MIL-STD-777 - Schedule of Piping, Valves, Fittings and Associated Piping Components for Submarine Service. Surface Ships.“ Under “Drawings, Bureau of Ships“ delete “5000-S4800-3000“ and
4、 add: 810-1385941 - Fittings. Sil Brzg: WOG, 3000 psi for UiT Inspection. “810-1385942 - Fittings, Bronze Sil Brzg., WOG, for U/T Inspection. “810-1385943 - Unions, Sil Brzg., 3000 psi, WOG, IPS for U/T Inspection. “810- 1385944 - Fittings, Sil Brzg., OD, 3000 psi, WOG for U/T Inspection. “810-13859
5、45 - Bushings, Reducing, CU-NI Sil Brzg., WOG for U/T Inspection. “810-1385946 - Unions, Bronze Sil Brzg., WOG for U/T Inspection. “810- 1385948 - Unions. Sil Brzg., OD 3000 psi, WOG for UT Inspection. “810- 1385950 - Bosses, Non-Ferrous, Piping for U/T Inspection. “810-1385951 - Bushings, Reducing,
6、 CU-NI Sil Brzg., IPS, 3000 psi, WOG for U/T Inspection. “810-1385952 - Bushings, Reducing, CU-NI Sil Brzg., OD 3000 psi, WOG for U/T Inspection.“ Under “Publications, Bureau of Ships“ delete: “NAVSHIPS 250-637-2“ and “NAVSHIPS 250-648-8“ and add “NAVSHIPS 250-634-6 - Fabrication and Inspection of B
7、razed Piping Systems.“ Page 2, paragraph 2.2: Under “Compressed Air and GasInstitute“ in third 1ine.change “2nd edition“ to “3rd edition“. LCHANGES FROM PREVIOUS ISSUE. THE OUTSIDE MARGINS OF THIS DOCUMENT HAVE BEEN MARKED “% TO INDICATE WHERE CHANGES (DELETIONS, ADDITIONS, ETC,) FROM THE PREVI- OUS
8、 ISSUE HAVE BEEN MADE. THIS HAS BEEN DONE AS A CONVENIENCE ONLY AND THE GOV- ERNMENT ASSUMES NO LIABILITY WHATSOEVER FOR ANY INACCURACIES IN THESE NOTATIONS. BIDDERS AND CONTRACTORS ARE CAUTIONED TO EVALUATE THE REQUIREMENTS OF THIS DOCUMENT BASED ON THE ENTIRE CONTENT AS WRITTEN IRRESPECTIVE OF THE
9、 MARGINAL SOTATIONS AND RELATIONSHIP TO THE LAST PREVIOUS ISSUE. I FSC 43101 /- - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-II NIL-C-L419B (2) L13 W 9999906 OL1bL2bL 3 A I MIL-C- 18419B(SHIPS) AMENDMENT- 2 # Page 3, paragraphs 3.3 through 3.3.1
10、.3: Delete and substitute: . “3.3 General design. - - “3.3.1 Tlie principle of maximum reliability is paramount and no compromise of this principle shall be made with .my ocher basic requirements of design. Where wear or corrosion is unavoidable, the parts sub- jected EO such wear or corrosion shall
11、 be of the best material for the purpose in order to reduce those detri- mental effects to 2 minimum. It is the intention of this specification to obtain air compressors of such design that they will haye an operating life of at least 50,000 hours with no limitation on the number of starts and stops
12、, and without major overhauls of less than 10,000 hours intervals. Replacement of easily replaceable wearins parts such as cylinder suction and discharge air valves should not be required at intervals of less than 1000 hours. Replacement of piston rings should not be required at intervals of less th
13、an 1000 hours for the high pressure stages and of not less than 2000 hours for the first and second stages. “3.3.1.1 The designer should take cognizance of the conditions under which equipment will be maintained and repaired on shipboard, and of the fact that the personnel responsible for maintenanc
14、e and repair may not be seasoned mechanics. For example, parts should be so designed that it is impossible to replace them in a wrong position; and adjacent studs should be of the same length, or of large difference in lengths, so that a mistake will not easily occur; serrated surfaces should not be
15、 used for accurate positioning unless specifi- cally approved by the Bureau of Ships since areas should be avoided where strong wrenching would cause damage. sors shall. incorporate all the following requirements: “3.3.1.2 in addition to the paramount concept of reliability, the design and construct
16、ion of all compres- /- (a) Accessibility for repair. (b) Satisfactory operation when inclined as follows: (1) Up to 30 degrees in any direction (permanently inclined), (2) With the ship rolling up to 60 degrees from the vertical to either side, taking 8 seconds for (3) With the ship pitching 10 degr
17、ees up and down from the normal horizontal plane, taking 6 a complete cycle (with direction of crankshaft in fore and aft position). seconds for a complete cycle. (c) Quiet operation. (d) Minimum space and weight. “3.3,1.3 To be in consonance with 3.3.1.2(d) the dry weight of compressors with 440 vo
18、lt (v.) alternating current (a.c.) motors, less motor controllers, but including all other appurtenances, shall not exceed 4000 pounds. The corresponding weight with 230 v. direct current (d.c.) motors shall not exceed 5000 pounds. “3.3.1.4 Reliability analysis.- In order to achieve the desired reli
19、ability the contractor shall submit an analysis of those factors effecting reliability, as highlighted in 3.3.1. The analysis shall be such that the composite reliability of the compressor, including essential appurtenances, can be predicted in terms of mean-time-between-failures (MTBF). MTBF is the
20、 time which equipment (parts, material) can be expected to operate satisfactorily before failure occurs. “3.3.1.4.1 The reliability analysis shall include, but shall not be limited to the following: (a) List of those parts which experience and judgement show are subject to wear and service fail- (b)
21、 Specific design features employed to attain the required service life of the parts. Some sug- (c) CompIete calculations of temperatures throughout the air path. (d) Choice an& analysis of all bearings. (e) Inter and after cooler design data, (f) How failure of one part affects other parts. ures. ge
22、ated design features are: choice of materials, compatability of materials, hardness, surface finishes, fits, clearances, and so forth, Include calculations when applicable. “3.3.1.4.2 The reliability knalysis shall include preventive maintenance and servicing requirements nec- essary to the achievem
23、ent of the predicted MTBF. Any unusual steps or precautions necessary in carrying out maintenance and servicing requirements shall be pointed out. Page 2 of 5 pages Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a . MIL-C-LqLSB (2) LI3 m 9999906 046
24、1262 5 W MIL-C- 18419B(SHIPS) AMELNDMENT-2 “3.3.1.5 The reliability analysis shall be submitted at the same time, or prior to, the submittal of class A and class D drawings for approval (see 3.7.7.2). Approval of the reliability analysis is a requisite for ap- proval of new class 4 and class D drawi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC18419B21965COMPRESSORSRECIPROCATINGMOTORDRIVENNAVALSHIPBOARDHIGHPRESSUREAIRSERVICE 海军 高压 空中 服务

链接地址:http://www.mydoc123.com/p-977415.html