NAVY MIL-B-81743 A-1973 BUOY DAN BNU-1 W《DAN BNU-1 W浮标》.pdf
《NAVY MIL-B-81743 A-1973 BUOY DAN BNU-1 W《DAN BNU-1 W浮标》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-B-81743 A-1973 BUOY DAN BNU-1 W《DAN BNU-1 W浮标》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、I MIL-B-L743A 20 m 777770b 020503b T m m-B-81743A( AS ) 14 June 1973 SUPERSEDING MIL-B-81743( AS) 1 October 1969 MILITARY SPECIFICATION BOY, DAN BW-l/W This specification has been approved by the Naval Air Systems Command, Department of the Navy. 1. SCOPE 1.1 Scope - This specification covers the de
2、sign requirements for one ty-pe of marker buoy for use as an aid to navigation. 2. APPLICABU DOWW *2.l The following documents of the issue in effect on the date of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS Federal “-
3、1-595 PPP-B-601 PPP-B-636 Mil i tary MIL-P- MIL-1-17214 Military . MIL-STD-105 Insulation Tape, Electrical Pressure Sensitive Adhesive, Plastic, General Purpose Boxes, Wood, Cleated-Plywopd Boxes, Shipping,. Fiberboard Preservation, Methods of Indicator Permeability, Low-MIJ (GO-NO GOI Sampling Proc
4、edures and Tables for Inspection by Attributes MIL-STD-129 Marking for Shipment and Storage e Licensed by Information Handling ServicesMIL-B-L743A 20 7777706 0205037 I W ._ . c MIL-B-81743A( AS) Department of the Navy WR-43 DRAWINGS Quality Assurance Provisions, Prepa- ration of Naval Air Yjstems Co
5、man1 *30003-DL167ASlOO Buoy, DAN BNU-l/W Assembly (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring agency or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Prep
6、roduction - The marker buoy furnished under this specification shall be a product, samples of which have been tested and passed the prepro- duction tests specified herein. *3.2 Parts and materials - Parts and materials shall be as specified in all Any deviation by drawings and subsidiary documents l
7、isted in 30003-DL167100. the contractor from the use of these specified parts and materials necessarily places both the burden of proof for the acceptability of the change, and the cost associated therewith, upon the contractor. Approval for deviations must be requested from the procuring agency by
8、the contractor and granted by the pro- curing agency prior to submission of equipments for preproduction tests. of parts and material deviations shall not be construed by the contractor to con- stitute a waiver of any other requirement of this specification, or of 30003- 16710). When a requirement o
9、f a referenced document conflicts with a require- ment of this specification, the requirement of this specification shall govern. The contract shall have precedence over this specification. Approval 3.2.1 Magnetic permeability - The magnetic permeability of all corrosion- resistant steel components
10、shall be less than 1.6 when checked with a low-mu magnetic permeability indicator conforming to MIL-1-17214. Steel Institute (AISI) type 304 stainless steel may be replaced by any AISI 300 series stainless steel if its magnetic permeability complies with this require- ment. American Iron and *3.3 De
11、sign and Construction - The equipment shall be manufactured in accordance with the drawings of 30003-DL167AS100 and subsidiary specifications except insofar as errors of omission or commission on the drawings may be incompatible with the requirements of this and related specifications. variations in
12、 the design that provide for improved production techniques, reduced product cost, or improvements in the overall operation may.be allowed. In any Minor 2 Licensed by Information Handling ServicesMIL-B-81743A( AS) case it is a condition of final acceptance that the equipments meet all the perf orman
13、ce requirements of the drawings of 30003-DL167AS100 and such accep- tance test documents as may be applicable. Proposed changes, either to correct drawing discrepancies or for any other reason shall be specifically approved by the procuring agency prior to their incorporation. . *3.4 Operational req
14、uirements - The assembled buoy shall meet the following operational requirements. For the requirements of 3.4.1 through 3.4.6, the direction of the force is along the longitudinal axis of the buoy with the buoy in a horizontal position. Except for buoyance, all values stated herein are as measured i
15、n air with buoy and mooring line in dry condition. apply with air locks items 167AS28-1 and 167128-2 removed. These requirements *3,4.1 Buoy removal force - Maximum force required to remove the buoy, item 167M102, from the protective support, item 167AC130, shall not exceed 3.5 pounds. *3.4.2 Upper
16、tube extension force - Force required to extend and lock upper tube, item i67ASii8, shall not exceed 1.0 pound. *3.4.3 Lower tube extension force - Force required to extend lower tube, item i67ASii6, shall not exceed 1.0 pound. *3.4.4 Lever rotation force - Force on the mooring line required to rota
17、te the lever, item 167106, from its assembled stowed position to the position determined by the free length of the spring, item 167ASi46, shall not exceed 1.5 pounds. 3.4.5 Ratchet wind-up force - Maximum force on the mooring line required to actuate the compensator mechanism (ratchet wind-up) one n
18、otch shall be 2.0 pounds. “3.4.6 Reel free-wheeling force - Force on the mooring line required for com- pensator mechanism reel to free-wheel shall be a minimum of 4.0 pounds and a max- imum of 5 pounds. *3.4.7 Compensator mechanism weight - Weight of the compensator mechanism, drawing 1.67101, used
19、 to moor the buoy, shall be a minimum of 1.3 pounds and a maximum of 1.7 pounds. - The anchor weight, item 167M129, shall be between *3.4.9 the anchor weight and.protective support) in tap water shall be between 7.0 and 8.0 pounds. Buoyancy - The net positive buoyancy of the marker buoy (excluding *
20、3.5 Workmanship - The marker buoy shall be constructed and finished in a All parts and materials shall be free from foreign thoroughly workmanlike manner. matter and manufacturing defects which would affect or impair the operation and serviceability of the marker buoy. to insure removal of all sharp
21、 edges. All exposed edges shall be rounded or beveled Fastening devices shall be secure. 3 Licensed by Information Handling ServicesflIL-B-L7LI3A 20 7777706 0205037 5- 4. QUALITY ASSURANCE PFiOVSIONS Jc4.1 Responsibility for inspection - Unless otherwise specified in the con- tract or purchase order
22、, the supplier is responsible for the performance of all tests/inspections as specified herein. supplier may utilize his own facility or any commercial laboratory acceptable to the Government. The Government reserves the right to witness or separately per- form any of the tests/inspections set forth
23、 in this specification where such tests/inspections are deemed necessary to assure that supplies and services con- form to prescribed requirements. Except as otherwise specified, the *4.2 Classification of inspection - The examination and testing of the marker buoy shall be classified as follows: (a
24、) Preproduction inspection (see 4.6). (b) (c) (a) Special tests (see 4.10). Initial production inspection (see 4.8). Quality conformance inspection (see 4.9). *4.3 Test conditions - The ambient temperature and relative humidity that prevails during the measurement of the forces, weights and buoyancy
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB81743A1973BUOYDANBNU1WDANBNU1W 浮标 PDF

链接地址:http://www.mydoc123.com/p-977272.html