NAVY MIL-A-81918-1976 ADAPTER LAUNCHER AIRCRAFT ADU-299 A《ADU-299 A飞机发射器适配器》.pdf
《NAVY MIL-A-81918-1976 ADAPTER LAUNCHER AIRCRAFT ADU-299 A《ADU-299 A飞机发射器适配器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-A-81918-1976 ADAPTER LAUNCHER AIRCRAFT ADU-299 A《ADU-299 A飞机发射器适配器》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、U MIL-A-81918 (AS) -, U Jan- 1976 MILITARY SPECIFICATION ADAPTER, LAUNCHER, AIRCRAFT, ADU-299A/A This specification has been approved by the Naval Air Systems Command, Department of the Navy. 1. SCOPE 1.1 This specification establishes the requirements for one type of launcher adapter that can be su
2、spended from various ejector bomb racks and permits a guided missile launcher to be mounted to its bottom surf ace. 2. APPLICABLE DOCUMENTS 2.1 The following documents of,the issue in effect on date of invitation for bids or request for proposals, form a part of the speci- fication to the extent spe
3、cified herein: ) e SPECIFICATIONS Military MIL-E-5400 Electronic Equipment, Airborne, General Speci- fication For MIL-T-7743 Testing, Store Suspension Equipment, General Specification For I: . STANDARDS . Military MIL-STD-100 Engineering Drawing Practices MILSTD-129 Marking for Shipment and Storage
4、MIL-STD-130 Identification Marking of U.S. Military . Property Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-81918 (AS.) I STANDARDS (Continued) Military MIL-STD-143 MIL-STD-794 MIL-STD-831 MIL-STD-889 MS3314 DRAWINGS DL 5 6 4AS 100 54A46c358
5、 Standards and Specifications Order of Pre- cedence for the selection of Parts and Equipment, Procedures for Packaging and Packing of Test Reports, Prepatation of f I MIL-A-BLSLB LO W 7997906 0433273 3 W (Copies of specifications, standards, drawings, and publications re- quired by suppliers in conn
6、ection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer . ) 3. REQUIREMENTS 3.1 First article - The adapter furnished under this speci- ification shall be a product which has been inspected and passed the first article inspe
7、ction specified herein (see 4.3). 3.2 Selection of specifications and standards - Specifications and standards for necessary commodities and.services not specified herein shall be selected in accordance with MIL-STD-143. 3.3 Materials - Materials shal conform to applicable specifi- cations or standa
8、rds and shall be as specified herein and on applicable draw- % ings. 3.4 Dissimilar metals - Unless suitably protected against electrolytic corrosion, dissimilar metahg shall not be used in intimate contact with each other. Dissimilar metals are defined in.MIL-STD-889. Dissimilar Metals 1 Lug, suspe
9、nsion, (1000 LB Class), Airborne Equipment Naval Air Systems Command Adapter Assembly ADU-SggA/A Aircraft Launcher Lug, Suspension, Airborne Equipment Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-8191 10 = 9997906 0431274 5 I i - MIL-Ag81918
10、 (U) - 3.5 Desim and construction - The desim and construc- tion of the adapter shall be as specified herein and in accordance with drawings listed in DL564AS100. 3.6 Performance - The adapter shall be capable of.being suspended from any of the AERO 7 series, MAU 9 series, BRU-10 and 11 series, Aero
11、 20A series and ERU-119 ejector type bomb racks using either the 14 inch or 30 inch suspension lugs. racks the adapter shall accept either the LAU-7/A series or AERO 3A series guided missile launcher for mounting to its bottom surface. Interconnec- tion of adapter electrical cables and launcher elec
12、trical cables shail be. made manually. “he adapter shall satisfy all performance requirements when subjected to the following tests: Mounted on any of these ejector bomb (a) Examination . (4-6.1) (b) Electrical Continuity (4.6.2) (c) Operational Tests (4.6.3) (d) Shock Tests (4.6.4) (e) Electrical C
13、haracteristics (4.6.5) (f) Static Tests (4.6.6) (g) Vibration Test (4.6.7) (h) Salt Spray Test (4.6.8) 3,7 Interchangeability - All parts having the same part number shall be directly and completely interchangeable with each other with respect to installation and performance. shall be governed by th
14、e drawing number requirements of MIL-STD-100. Changes in part number 3.8 Identification of parts - All parts used in the adapter shall be marked with the manufacturers code number in accordance with MIL-STD-130. 3.9 Workmanship - The workmanship displayed in fabrica- tion and assembly of the adapter
15、 shall be such as to assure, within design limitations, ability of the adapter to meet performance requirements under all applicable environmental conditions specifiedherein. repair, welding, heavy burrs, or parts assembled by introduction of high stresses not prescribed in design, are typical signs
16、 of hferior workmanship and shall be cause for rejection. The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the Governments notice of approval, shall be determinative of the re- quirements of the contract relative to workmanship. requ
17、irements of MIL-E-5400, Unauthorized All electrical compo- . nents and wiring shall be installed in accordancewith the workmanship I -d$ 3 - - . .-. . -. _._-. - - -_., _ . . . *.a ,- . , -_ ,- _- -. ._ F - p.- I .-?-. inspections - A random sampling shall be selected by the procuring activity from
18、each production lot in accordance with Table III and shall be subjected to the inspections listed in Table II, Group 1 and Group 2. Group 1 inspections shall be conducted prior to Group 2 inspections. Failure of any sample to pass any one of these inspec- tions shall be cause for rejection of the en
19、tire lot. TABLE II QUALITY CONFORMANCE INSPECTION AND SEQUENCE - i/ TESTS Group 1 - Individual Tests Examination, adapter Electrical continuity Group 2 - Lot Sample Tests Operational tests Shock tests g/ Electrical characteristics Static tests 2/ Vibration tests - 2/ Sait sprax - 2/ PARA NO. 4.6.1 4
20、.6.2 4.6.3 4.6.4 4.6.5 4.6.6 4.6.7 4.6.8 A 1 2 SAMPLE - B - 1 2 - 3 4 X X X 5 - C 1 2 - 3 4 5 6 X X - - D 1 2. - 3 4 X X X X - -. - i/ Test sequence is indicated by the numbers in the sample coXumn. indicates test not required. -Prii x - 2/ Repeat the electrical continuity test after this test (see
21、4.6.2). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-BL7LB LO W 777770b 0433277 O W ITEM Adapter MIL-A-81918 (AS) PRODUCTION NO. OF SAMPLES LOT SIZE TO BE TESTED 100 or less 2 101 to 200 3 201 to JO0 4 i TABLE III SAMPLING INSPECTION I I I 4
22、.5 Inspection conditions - Unless otherwise speci- fied, all inspections shall be performed under the following conditionst a. Room temperature - room ambient of 25 510C (77 fl8P). b. Any ejector bomb rack specified in paragraph 3.6 and either the UU-i/A series or AERO-3A series launcher shall be us
23、ed for mounting and loading the ADU-299A/A adapter for any of the required tests, lugs shall be used to attach the adapter to the bomb rack. During all applicable tests the bomb rack sway braces shall be adjusted such that they impose not more than 500 pounds per brace direct loading on the adapter.
24、 The 14 inch suspension C. Unless otherwise specified a sidewinder 1C . (AIM-9D) Simulated missile shall be used as the test store. A simulated configuration having the same center of gravity location snd sidewinder 1C type mounting lugs cau be used as an alternate test stare, 6 Provided by IHSNot f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILA819181976ADAPTERLAUNCHERAIRCRAFTADU299AADU299A 飞机 发射器 适配器 PDF

链接地址:http://www.mydoc123.com/p-977098.html