1、*USACE / NAVFAC / AFCESA / NASA UFGS-22 14 29.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-22 14 29 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION TABLE OF CONTENTSDIVISION 22 - PLUMBINGSECTION 22 14 29.00 40SUMP
2、 PUMPS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTS1.4 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTSPART 2 PRODUCTS2.1 WET-PIT SUMP PUMPS2.1.1 Pump Selection2.1.2 Pump Casing2.1.3 Impeller2.1.4 Strainer2.1.5 Pump Shaft2.1.6 Bearings and Lubrication2.1.7 Flexible
3、 Couplings2.1.8 Support Pipe2.1.9 Discharge Pipe2.1.10 Liquid-Level Control2.1.11 High-Water Alarm2.1.12 Sump Tank and Coverplate2.1.12.1 Tank2.1.12.2 Coverplate2.1.13 Painting2.2 SUBMERSIBLE PUMPS2.2.1 Pump Selection2.2.2 Pump Housing2.2.3 Impeller2.2.4 Pump Shaft2.2.5 Mechanical Seal2.2.6 Bearings
4、 and Lubrication2.2.7 Motor and Power Cord2.2.8 Liquid-Level Control2.2.9 High-Water Alarm2.2.10 Sump Tank and CoverplateSECTION 22 14 29.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.10.1 Tank2.2.10.2 Coverplate2.2.11 PaintingPART
5、3 EXECUTION3.1 INSTALLATION3.1.1 Alignment3.2 TESTS3.2.1 Vibration Analyzer3.2.2 Pump Acceptance- End of Section Table of Contents -SECTION 22 14 29.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-22 1
6、4 29.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-22 14 29 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION 22 14 29.00 40SUMP PUMPS02/11*NOTE: This guide specification covers the requirements for automatic, electr
7、ic-motor-driven, centrifugal, wet-pit and submersible sump pumps.Motors are covered in Section 26 60 13.00 40 LOW-VOLTAGE MOTORS.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriat
8、e information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NO
9、TE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when y
10、ou add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically SECTION 22 14 29.00 40 Page 3Provided by IHSNot fo
11、r ResaleNo reproduction or networking permitted without license from IHS-,-,-be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The p
12、ublications are referred to within the text by the basic designation only.AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)ABMA 11 (1990) Load Ratings and Fatigue Life for Roller BearingsABMA 9 (1990; R 2008) Load Ratings and Fatigue Life for Ball BearingsASTM INTERNATIONAL (ASTM)ASTM A 53/A 53M (20
13、10) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and SeamlessHYDRAULIC INSTITUTE (HI)HI M100 (2009) HI Pump Standards SetINTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 1940-1 (2003; Cor 2005) Mechanical Vibration - Balance Quality Requirements for Rotors
14、 in a Constant (Rigid) State - Part 1: Specification and Verification of BalanceISO 2858 (1975) End Suction Centrifugal Pump (Rating 16 Bar) Designation Nominal Duty Point and Dimensions - International RestrictionsISO 5199 (2002) Technical Specifications for Centrifugal Pumps, Class IINATIONAL AERO
15、NAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA MG 1 (2009) Motors and Generators1.2 SUBMITTALS*
16、NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit SECTION 22 14 29.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the following list to reflect only the submittals required for the proj
17、ect. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be r
18、eviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “
19、G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “
20、PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ design
21、ation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SU
22、BMITTAL PROCEDURES:SD-02 Shop DrawingsSubmit the following in accordance with paragraph entitled, “General Requirements,“ of this section.Connection DiagramsControl DiagramsFabrication DrawingsInstallation DrawingsSD-03 Product DataSubmit Manufacturers Catalog Data in accordance with paragraph entit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS22142900402011SUMPPUMPSPDF