《NACE SP0775-1999 Preparation Installation Analysis and Interpretation of Corrosion Coupons in Oilfield Operations (Item No 21017).pdf》由会员分享,可在线阅读,更多相关《NACE SP0775-1999 Preparation Installation Analysis and Interpretation of Corrosion Coupons in Oilfield Operations (Item No 21017).pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、 Standard Practice Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations This NACE International standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions. Its acceptance does not in any respec
2、t preclude anyone, whether he or she has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not in conformance with this standard. Nothing contained in this NACE International standard is to be construed as granting any right, by impli
3、cation or otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as indemnifying or protecting anyone against liability for infringement of Letters Patent. This standard represents minimum requirements and should in no way be interp
4、reted as a restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances. NACE International assumes no responsibility for the int
5、erpretation or use of this standard by other parties and accepts responsibility for only those official NACE International interpretations issued by NACE International in accordance with its governing procedures and policies which preclude the issuance of interpretations by individual volunteers. Us
6、ers of this NACE International standard are responsible for reviewing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use. This NACE International standard may not necessarily address all potential
7、health and safety problems or environmental hazards associated with the use of materials, equipment, and/or operations detailed or referred to within this standard. Users of this NACE International standard are also responsible for establishing appropriate health, safety, and environmental protectio
8、n practices, in consultation with appropriate regulatory authorities if necessary, to achieve compliance with any existing applicable regulatory requirements prior to the use of this standard. CAUTIONARY NOTICE: NACE International standards are subject to periodic review, and may be revised or withd
9、rawn at any time in accordance with NACE technical committee procedures. NACE International requires that action be taken to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication and subsequently from the date of each reaffirmation or revision. The
10、 user is cautioned to obtain the latest edition. Purchasers of NACE International standards may receive current information on all standards and other NACE International publications by contacting the NACE International FirstService Department, 1440 South Creek Dr., Houston, Texas 77084-4906 (teleph
11、one +1 281-228-6200). Reaffirmed 2012-09-05 Reaffirmed 2005-04-07 Revised 1999-06-25 Revised 1991 Revised 1987 Approved 1975 NACE International 1440 South Creek Dr. Houston, Texas 77084-4906 +1-281-228-6200 ISBN 1-57590-086-6 2013, NACE International SP0775-2013 (formerly RP0775) Item No. 21017 SP07
12、75-2013 NACE International i _ Foreword This standard practice was prepared to encourage the use of uniform and industry-proven methods to monitor mass-loss and pitting corrosion in oilfield operations. This standard outlines procedures for preparing, installing, and analyzing metallic corrosion cou
13、pons. Factors considered in the interpretation of results obtained from these corrosion coupons are also included for the use of oil and service industry personnel. This standard was originally prepared in 1975 by NACE Task Group T-1C-6, a component of Unit Committee T-1C, “Detection of Corrosion in
14、 Oil Field Equipment,” to provide procedures for the preparation, installation, and analysis of corrosion coupons. It was revised by Task Group T-1C-11 in 1986 and by T-1C-23 in 1991. T-1C was combined with Unit Committee T-1D, “Corrosion Monitoring and Control of Corrosion Environments in Petroleum
15、 Production Operations,” and this standard was revised by Task Group T-1D-54 in 1999. It was reaffirmed in 2005 and in 2012 by Specific Technology Group (STG) 31, “Oil and Gas ProductionCorrosion and Scale Inhibition.” This standard is issued by NACE International under the auspices of STG 31. In NA
16、CE standards, the terms shall, must, should, and may are used in accordance with the definitions of these terms in the NACE Publications Style Manual. The terms shall and must are used to state a requirement, and are considered mandatory. The term should is used to state something good and is recomm
17、ended, but is not considered mandatory. The term may is used to state something considered optional. _ SP0775-2013 ii NACE International _ Standard Practice Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations Contents 1. General 1 2. Processing of Corr
18、osion Coupons .1 3. Installation of Corrosion Coupons 7 4. Recording Data on Corrosion Coupon Report . 16 5. Interpretation of Corrosion Coupon Data . 16 References 17 Appendix A: Typical Corrosion Coupon Report (Nonmandatory) 19 FIGURES Figure 1: Circular (washer-type) coupon and typical mounting i
19、n a ring joint flange. .8 Figure 2: Drill pipe corrosion ring coupon .9 Figure 3: Flat coupon holder using a 60 mm nominal OD (2 in NPT) threaded pipe plug .9 Figure 4: Round (rod-type) coupon holder using a 60 mm nominal OD (2 in NPT) threaded pipe plug and special insulating disk that can accommod
20、ate eight round (rod-type) coupons 11 Figure 5: Tool for installing and removing coupons in systems under pressure. . 12 Figure 6: Extractor tool for inserting and removing coupons in systems under pressure. . 12 Figure 7: Wire-line-operated tubing stop adapted as downhole coupon holder. . 14 Figure
21、 8: Choice of location for coupon installation and interpretation of coupon corrosion rate measurements . 15 TABLES Table 1: Density of Metals .5 Table 2: Qualitative Categorization of Carbon Steel Corrosion Rates for Oil Production Systems 17 _ SP0775-2013 NACE International 1 _ Section 1: General
22、1.1 This standard is presented for the use of corrosion coupons in oilfield drilling, production, and transportation operations. Oilfield operations include oil-, water-, and gas-handling systems, and drilling fluids. (When used in this standard, system denotes a functional unit such as a producing
23、well; flowline and tank battery; water, oil, or gas collection facility; water or gas injection facility; or a gas dehydration or sweetening unit.) Corrosion coupon testing consists of the exposure of a small specimen of metal (the coupon) to an environment of interest for a period of time to determ
24、ine the reaction of the metal to the environment. Corrosion coupons are used to evaluate corrosiveness of various systems, to monitor the effectiveness of corrosion-mitigation programs, and to evaluate the suitability of different metals for specific systems and environments. The coupons may be inst
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NACESP07751999PREPARATIONINSTALLATIONANALYSISANDINTERPRETATIONOFCORROSIONCOUPONSINOILFIELDOPERATIONSITEMNO21017PDF

链接地址:http://www.mydoc123.com/p-835864.html