NACE SP0297-2012 Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators (Item No 21081).pdf
《NACE SP0297-2012 Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators (Item No 21081).pdf》由会员分享,可在线阅读,更多相关《NACE SP0297-2012 Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators (Item No 21081).pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、 Standard Practice Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators This NACE International standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions. Its acceptance does not in any re
2、spect preclude anyone, whether he or she has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not in conformance with this standard. Nothing contained in this NACE standard is to be construed as granting any right, by implication or
3、otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by letters patent, or as indemnifying or protecting anyone against liability for infringement of letters patent. This standard represents minimum requirements and should in no way be interpreted as a
4、 restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances. NACE assumes no responsibility for the interpretation or use of th
5、is standard by other parties and accepts responsibility for only those official NACE interpretations issued by NACE in accordance with its governing procedures and policies which preclude the issuance of interpretations by individual volunteers. Users of this NACE standard are responsible for review
6、ing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use. This NACE standard may not necessarily address all potential health and safety problems or environmental hazards associated with the use of m
7、aterials, equipment, and/or operations detailed or referred to within this standard. Users of this NACE standard are also responsible for establishing appropriate health, safety, and environmental protection practices, in consultation with appropriate regulatory authorities if necessary, to achieve
8、compliance with any existing applicable regulatory requirements prior to the use of this standard. CAUTIONARY NOTICE: NACE standards are subject to periodic review, and may be revised or withdrawn at any time in accordance with NACE technical committee procedures. NACE requires that action be taken
9、to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication and subsequently from the date of each reaffirmation or revision. The user is cautioned to obtain the latest edition. Purchasers of NACE standards may receive current information on all stand
10、ards and other NACE publications by contacting the NACE FirstService Department, 1440 South Creek Dr., Houston, TX 77084-4906 (telephone +1 281-228-6200). Revised 2012-06-23 Reaffirmed 2004-03-31 Approved 1997-06-27 NACE International 1440 South Creek Dr. Houston, Texas 77084-4906 +1 281-228-6200 IS
11、BN 1-57590-042-4 2012, NACE International NACE SP0297-2012 (formerly RP0297) Item No. 21081 SP0297-2012 NACE International i _ Foreword Aspects of normal industrial maintenance painting such as surface preparation, coating selection, application methods, and safety considerations are subject to enti
12、rely different rules when placed within the confines of an energized, high-voltage substation. With utilities and industries attempting to obtain maximum use of their systems, transmission and distribution apparatus are being pushed to the limits of their designed service life. Properly engineered a
13、nd implemented maintenance painting programs protect equipment from the detrimental effects of corrosion and help it perform to the fullest extent of its operating life. Maintenance personnel for utilities and large industrial concerns who are responsible for maintenance painting of electrical equip
14、ment are primarily electrical engineers or have their background in electrical work. These individuals often have little, if any, practical knowledge of corrosion and its control. Consequently, many specifications that are poorly written, incomplete, and technically inaccurate are being used. This s
15、tandard has been prepared to assist maintenance personnel responsible for painting electrical equipment. A sample specification is included in Appendix A (Nonmandatory). This specification provides an example of one of the many types of specifications currently used by the industry. NACE neither end
16、orses nor recommends the use of this sample specification. It is provided for information only. This standard was originally prepared in 1997 by NACE Task Group (TG) T-6H-50, a component of former Unit Committee T-6H on Coating Materials for Atmospheric Service. It was reaffirmed in 2004 by Specific
17、 Technology Group (STG) 02 on Protective Coatings and LiningsAtmospheric. It was revised in 2012 by TG 457, “Review of NACE Standard RP0297-2004.” TG 457 is administered by STG 02, “Coatings and Linings, ProtectiveAtmospheric.” This standard is issued by NACE under the auspices of STG 02. In NACE st
18、andards, the terms shall, must, should, and may are used in accordance with the definitions of these terms in the NACE Publications Style Manual. The terms shall and must are used to state a requirement, and are considered mandatory. The term should is used to state something good and is recommended
19、, but is not considered mandatory. The term may is used to state something considered optional. _ SP0297-2012 ii NACE International _ NACE International Standard Practice Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators Contents 1. General . 1 2
20、. Purpose of Coating Electrical Substation Apparatus 1 3. Safety Considerations . 2 4. Surface Preparation for Radiators 2 5. Coating Selection 3 6. Application . 4 7. Inspection 4 8. Hazardous Waste Considerations 6 9. Contractor Qualification. 6 References 6 Appendix A: General Sample Transformer
21、Painting Specifications (Nonmandatory) 6 Appendix B: Alternating Current Minimum Safe Working Distances (A) (Mandatory) 10 _ SP0297-2012 NACE International 1 _ Section 1: General 1.1 This standard practice provides standards for preparing specifications and procedures for coating electrical substati
22、on apparatus. 1.2 This standard is designed to introduce owners, engineers, maintenance personnel, and contractors to the four aspects unique to substation coating: (a) Safety considerations (b) Surface preparation for radiators (c) Coating selection (d) Application (flow coating) 1.3 This standard:
23、 1.3.1 Informs the reader of the factors that make electrical substation coating unique among all other forms of industrial maintenance painting and highlights special factors such as worker safety and coating of radiators. 1.3.2 Provides owners, engineers, and maintenance personnel with a sample sp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NACESP02972012MAINTENANCEPAINTINGOFELECTRICALSUBSTATIONAPPARATUSINCLUDINGFLOWCOATINGOFTRANSFORMERRADIATORSITEMNO21081PDF

链接地址:http://www.mydoc123.com/p-835838.html