MSFC NASA MWI 6430 1 REV G-2008 LIFTING EQUIPMENT AND OPERATIONS《提升装置和操作》.pdf
《MSFC NASA MWI 6430 1 REV G-2008 LIFTING EQUIPMENT AND OPERATIONS《提升装置和操作》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MWI 6430 1 REV G-2008 LIFTING EQUIPMENT AND OPERATIONS《提升装置和操作》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 6430.1 REVISION G EFFECTIVE DATE: October 20, 2008 EXPIRATION DATE: October 20, 2013 MARSHALL WORK INSTRUCTION AS01 LIFTING EQUIPMENT AND OPERATIONS Provided by I
2、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Lifting Equipment and Operations MWI 6430.1 Revision: G Date: October 20, 2008 Page 2 of 23 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY TH
3、AT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/14/99 Document converted from MSFC-P15.1-C05 to a directive. Previous history retained in system as part of canceled or superseded ISO Document
4、 files. Revision A 8/20/99 Changes made to reflect new organizational codes. Paragraph 6.1.1, step 1: deleted Safety and Mission Assurance Office and Facilities Engineering Department from Responsible Organization column. Revision B 1/5/01 Changed Table 1 to eliminate annual crane operations survey
5、and require organizations to review upcoming operations yearly and notify FED of new requirements. Revised 6.4.1 to require the use of MSFC Forms 4328 and 4332 for daily crane inspections. Replaced unnumbered forms in Appendices B and C with MSFC Forms 4328 and 4332. Added documentation requirements
6、 to Section 9 for daily inspections. To resolve RCAR 135, paragraph 6.7 revised to resolve conflict with Table 3, Step 14, and require MSFC Form 4331 to be used for deviations/waivers. Revision C 6/25/01 Added sentence “The responsible contracting officer” to section 2, Applicability. This is to imp
7、lement recommendation from Close Call Investigation Report, Hoist at Building 4648. Added paragraph 6.9 to establish LDE Committee to satisfy 2001 Code Q audit finding. Added statement regarding disposition of records to paragraph 9.5. This is to satisfy NCR 438. Revision D 4/15/2004 Document re-wri
8、tten to reflect changes in headquarters documentation migrating from NSS/GO 1740.9b to NASA-STD 8719.9. Revision E 9/27/2004 Requirements distinguished by use of the word “shall.” Changed font to Times New Roman. Document also reflects minor editorial and organizational changes. Revision F 11/03/200
9、5 Revised to reflect organizational and minor editorial changes, as well as to align records with NPR 1441.1. In addition, a directive was added to paragraph 3 (APPLICABLE DOCUMENTS) and paragraph 4 (REFERENCES). Revision G 10/20/2008 Revised 2. Applicability statement to address the applicability o
10、f this directive to the Michoud Assembly Facility. Reflects minor changes to correct findings from the Institutional/Facilities/Operational Safety Audit in 2007. Subparagraphs 6.10.2 and 6.15 addresses identification of the NASA Michoud Assembly Facility Safety Office. Directive also reflects minor
11、editorial changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Lifting Equipment and Operations MWI 6430.1 Revision: G Date: October 20, 2008 Page 3 of 23 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/dir
12、ectives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 1. PURPOSE The purpose of this Marshall Work Instruction (MWI) is to identify the Marshall Space Flight Center (MSFC) organizations and their responsibilities for ensuring compliance with NASA-STD-8719.9. 2. APPLICABILITY 2.1
13、This MWI applies to the personnel, programs, projects, and activities at MSFC and MSFCs Michoud Assembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractor
14、s, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.) 2.2 This MWI applies to overhead and gantry cranes (including top running monorail, underhung, and jib cranes); mobile cranes; derricks; hoists; special hoist-supported, personnel-lifting device
15、s; Hydra-sets; load measuring devices; hooks; slings and rigging; mobile aerial platforms; forklifts; and jacks. It does not address elevators or front-end loaders. 3. APPLICABLE DOCUMENTS 3.1 NPR 1441.1, “NASA Records Retention Schedules (NRRS)” 3.2 NPR 8715.3, “NASA General Safety Program Requirem
16、ents” 3.3 MPR 1440.2, “MSFC Records Management Program” 3.4 MWI 3410.1, “Personnel Certification Program” 3.5 MWI 6410.1, “Packaging, Handling, and Moving Program Critical Hardware” 3.6 MWI 8715.15, “Operational Safety Assessment Program” 3.7 NASA-STD-8719.9, “Standard for Lifting Devices and Equipm
17、ent” 3.8 MSFC-RQMT- 3479, “Fracture Control Requirements for Composite and Bonded Vehicle and Payload Structures” 4. REFERENCES MPR 3410.1, “Training” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Lifting Equipment an
18、d Operations MWI 6430.1 Revision: G Date: October 20, 2008 Page 4 of 23 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 5. DEFINITIONS 5.1 Critical-Lift Operations. Lifting and lowering operations with special, hig
19、h-dollar items (i.e., spacecraft, one-of-a-kind articles, or major facility components) whose loss would have serious programmatic impact. Critical lifts also include operations with special personnel and equipment safety concerns beyond normal lifting hazards. 5.2 Failure Mode and Effects Analysis.
20、 A systematic, methodical analysis performed to identify and document all identifiable failure modes at a prescribed level and to specify the resultant effect of the modes of failure. 5.3 Hazard Analysis. A systematic analysis performed on cranes being qualified to handle loads classified as critica
21、l or program-critical hardware. The analysis is required for initial certification to handle critical loads and has to be updated, as needed, to reflect any changes in operations or crane configuration. The analysis determines potential sources of danger, identifies most probable failure modes, and
22、recommends resolutions for those conditions found in the hardware-facility-environment-human relationship which could cause loss of life, personal injury, or loss of crane, facility, or load. The analysis includes crane description, reference documentation, severity assessment, and assessment of spe
23、cified passive and structural components between the hook and the holding brakes. 5.4 Lifting Devices. For purposes of this instruction, this term is used to refer to overhead and gantry cranes (including top running monorail, underhung, and jib cranes); mobile cranes; derricks; hoists; special hois
24、t-supported, personnel-lifting devices; Hydra-sets; load measuring devices; hooks; slings and rigging; mobile aerial platforms; forklifts; and jacks. Please note that NASA-STD-8719.9 uses the terms “lifting device” and “lifting equipment” interchangeably. 5.5 Lifting Equipment. For purposes of this
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI64301REVG2008LIFTINGEQUIPMENTANDOPERATIONS 提升 装置 操作 PDF

链接地址:http://www.mydoc123.com/p-822907.html