1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 6410.1 REVISION F EFFECTIVE DATE: October 23, 2008 EXPIRATION DATE: October 23, 2013 MARSHALL WORK INSTRUCTION AS01 PACKAGING, HANDLING, AND MOVING PROGRAM CRITIC
2、AL HARDWARE Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date: October 23, 2008 Page 2 of 14 CHECK THE MASTER LIST at https:/repository
3、.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/14/99 Document converted from MSFC-P15.1-CO1 to a Directive. Previous history retained in sys
4、tem as part of canceled or superseded ISO Document files. Revision A 8/20/99 Document updated to reflect new MSFC reorganization. Revision B 1/24/01 Clarify requirements for PHTR and Critical Item Label. Updated numbering per MPG 1410.2; deleted “and Mission Sensitive Hardware (MSH)” from section 1,
5、 Purpose; changed “MPG 1441.1” to “MPG 1440.2” and changed “MPG 1700.1” to “MPG 8715.1” in section 3, Applicable Documents; added MPG 8730.3 and MWI 3410.1 to Applicable Documents; removed item g. from section 5, Definitions; added “Redlines to the As Run handling/moving plans must be concurred by a
6、 representative from each signing organization. Also, the redlines must be documented on the Test Procedure Deviation MSFC Form 3959” to paragraph 5.5; deleted sections 5.6 and 5.7; deleted “The MM will assure the use of the PHTR and the NASA Critical Item Label” from the definition for Move Manager
7、; delete definition for Move Report; changed paragraph 5.14 to read “This document or an equivalent describes the information necessary to move PCH as required by NPG 6000.1 for all Class I items. The handling/moving plan suffices this requirement.”; section 6, Instructions, changed to read “For han
8、dcarry items, as defined in 5.3, perform the following instructions.”; deleted “or MSH” from paragraph 6.1; added “or equivalent” to paragraph 6.2; deleted paragraph 6.3; deleted section “For MSH items”; added An approved handling/moving plan shall be utilized each time a PCH item is moved unless th
9、e item is a handcarry. For PCH items, as defined in 5.12, perform the following instructions.”; added item 6.5; deleted paragraph 6.20.1.c; added “Assure that shipments of PCH to/from MSFC are coordinated with the PCH/PE” to paragraph 6.20.1.3; deleted paragraphs 6.20.1.f, h, and j”; added 6.20.1.8(
10、4); added paragraph 6.20.1.15; deleted “The degree of S deleted “A permanent record of completed handling/moving plans shall be impounded by the responsible quality organization for a minimum of 3 years” from paragraph 6.20.2.2; deleted paragraph 6.20.3.c.10 and 11; changed 6.20.3.3.i to read “certi
11、fications. In conjunction with S added 6.20.3.3.m; deleted paragraph 6.20.3.e.3; deleted 6.20.3.f.6; changed “MPG 1700.1” in section 8 to “MPG 8715.1”; changed section 9, Records to read “by S and changed “MPG 1700.1” in section 10 to “MWI 3410.1”. Revision C 2/18/2004 Renamed NSS/GO 1740.9 to NASA-
12、STD-8719.9,” Safety Standard for Lifting Devices and Equipment” Section 6.20.3.5 changed “Property Management Group” to “Transportation and Logistics Engineering Group” Revision D 10/28/2004 In compliance with Centerwide action (CAITS# 04- DA01-0387) changed all occurrences of MPG to MPR and reworde
13、d document as necessary to differentiate requirement statements from supporting text. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date
14、: October 23, 2008 Page 3 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE Revision E 03/09/2006 Renamed organization codes. Updated S (2) unique handling equipment for each operation; (3) the preparation and
15、approval of handling/moving plans at MSFC; and/or (4) the preparation of the PHTR or equivalent for each item of PCH to be moved. This responsibility encompasses MSFC and offsite contractor efforts to assure that all elements understand and accomplish assigned function, all equipment and handling/mo
16、ving plans are available to support program schedules, and handling/moving problems are promptly identified and resolved. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revisi
17、on: F Program Critical Hardware Date: October 23, 2008 Page 10 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 6.16.1.9 Design or review and approve the design of all special loading and handling equipment, t
18、est fixtures, special shipping containers, tooling, and support hardware required in the off-loading, loading, transporting, and installation of PCH. 6.16.1.10 Technically manage and physically perform, using certified personnel/equipment, the handling/moving and assembly of PCH within the organizat
19、ions operational perimeters (test stands, test fixtures, buildings) whenever the move is incidental to the test or work being performed on the hardware. 6.16.1.11 Provide a civil service MM for those handling/moving operations which do not require FMO COSS contractor support. The MM shall monitor mo
20、vements of PCH. 6.16.1.12 Assure that all equipment used by the director/managers organization for lifting and handling of PCH is tested and operated in accordance with NASA-STD-8719.9 and MWI 6430.1. 6.16.1.13 For contractor-developed hardware, assure that procurement specifications contain the req
21、uirement for preparation and implementation of detailed handling/moving plans. 6.16.1.14 Utilize the services of SQ&MS Department and the PCH/PE in the development of the required handling/moving plans and techniques to assure the maximum consideration of the safety of personnel and material is obse
22、rved. 6.16.1.15 A permanent record of completed handling/moving plans shall be maintained by the MLR. The MLR shall maintain and disposition these documents within their Program/Project Plan documentation in accordance with NPR 1441.1. 6.16.2 Director, SQ&MS Directorate, shall: 6.16.2.1 Ensure advic
23、e and assistance to Center organizations on the safety and quality aspects of the design and operational activities involved in packaging, handling, and moving PCH. 6.16.2.2 Ensure PCH handling/move plans and related documentation (hazard analysis and equipment variances, when required) are reviewed
24、 and approved by the appropriate SQ&MS (safety and quality representatives). 6.16.2.3 Ensure PCH handling/moves are monitored by the appropriate SQ&MS Department (safety and quality representatives). NOTE: Hand-carried PCH does not require SQ&MS monitoring unless specified in a procedure or program/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI64101REVF2008PACKAGINGHANDLINGANDMOVINGPROGRAMCRITICALHARDWARE 包装 装运 移动 程序 关键 硬件 PDF

链接地址:http://www.mydoc123.com/p-822906.html