MSFC NASA MPR 7123 1 REV R-2009 MSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTS《马歇尔太空飞行中心系统工程过程和要求》.pdf
《MSFC NASA MPR 7123 1 REV R-2009 MSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTS《马歇尔太空飞行中心系统工程过程和要求》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MPR 7123 1 REV R-2009 MSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTS《马歇尔太空飞行中心系统工程过程和要求》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 7123.1 BASELINE EFFECTIVE DATE: July 10, 2009 EXPIRATION DATE: July 10, 2014 MARSHALL PROCEDURAL REQUIREMENTS DA01 MSFC SYSTEMS ENGINEERING PROCESSES AND REQUIREM
2、ENTS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC Systems Engineering Processes and Requirements MPR 7123.1 Revision: Baseline Date: July 10, 2009 Page 2 of 36 CHECK THE MASTER LIST at https:/repository.m
3、sfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 7/10/2009 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
4、om IHS-,-,-Marshall Procedural Requirements DA01 MSFC Systems Engineering Processes and Requirements MPR 7123.1 Revision: Baseline Date: July 10, 2009 Page 3 of 36 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TA
5、BLE OF CONTENTS Preface P.1 Purpose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 References P.6 Cancellation Document Content 1. Definitions 2. Responsibilities 2.1 MSFC Center Director 2.2 MSFC Engineering Director 2.3 Program/Project/Activity Manager 2.4 Engineering Line Management
6、 2.5 Designated Governing Authority 2.6 Multi-Center Programs/Projects 2.7 Software 3. Procedures 3.1 Program/Project/Activity Systems Engineering Life-Cycle 3.2 System Design Processes 3.3 Product Realization Processes 3.4 Technical Management Processes 3.5 SEMP Common Technical Process Implementat
7、ion Matrix 3.6 SEMP Maintenance 4. Records 4.1 Records Custodian 4.2 Records Retention 5. Flow Diagram Appendix A SEMP Appendix B DGA Appendix C Best Practices Appendix D Acronyms Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Re
8、quirements DA01 MSFC Systems Engineering Processes and Requirements MPR 7123.1 Revision: Baseline Date: July 10, 2009 Page 4 of 36 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE a. This Marshal
9、l Procedural Requirements (MPR) document implements the Agency Systems Engineering Management requirements documented in NASA Procedural Requirements (NPR) 7123.1. The NPR mandates seventeen (17) processes to be used for consistency in Systems Engineering (SE) throughout the Agency. These processes
10、focus on defining stakeholder expectations and implementing a systematic approach for satisfying those expectations. The processes are extracted from industry, national, international, and Agency standards. These processes provide the best typical practices currently available. The processes and con
11、cepts are not new, but the context and terminology may be unfamiliar. b. The implementation plan of system engineering requirements at Marshall Space Flight Center (MSFC) was submitted and approved in August 2006. The MSFC Systems Engineering requirements can be summarized in four simple statements:
12、 (1) Every Program/Project/Activity shall have a Systems Engineering Management Plan (SEMP); (2) A SEMP shall contain the mandatory sections outlined and annotated in Appendix A of this MPR; (3) Every SEMP shall be approved by a Designated Governing Authority (DGA) as defined by Appendix B of this M
13、PR; and (4) The Engineering Line Management shall ensure compliance with the approved SEMP. c. All additional requirements and information in this MPR provide amplification on these four requirement statements. P.2 APPLICABILITY a. This MPR applies to the personnel, programs, projects, and activitie
14、s at MSFC and MSFCs Michoud Assembly Facility, including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partner
15、s, or other agreement parties.) b. Applying the common technical processes and reviews may also benefit Basic and Applied Research (BAR) and Advanced Technology Development (ATD) projects. The processes in this MPR and the reviews detailed in MPR 7123.2 are recommended but not required for BAR and A
16、TD projects. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC Systems Engineering Processes and Requirements MPR 7123.1 Revision: Baseline Date: July 10, 2009 Page 5 of 36 CHECK THE MASTER LIST at https:/repo
17、sitory.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE P.3 AUTHORITY a. NPR 7123.1, “NASA Systems Engineering Processes and Requirements” b. NPR 7150.2, “NASA Software Engineering Requirements” P.4 APPLICABLE DOCUMENTS a. NPD 2820.1, “NASA Software Policy”
18、b. NPR 1441.1, “NASA Records Retention Schedules” c. MPR 1280.2, “Process Control” d. MPR 1440.2, “MSFC Records Management Program” e. MPR 4000.1, “Control of Customer-Supplied Product” f. MPR 5000.1, “Purchasing” g. MPR 6410.1, “Handling, Storage, Packaging, Preservation, and Delivery (HSPPD)” h. M
19、PR 7120.3, “Data Management, Programs/Projects” i. MPR 7123.2, “Technical Reviews and Review Item Discrepancy (RID) Processing, MSFC Programs and Projects” j. MPR 8040.1, “Configuration Management, MSFC Programs/Projects” k. MPR 8823.1, “Design Control of Facilities” l. MWI 1280.1, “Mechanical Fabri
20、cation Request Instructions” m. MWI 5100.1, “Initiating Procurement Requisitions” n. MWI 6410.1, “Packaging, Handling, and Moving Program Critical Hardware” o. MWI 7120.2, “Data Identification/Definition” p. MWI 7120.4, “Document Preparation, Programs and Projects” q. MWI 7120.6, “Program/Project Co
21、ntinuous Risk Management” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC Systems Engineering Processes and Requirements MPR 7123.1 Revision: Baseline Date: July 10, 2009 Page 6 of 36 CHECK THE MASTER LIST a
22、t https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE r. MWI 7123.1, “Systems Engineering Stakeholder Expectations, Requirements Definition, and Management Processes” s. MWI 8050.1, “Verification and Validation of Hardware, Software, and Groun
23、d Support Equipment for MSFC Projects” P.5 REFERENCES a. NASA/SP-2007-6105, “NASA Systems Engineering Handbook” b. MPR 8500.1, “MSFC Environmental Management Program” c. MSFC-HDBK-3173, “MSFC Project Management and Systems Engineering Handbook” d. CMMI Guidelines for Process Integration and Product
24、Improvement Addison-Wesley e. MSFC Systems Engineering Implementation Plan Submitted: August 2006 P.6 CANCELLATION None. Original signed by Robert M. Lightfoot Acting Director Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requir
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR71231REVR2009MSFCSYSTEMSENGINEERINGPROCESSESANDREQUIREMENTS 马歇尔 太空飞行 中心 系统工程 过程 要求 PDF

链接地址:http://www.mydoc123.com/p-822881.html