MSFC NASA MPR 7120 5 REV F-2009 EARNED VALUE MANAGEMENT SYSTEM REQUIREMENTS《赢值管理系统要求》.pdf
《MSFC NASA MPR 7120 5 REV F-2009 EARNED VALUE MANAGEMENT SYSTEM REQUIREMENTS《赢值管理系统要求》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MPR 7120 5 REV F-2009 EARNED VALUE MANAGEMENT SYSTEM REQUIREMENTS《赢值管理系统要求》.pdf(63页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 7120.5 BASELINE EFFECTIVE DATE: May 11, 2009 EXPIRATION DATE: May 11, 2014 MARSHALL PROCEDURAL REQUIREMENTS CS01 EARNED VALUE MANAGEMENT SYSTEM REQUIREMENTS Provi
2、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements CS01 Earned Value Management System Requirements MPR 7120.5 Revision: Baseline Date: May 11, 2009 Page 2 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/direct
3、ives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/11/2009 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall
4、 Procedural Requirements CS01 Earned Value Management System Requirements MPR 7120.5 Revision: Baseline Date: May 11, 2009 Page 3 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS PREFACE . 4
5、P.1 PURPOSE . 4 P.2 APPLICABILITY 4 P.3 AUTHORITY . 5 P.4 APPLICABLE DOCUMENTS . 5 P.5 REFERENCES . 5 P.6 CANCELLATION . 6 DOCUMENT CONTENT . 7 1. DEFINITIONS 7 2. RESPONSIBILITIES . 11 3. PROCEDURE . 13 3.1 Organization 13 3.1.1 Product Structure . 13 3.1.2 Organization Structure 16 3.1.3 Indirect
6、Cost Responsibility 17 3.1.4 Control Accounts 17 3.2 Work Authorization 19 3.3 Planning and Scheduling . 21 3.3.1 Planning Work 22 3.3.2 Scheduling Work . 24 3.3.3 Project Integrated Master Schedule . 25 3.3.4 Performance Measurement Baseline . 27 3.4 Progress and Performance . 28 3.4.1 Schedule Sta
7、tus . 28 3.4.2 Accomplishment 29 3.5 Accounting 32 3.5.1 General Accounting 32 3.5.2 Direct Costs . 34 3.5.3 Indirect Costs 34 3.5.4 ACQUISITIONS . 34 3.6 Analysis and Forecasting 36 3.6.1 Thresholds . 36 3.6.2 Variance Analysis . 37 3.6.3 Forecasting 40 3.7 Revisions and Data Maintenance 41 3.7.1 R
8、outine Updates and Data Maintenance . 42 3.7.2 Internal Replanning . 44 3.7.3 Change Requests/Orders . 45 3.7.4 Work Transfers . 46 3.7.5 Retroactive Changes 47 4. RECORDS 48 APPENDIX A ACRONYMS . 56 APPENDIX B REQUIREMENTS MATRIX 60 APPENDIX C COMPLIANCE MATRIX . 61 APPENDIX Z GUIDANCE . 63 Provide
9、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements CS01 Earned Value Management System Requirements MPR 7120.5 Revision: Baseline Date: May 11, 2009 Page 4 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directiv
10、es/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE a. The purpose of this Marshall Procedural Requirements (MPR) document is to establish the Marshall Space Flight Center (MSFC) Earned Value Management (EVM) System (EVMS) requirements for projects managed or exe
11、cuted at MSFC. These requirements align with other National Aeronautics and Space Administration (NASA) and MSFC policy and requirements. b. The requirements in this document address necessary functions and products as determined by NASA and MSFC. These requirements are based on time-tested and prov
12、en sound project management and earned value principles. Applications of these principles are not limited to a single method, tool, or technique. The requirements listed within this document are meant to be interpreted as defining the necessary deliverable, product, or function with regards to conte
13、nt. Interpretation may not result in a single identical solution for every project. Instead, the principles and processes described within should be used to achieve consistent results. P.2 APPLICABILITY a. This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFCs Michou
14、d Assembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreemen
15、t parties.) b. This MPR applies to the portion of the project life cycle that begins with the issuance of a Project Formulation Authorization Document (FAD) and ends with the retirement, disposal, or delivery of the asset, product, or service. c. The NASA thresholds and guidelines for application of
16、 EVMS requirements are stated in NASA Procedural Requirements (NPR) NPR 7120.5D, “NASA Space Flight Program and Project Management Requirements” for Flight projects, NPR 7120.7, “NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements,” and NPR 7120.8
17、, “NASA Research participant roles and responsibilities; objectives; processes and procedures; organizational responsibilities and relationships; tools; reporting requirements; and related documents. It guides the overall implementation of schedule development and management over time. 1.37 Schedule
18、 Performance Index (SPI) Ratio of work accomplished versus work planned, for a specified time period. The SPI is an efficiency rating for work accomplishment, comparing work accomplished to what should have been accomplished. 1.38 Schedule Variance (SV) The difference between the budgeted cost of wo
19、rk performed and the budgeted cost of work scheduled at any point in time (BCWP-BCWS). 1.39 Sponsor An individual or an organization that authorizes a Performer to assume responsibility for defined technical, cost or scheduling requirements. 1.40 Statement of Work (SOW) A document that contains a na
20、rrative description of the work scope for a contract or project. 1.41 Undistributed Budget (UB) A budget applicable to specific project work scope that has not yet been distributed to Control Accounts or Summary Level Planning Packages. 1.42 Variance at Completion (VAC) An algebraic difference betwe
21、en Budget at Complete and Estimate at Complete. 1.43 Work Authorization Document (WAD)* A generic term that may be used to describe any document or group of documents that convey work scope, schedule, and budget requirements along with responsibility, authority, and traceability for these requiremen
22、ts. A Project Plan with all of these components can be one example of a WAD. 1.44 Work Breakdown Structure (WBS) A detailed, product oriented representation of all the work necessary to accomplish a documented scope of work. The WBS should be accompanied by a text document referred to as a WBS Dicti
23、onary that describes each element of the WBS in detail. 1.45 Work Package (WP)* A unit of work required to complete a specific job such as a report, a design, a drawing, a piece of hardware, or a service which is within the responsibility of one Provided by IHSNot for ResaleNo reproduction or networ
24、king permitted without license from IHS-,-,-Marshall Procedural Requirements CS01 Earned Value Management System Requirements MPR 7120.5 Revision: Baseline Date: May 11, 2009 Page 11 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORR
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR71205REVF2009EARNEDVALUEMANAGEMENTSYSTEMREQUIREMENTS 管理 系统 要求 PDF

链接地址:http://www.mydoc123.com/p-822880.html