1、 JOINT INDUSTRY STANDARD Moisture/Reflow Sensitivity Classification for Nonhermetic Surface Mount Devices IPC/JEDEC J-STD-020E December 2014 Supersedes IPC/JEDEC J-STD-020D.1 March 2008 Notice IPC and JEDEC Standards and Publications are designed to serve the public interest through eliminating misu
2、nderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for his particular need. Existence of such Standards and Publications shall not in any respect
3、 preclude any member or nonmember of IPC or JEDEC from manufacturing or selling products not conforming to such Standards and Publications, nor shall the existence of such Standards and Publications preclude their voluntary use by those other than IPC or JEDEC members, whether the standard is to be
4、used either domestically or internationally. Recommended Standards and Publications are adopted by IPC or JEDEC without regard to whether their adoption may involve patents on articles, materials, or processes. By such action, IPC or JEDEC do not assume any liability to any patent owner, nor do they
5、 assume any obligation whatever to parties adopting the Recommended Standard or Publication. Users are also wholly responsible for protecting themselves against all claims of liabilities for patent infringement. The material in this joint standard was developed by the IPC Plastic Chip Carrier Cracki
6、ng Task Group (B-10a) and the JEDEC JC-14.1 Committee on Reliability Test Methods for Packaged Devices Please use the Standard Improvement Form shown at the end of this document. Copyright 2014. JEDEC Solid State Technology Association, Arlington, Virginia, and IPC, Bannockburn, Illinois, USA. All r
7、ights reserved under both international and Pan-American copyright conventions. Any copying, scanning or other reproduction of these materials without the prior written consent of the copyright holder is strictly prohibited and constitutes infringement under the Copyright Law of the United States. F
8、or Technical Information Contact: JEDEC IPC Solid State Technology Association 3000 Lakeside Drive, Suite 309S 3103 North 10th Street, Suite 240-S Bannockburn, Illinois Arlington, VA 22201-2107 60015-1249 Tel 703 907.0026 Tel 847 615.7100 Fax 703.907.7501 Fax 847.615.7105 . Supersedes: IPC/JEDEC J-S
9、TD-020D.1 March 2008 IPC/JEDEC J-STD-020D August 2007 IPC/JEDEC J-STD-020C July 2004 IPC/JEDEC J-STD-020B July 2002 IPC/JEDEC J-STD-020A April 1999 J-STD-020 -October 1996 JEDEC JESD22-A112 IPC-SM-786A -January 1995 IPC-SM-786 -December 1990 IPC/JEDEC J-STD-020E Moisture/Reflow Sensitivity Classific
10、ation for Nonhermetic Surface Mount Devices A joint standard developed by the IPC Plastic Chip Carrier Cracking Task Group (B-10a) and the JEDEC JC-14.1 Committee on Reliability Test Methods for Packaged Devices Users of this standard are encouraged to participate in the development of future revisi
11、ons. Contact: JEDEC Solid State Technology Association3103 North 10th Street, Suite 240S Arlington, VA 22201- 2107 Tel 703 907.0026 Fax 703 907.7501 IPC 3000 Lakeside Drive, Suite 309S Bannockburn, Illinois 60015-1249 Tel 847 615.7100 Fax 847 615.7105 This Page Intentionally Left BlankAcknowledgment
12、Members of the IPC Association Connecting Electronics Industries IPC Plastic Chip Carrier Cracking Task Group (B-10a)and the JEDEC Solid State Technology Association JEDEC JC-14.1 Committee on Reliability Test Methods for PackagedDevices have worked together to develop this document. We would like t
13、o thank them for their dedication to this effort.Any document involving a complex technology draws material from a vast number of sources across many continents. Whilethe principal members of the Joint Moisture Classification Working Group are shown below, it is not possible to include allof those w
14、ho assisted in the evolution of this standard. To each of them, the members of the IPC and JEDEC extend theirgratitude.IPC Plastic Chip CarrierCracking Task GroupChairSteven R. MartellSonoscan, Inc.JEDEC JC 14.1CommitteeChairIfe HsuIntel CorporationVice ChairGautam VermaAltera CorporationJoint Moist
15、ure Classification Working Group MembersDoug Derry, AccuAssemblyDavid Gaydos, ACI Technologies,Inc.Russell Nowland, Alcatel-LucentBradley Smith, Allegro MicroSystemsInc.Maurice Brodeur, Analog DevicesInc.Bill Strachan, ASTA - PortsmouthUniversityLyle Burhenn, BAE SystemsPlatform SolutionsThomas Clee
16、re, BAE SystemsPlatform SolutionsJoseph Kane, BAE Systems PlatformSolutionsMary Bellon, Boeing Research then the total time of the interruption should be excludedfrom the bake time. The interruption time should be accounted and no greater than 1 hour, then re-incorporated to ensureminimum of 24 hour
17、s. For instance, if the interruption was 45 minute, then the total bake test time would be 24 hours and45 minutes. If greater than 1 hour the bake should be restarted for a full 24 hours.5.5 Moisture Soak Place devices in a clean, dry, shallow container so that the package bodies do not touch or ove
18、rlapeach other. Submit each sample to the appropriate soak requirements shown in Table 5-1. At all times parts should behandled using proper ESD procedures in accordance with JESD625.IPC/JEDEC J-STD-020E January 201565.6 Reflow Not sooner than 15 minutes and not longer than 4 hours after removal fro
19、m the temperature/humidity cham-ber, subject the sample to 3 cycles of the appropriate reflow conditions as defined in Table 5-2 and Figure 5-1. If the tim-ing between removal from the temperature/humidity chamber and initial reflow cannot be met, then the parts must berebaked and resoaked according
20、 to 5.4 and 5.5. The time between reflows shall be 5 minutes minimum and 60 minutesmaximum.Note 1: All temperatures refer to the center of the package, measured on the package body surface that is facing up duringassembly reflow (e.g., live-bug orientation).If parts are reflowed in other than the no
21、rmal live bug assembly reflow orientation, (i.e., dead-bug orientation), Tpshall bewithin2Cofthelive bug Tpand still meet the Tcrequirements, otherwise the profile shall be adjusted to achieve thelatter.To accurately measure actual peak package body temperatures refer to JEP140 for recommended therm
22、ocouple use.Note 2: The oven should be loaded with the same configuration or verified equivalent thermal load when running parts orbeing profiled.Table 5-1 Moisture Sensitivity LevelsLEVELFLOOR LIFE4SOAK REQUIREMENTS3STANDARDACCELERATED EQUIVALENT1eV0.40-0.48eV0.30-0.39CONDITIONTIME CONDITION TIME (
23、hours) CONDITION TIME (hours) TIME (hours)1 Unlimited30 C/85%RH168+5/-085 C/85%RHNA NA NA2 1 year30 C/60%RH168+5/-085 C/60%RHNA NA NA2a 4 weeks30 C/60%RH6962+5/-030 C/60%RH120+1/-0168+1/-060 C/60%RH3 168 hours30 C/60%RH1922+5/-030 C/60%RH40+1/-052+1/-060 C/60%RH4 72 hours30 C/60%RH962+2/-030 C/60%RH
24、20+0.5/-024+0.5/-060 C/60%RH5 48 hours30 C/60%RH722+2/-030 C/60%RH15+0.5/-020+0.5/-060 C/60%RH5a 24 hours30 C/60%RH482+2/-030 C/60%RH10+0.5/-013+0.5/-060 C/60%RH6Time on Label(TOL)30 C/60%RHTOL30 C/60%RHNA NA NANote 1: CAUTION - To use the accelerated equivalent soak conditions, correlation of damag
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- JEDECJSTD020E2014MOISTUREREFLOWSENSITIVITYCLASSIFICATIONFORNONHERMETICSURFACEMOUNTDEVICESPDF

链接地址:http://www.mydoc123.com/p-806933.html