ITU-T X 150-1988 PRINCIPLES OF MAINTENANCE TESTING FOR PUBLIC DATA NETWORKS USING DATA TERMINAL EQUIPMENT (DTE) AND DATA CIRCUIT-TERMINATING EQUIPMENT (DCE) TEST LOOPS《使用数据终端设备(DTE.pdf
《ITU-T X 150-1988 PRINCIPLES OF MAINTENANCE TESTING FOR PUBLIC DATA NETWORKS USING DATA TERMINAL EQUIPMENT (DTE) AND DATA CIRCUIT-TERMINATING EQUIPMENT (DCE) TEST LOOPS《使用数据终端设备(DTE.pdf》由会员分享,可在线阅读,更多相关《ITU-T X 150-1988 PRINCIPLES OF MAINTENANCE TESTING FOR PUBLIC DATA NETWORKS USING DATA TERMINAL EQUIPMENT (DTE) AND DATA CIRCUIT-TERMINATING EQUIPMENT (DCE) TEST LOOPS《使用数据终端设备(DTE.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 8 TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU05“,)#G0G0$!4!G0G0.%47/2+3-!).4%.!.#%02).#)0,%3G0G0/ amended at Malaga-Torremolinos, 1984)1 IntroductionThe CCITT,considering(a) the increasing use being made of data transmission systems;(b) the volume of th
2、e information circulating on data transmission networks;(c) the savings to be made by reducing interruption time on such data circuits;(d) the importance of being able to determine responsibilities (of necessity involving several parties) inmaintenance questions for networks; and(e) the advantages o
3、f standardization in this field,unanimously declaresthat the locating of faults can be facilitated in many cases by data circuit loop testing procedures in DTEs andDCEs.2 ScopeThis Recommendation specifies the principles of maintenance testing for public data networks using theDTE/DCE test loops. Th
4、e definition of the loops, the principles for the control of the loops and the principles for theindications to be presented when the loops are activated are described herein for general application with all DTE/DCEinterfaces. Specific details concerning the implementation of these principles are co
5、ntained in the individual DTE/DCEinterface Recommendations. The maintenance philosophy, definitions and general principles are applicable to interfaceRecommendations, such as X.20, X.20 bis, X.21, X.21 bis, and X.22.2.1 Maintenance philosophyThe provision of DTE and DCE test loops in public data net
6、works is based upon the following maintenancephilosophy:a) test loops may be used by an Administrations test centre(s) to test the operation of either leased lines orcircuit-switched network subscriber lines, including either all or part of the DCE, without necessarilyrequiring the dispatch of netwo
7、rk maintenance personnel to the subscribers premises;b) where, allowed by national testing principles, DCE test loops may also be used by a DTE to test theoperation of network connection or leased lines. Where provided, the intent is for the DTE to make initialtests to isolate a trouble condition ei
8、ther in the DTEs or in the data circuit.2.2 Loop testing principlesThe provision of loop testing capabilities should be based on the following principles:a) the loops should be transparent, e.g. they should be bit sequence independent;b) loop testing is a disruptive type of testing, e.g. when a loop
9、 has been established transmission of data is notpossible;c) test loops may be established from any state; however, when loop testing is commenced from the datatransfer state, the same test procedures may be used for both leased lines and circuit-switched connections;2 Fascicle VIII.3 - Rec. X.150d)
10、 when allowed, the preferred DTE test sequence is: loop 1 - loop 2 - loop 3, sequentially from both ends ofthe circuit.3 Definition of the loopsNine loops are defined as shown in Figure 1/X.150. For clarity these nine loops have been grouped asfollows:a) DTE test loop - type 1 loop ( 3.1)Loop 1 ( 3.
11、1.1)b) Local test loops - type 3 loops ( 3.2)Loop 3d ( 3.2.1)Loop 3c ( 3.2.2)Loop 3b ( 3.2.3)Loop 3a ( 3.2.4)c) Subscriber-line test loops - type 4 loops ( 3.3)Loop 4a ( 3.3.1)Loop 4b ( 3.3.2)d) Network test loops - type 2 loops ( 3.4)Loop 2b ( 3.4.1)Loop 2a ( 3.4.2)3.1 DTE test loop - type 1 loop3.
12、1.1 Loop 1This loop is used as a basic test of the operation of the DTE, by looping back the transmitted signals inside theDTE for checking. The loop should be set up inside the DTE as close as possible to the DTE/DCE interface.Loop 1 may be established from either the data transfer or ready state.I
13、n some networks, for short routine tests during the data transfer state, the DTE should either maintain the samestatus on the interchange circuits as before the test or where possible send the DTE controlled not ready signal.Fascicle VIII.3 - Rec. X.150 3If the loop is established from the data tran
14、sfer state, the DCE may continue to deliver data to the DTE duringthe test as though the DTE were in normal operation. It will be the responsibility of the DTEs to recover from any errorsthat might occur while the test loop is activated.If the loop is established from the ready state, the DTE should
15、 continue to monitor so that an incoming call maybe given priority over a routine test. Alternatively, in cases where the DTE cannot accept incoming calls, DTEs shallsignal one of the not ready states.The DCE continues to present signal element timing and, if implemented, byte timing. The DTE need n
16、ot makeuse of the timing information during a loop test.3.2 Local test loops - type 3 loopsLocal test loops (type 3 loops) are used to test the operation of the DTE, the interconnecting cable and either allor parts of the local DCE, as discussed below.Where allowed by national testing principles, lo
17、op 3 may be established from any state.4 Fascicle VIII.3 - Rec. X.150For testing on leased circuits and for short duration testing on circuit-switched connections, the DCE shouldeither continue to present toward the line the conditions that existed before the test (e.g. either data transfer or ready
18、state) or send the controlled not ready state to the remote DTE. Where this is not practical (e.g. in some cases for loop3a) or desirable (e.g. for long duration testing in circuit-switched applications), the DCE should terminate an existing calland, if possible, signal toward the subscriber-line on
19、e of the not ready states.The DCE continues to present signal element timing, and, if implemented, byte timing. The DTE must make useof the timing information.3.2.1 Loop 3dThis loop is used to test the operation of the DTE, including the inter-connecting cable, by returning transmittedsignals to the
20、 DTE for checking. The loop is set up inside the local DCE and does not include interchange circuitgenerators and loads. The DCE may make either type 2 or type 4 loop tests during the loop 3d test condition.Note - While test loop 3d is operated, the effective length of the interface cable is doubled
21、. Therefore, to insureproper operation of loop 3d, the maximum DTE/DCE interface cable length should be one-half the length normallyappropriate for the data signalling rate in use.3.2.2 Loop 3cThis loop is used to test the operation of the DTE, including the inter-connecting cable and DCE interchang
22、ecircuit generators and loads. In this case, the Note in 3.2.1 concerning restrictions of interconnecting cable length doesnot apply.3.2.3 Loop 3bThis loop is used as a test of the operation of the DTE and the line coding and control logic and circuitry of theDCE. It includes all the circuitry of th
23、e DCE, with the exclusion of the line signal conditioning circuitry (e.g. impedancematching transformers, amplifiers, equalizers, etc.). The delay between transmitted and received test data is a few octets.Note - In some DCEs, the setting of loop 3b will result in momentary loss of envelope alignmen
24、t causingspurious signals to appear on receiving interchange circuits for a period of time. This may impact upon the DTE testprocedure. Refer to the DTE/DCE Recommendations for information regarding the signal element timing. In somenetworks, the setting of loop 3b will cause clearing of existing co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTX1501988PRINCIPLESOFMAINTENANCETESTINGFORPUBLICDATANETWORKSUSINGDATATERMINALEQUIPMENTDTEANDDATACIRCUITTERMINATINGEQUIPMENTDCETESTLOOPS

链接地址:http://www.mydoc123.com/p-804687.html