ITU-R F 1501-2000 Coordination Distance for Systems in the Fixed Service (FS) Involving High-Altitude Platform Stations (HAPs) Sharing the Frequency Bands 47 2-47 5 GHz and 47 9-48.pdf
《ITU-R F 1501-2000 Coordination Distance for Systems in the Fixed Service (FS) Involving High-Altitude Platform Stations (HAPs) Sharing the Frequency Bands 47 2-47 5 GHz and 47 9-48.pdf》由会员分享,可在线阅读,更多相关《ITU-R F 1501-2000 Coordination Distance for Systems in the Fixed Service (FS) Involving High-Altitude Platform Stations (HAPs) Sharing the Frequency Bands 47 2-47 5 GHz and 47 9-48.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 Rec. ITU-R F.1501 1 RECOMMENDATION ITU-R F.1501 COORDINATION DISTANCE FOR SYSTEMS IN THE FIXED SERVICE (FS) INVOLVING HIGH-ALTITUDE PLATFORM STATIONS (HAPSs) SHARING THE FREQUENCY BANDS 47.2-47.5 GHz AND 47.9-48.2 GHz WITH OTHER SYSTEMS IN THE FIXED SERVICE (Question ITU-R 212/9) (2000) Rec. ITU-R
2、F.1501 The ITU Radiocommunication Assembly, considering a) that WRC-97 designated the bands 47.2-47.5 GHz and 47.9-48.2 GHz for use by HAPSs in the FS; b) that, subject to the provisions of Resolution 122 (Rev.WRC-2000), these bands are also allocated for use by the fixed, fixed-satellite and mobile
3、 services; c) that frequency sharing for fixed-service systems using HAPSs and other systems in the FS is being considered in ITU-R; d) that there may be a requirement to establish criteria for determining coordination distances within which detailed sharing arrangements would need to be considered,
4、 or that there may be a requirement to specify predetermined coordination distances, recommends 1 that Annex 1 should be used for the determination of coordination distance or as a basis for establishing a predetermined coordination distance between stations operating in a high-altitude platform net
5、work (HAPN) and other stations in the FS. ANNEX 1 Coordination distance for systems involving the use of HAPSs 1 Geometrical coordination distance For an initial assessment, it may be appropriate to use a coordination distance based on the above-the-horizon visibility (including atmospheric refracti
6、on) between a HAPS and other stations in the conventional FS or in HAPN. The following predetermined coordination distance (measured from the sub-HAPS point) should be adopted between a HAPS and ground terminals of other systems in the conventional FS or in different HAPNs: km)274.06.141(150 hh+ (1)
7、 where h is the HAPS altitude (km) above sea level in the 20-50 km range. The following predetermined coordination distance (measured from the sub-HAPS point) should be adopted between HAPSs in different systems: km)274.06.141()274.06.141(2211hhhh + (2) where h1and h2are the HAPS altitude (km) above
8、 sea level of two systems, both in the 20-50 km range. 2 Rec. ITU-R F.1501 2 Coordination distance using typical system parameters and representative propagation conditions for the bands of 47.2-47.5 GHz and 47.9-48.2 GHz 2.1 Minimum propagation attenuation due to atmospheric gases 2.1.1 Attenuation
9、 between a HAPS and ground terminals In the path between a HAPS and ground terminals of other systems in the conventional FS or in different HAPN, atmospheric gases including water vapour cause attenuation, which depends on the distribution along the path of meteorological parameters such as tempera
10、ture, pressure and humidity, and thus varies with the geographic location of the site, the month of the year, the height of a ground terminal above sea level, the elevation angle of the slant path and the operating frequency. According to Recommendation ITU-R SF.1395, the following numerical formula
11、e can be used for estimating minimum slant path attenuation in the 47 GHz band where: AL (h, ), AM(h, ) and AH(h, ): total atmospheric absorption loss (dB) for the low-latitude (within 22.5 of the Equator), mid-latitude (greater than 22.5, but less than 45 from the Equator) and high-latitude (45 or
12、more from the Equator) areas, respectively; h and : ground terminal antenna altitude above sea level (km) and elevation angle (degrees), respectively. The approximation was carried out for 0 h 3 km and 0 90. The actual elevation angle may be determined from the elevation angle developed under free s
13、pace propagation conditions using the method in Recommen-dation ITU-R F.1333. For actual elevation angles below 0, the attenuation for 0 should be used. Frequency band 47.2-47.5 GHz In this frequency band, the attenuation is larger at higher frequencies and, therefore, the following formulae give th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITURF15012000COORDINATIONDISTANCEFORSYSTEMSINTHEFIXEDSERVICEFSINVOLVINGHIGHALTITUDEPLATFORMSTATIONSHAPSSHARINGTHEFREQUENCYBANDS472475GHZAND47948PDF

链接地址:http://www.mydoc123.com/p-791056.html