ISA RP60 2-1995 Control Center Design Guide and Terminology《控制中心设计指南和术语》.pdf
《ISA RP60 2-1995 Control Center Design Guide and Terminology《控制中心设计指南和术语》.pdf》由会员分享,可在线阅读,更多相关《ISA RP60 2-1995 Control Center Design Guide and Terminology《控制中心设计指南和术语》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、Control Center DesignGuide and TerminologyApproved 28 February 1995ISARP60.21995RECOMMENDED PRACTICEISA The Instrumentation,Systems, andAutomation Society TMCopyright 1995 by the Instrument Society of America. All rights reserved. Printed in the UnitedStates of America. No part of this publication m
2、ay be reproduced, stored in a retrieval system, ortransmitted in any form or by any means (electronic, mechanical, photocopying, recording, orotherwise), without the prior written permission of the publisher.ISA67 Alexander DriveP.O. Box 12277Research Triangle Park, North Carolina 27709ISARP60.21995
3、, Control Center Design Guide and TerminologyISBN: 1-55617-560-4ISA-RP60.2-1995 3PrefaceThis preface as well as all footnotes and appendices is included for informational purposes and is not part of ISA-RP60.2-1995.This recommended practice has been prepared as part of the service of ISA, the intern
4、ational society for measurement and control, toward a goal of uniformity in the field of instrumentation. To be of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and asks that they be addresse
5、d to the Secretary, Standards and Practices Board; ISA; 67 Alexander Drive; P. O. Box 12277; Research Triangle Park, NC 27709; Telephone (919) 990-9227; Fax (919) 549-8288; e-mail: standardsisa.org.The ISA Standards and Practices Department is aware of the growing need for attention to the metric sy
6、stem of units in general, and the International System of Units (SI) in particular, in the preparation of instrumentation standards, recommended practices, and technical reports. The Department is further aware of the benefits to U.S.A. users of ISA standards of incorporating suitable references to
7、the SI (and the metric system) in their business and professional dealings with other countries. Toward this end, this Department will endeavor to introduce SI-acceptable metric units in all new and revised standards to the greatest extent possible. The Metric Practice Guide, which has been publishe
8、d by the Institute of Electrical and Electronics Engineers as ANSI/IEEE Std. 268-1992, and future revisions, will be the reference guide for definitions, symbols, abbreviations, and conversion factors.It is the policy of ISA to encourage and welcome the participation of all concerned individuals and
9、 interests in the development of ISA standards, recommended practices, and technical reports. Participation in the ISA standards-making process by an individual in no way constitutes endorsement by the employer of that individual, of ISA, or of any of the standards that ISA develops.This recommended
10、 practice is one of a series that constitutes the control center standard, ISA-S60. The individual sections provide continuity of presentation, convenience of reference, and flexibility of revision. The complete standard consists of the following sections:SECTION TITLE SCOPERP60.1 Control Center Gui
11、de for preparation of engineeringFacilities designs and specifications for control center facilities.RP60.2 Control Center Design methods and terminology Design Guide and used in the specification of controlTerminology center facilities.RP60.3 Human Engineering Design concepts accommodatingfor Contr
12、ol Centers human physiological capabilities.RP60.4 Documentation for Guide to the documentationControl Centers associated with control center specifications.4 ISA-RP60.2-1995dRP60.5 Control Center Guide to the use of available graphicGraphic Displays display techniques.RP60.6 Nameplates, Labels, Gui
13、de to the methods ofand Tags for identification of control center Control Centers equipment and parts.dRP60.7 Control Center Guide to control center profiles,Construction fabrication and finish methods, andenclosure selection.RP60.8 Electrical Guide Design concepts for control center for Control Cen
14、ters electrical requirements.RP60.9 Piping Guide for Design concepts for control centerControl Centers piping requirements.dRP60.10 Control Center Guide to the methods of inspection Inspection and and testing prior to control centerTesting acceptance.RP60.11 Crating, Shipping, Guide to methods for c
15、ontrol centerand Handling for crating, shipping, and handling.Control CentersDraft Recommended Practice. For additional information on the status of this document, contact ISA Headquarters.The following people served as members of ISA Committee RP60.2:NAME COMPANYR. Borut, Chairman M. W. Kellogg Com
16、panyH. Hopkins, Managing Director Utility Products of ArizonaW. Aird Aird Telcom AssociatesA. Alworth ConsultantC. Armstrong EGSC. Aured Silent Watchman Corporation*B. Ball The Foxboro CompanyA. Barsamian 3X CorporationS. Boyer Illiad Energy Inc.*J. Cusak Moore Products CompanyF. Durfee Toptools Aut
17、omation SystemsG. Erk ConsultantJ. Fertitta ConsultantT. Holland Johnson Controls, Inc.A. Kayser Malcolm Pirnie Inc.C. Lisser ConsultantJ. Macosko Liebert CorporationW. Maxwell Lower Colorado River Authority*One vote per companyISA-RP60.2-1995 5NAME COMPANYR. Munz Mundix Control Center, Inc.D. Neal
18、Texaco Inc.J. Phillips American Electric Power CorporationH. Solk ConsultantI. Stubbs Consultant*M. Walsh The Foxboro CompanyR. Welch Saudi AramcoW. G. Williams ConsultantW. T. Williams Lockwood Greene Engineers, Inc.*W. Wylupek Moore Products CompanyThis recommended practice was approved for public
19、ation by the ISA Standards and Practices Board on February 28, 1995.NAME COMPANYM. Widmeyer, Vice President Washington Public Power Supply SystemH. Baumann H. D. Baumann 2) CCD Engineering Construction Contractor(s), (ECC); and3) CCD contracted individual.The interfaces between the CCD and the other
20、 entities remain the same in all of the above.10 ISA-RP60.2-19954.1 Planning activitiesBefore a control center project is initiated, the owner should have a budget estimate. When the project is initiated, a qualified CCD should be designated. Certain items that should be considered early in the plan
21、ning stage should be in the hands of the CCD prior to the start of the design. Many people can add significantly to the information the CCD will need, and these people should be consulted. These include personnel from production, process engineering, instrument engineering, facilities, maintenance,
22、safety and utilities, who can assist in supplying the following information.4.1.1 Plant typeThe type of plant indicates, in general, the size of the control center; the number of control schemes; the degree of possible hazards, such as environmental, fire, explosion, or toxic materials; types of con
23、trol required; and location of the process and peripheral equipment.4.1.2 Plant locationThe geographical location of the plant has a direct influence on the placement of the control center. Knowledge of seismic activity, weather, sunrise/sunset, heat/cold, and prevailing winds could, for example, ha
24、ve an effect on the location or orientation of the control center facility and the cubicles and consoles within it. Geographical location also will affect items in 4.1.3 and 4.1.4. The geographical location also will be a factor in the costs of engineering and installation-e.g., travel time and expe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISARP6021995CONTROLCENTERDESIGNGUIDEANDTERMINOLOGY 控制中心 设计 指南 术语 PDF

链接地址:http://www.mydoc123.com/p-789915.html