INTERN CEMS BT-38-2009 Test For Water Content In Air Conditioner Refrigerant《空调制冷剂中水含量的测定》.pdf
《INTERN CEMS BT-38-2009 Test For Water Content In Air Conditioner Refrigerant《空调制冷剂中水含量的测定》.pdf》由会员分享,可在线阅读,更多相关《INTERN CEMS BT-38-2009 Test For Water Content In Air Conditioner Refrigerant《空调制冷剂中水含量的测定》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2009 by Navistar, Inc. AUGUST 2009 Page 1 of 3 NAVISTAR, INC. CEMS (CORPORATE ENGINEERING MATERIAL SPECI
2、FICATION) NUMBER: CEMS BT-38 TITLE: Test For Water Content In Air Conditioner Refrigerant CURRENT ISSUE DATE: August 2009 WRITTEN/REVIEWED BY: Materials Engineering APPROVED BY: Materials Engineering SUPERSEDES ISSUE OF: October 2001 PRINTED COPIES OF THIS DOCUMENT MUST BE VERIFIED FOR CURRENT REVIS
3、ION This specification may involve hazardous materials, equipment, and procedures. This specification does not purport to address all of the safety issues associated with its use. The user is responsible to consult appropriate safety and health practices and to determine the applicability of regulat
4、ory limits prior to use. Change Notice: Replaced “International Truck and Engine Corporation” with “Navistar, Inc.” per corporate directive. 1.0 APPLICATION This is a method for determining the water content of air conditioner refrigerant.* In the event of disagreement in regard to water content as
5、determined by this test method or by other methods: The Karl Fisher Test Method, as per ASTM E700, will be the referee test. 2.0 SCOPE This specification describes the test method. 3.0 APPARATUS 3.1 Portable moisture monitor, DuPont Model 303, available from Ametek Corp., 455 Corporate Blvd., Pencad
6、er Corp. Center, Newark, Delaware 19702. 3.2 Adapter valve for drawing sample from refrigerant container. 4.0 PROCEDURE 4.1 For line operation, make sure the slide switch in the rear is in the “AC” position; plug the moisture monitor into an electrical outlet. For battery operation, place the slide
7、switch into the “DC” position. Turn the attenuator switch to the cell position. This applies voltage to the cell and is used as a cell check. 4.2 Close valves V-2, V-3 and V-4 (see schematic diagram). Remove caps from bypass and sample flow meters. 4.3 Connect the sampling line of the analyzer to th
8、e sample to be analyzed. 4.4 Open valve V-1 fully. Open valve V-2 sufficiently to purge the sample line liquid phase for 10 to 15 seconds. Close valve V-2. 4.5 Open valve V-5, then open valve V-3 sufficiently to obtain a flow of one-half of full scale on the bypass meter. There should be no reading
9、on the pressure gage or flow through the sample flow meter during this step. Purge the sample through the analyzer in this manner for 10 minutes 4.6 At the conclusion of the 10 minute purge, adjust valves V-3, V-5 and regulator R-1 until the following conditions have been attained: * This method is
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- INTERNCEMSBT382009TESTFORWATERCONTENTINAIRCONDITIONERREFRIGERANT 空调 制冷剂 中水 含量 测定 PDF

链接地址:http://www.mydoc123.com/p-785838.html