HUD 24 CFR PART 55-2011 FLOODPLAIN MANAGEMENT《洪泛平原管理》.pdf
《HUD 24 CFR PART 55-2011 FLOODPLAIN MANAGEMENT《洪泛平原管理》.pdf》由会员分享,可在线阅读,更多相关《HUD 24 CFR PART 55-2011 FLOODPLAIN MANAGEMENT《洪泛平原管理》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、377 Office of the Secretary, HUD 55.1 (2) The Secretary has reviewed the decision and determined that, because of unusual circumstances, the waiting period of at least ten days is not fea-sible. (c) For purposes of computing the waiting period under paragraph (b)(1) of this section, a single point o
2、f con-tact is presumed to have received writ-ten notification 5 days after the date of mailing of such notification. 52.11 What are the Secretarys obliga-tions in interstate situations? (a) The Secretary is responsible for (1) Identifying proposed Federal fi-nancial assistance and direct Federal dev
3、elopment that have an impact on interstate areas; (2) Notifying appropriate officials and entities in states which have adopted a process and which select the Departments program or activity. (3) Making efforts to identify and no-tify the affected state, areawide, re-gional, and local officials and
4、entities in those states that have not adopted a process under the Order or do not se-lect the Departments program or ac-tivity; (4) Responding pursuant to 52.10 of this part if the Secretary receives a recommendation from a designated areawide agency transmitted by a sin-gle point of contact, in ca
5、ses in which review, coordination, and communica-tion with the Department have been delegated. (b) The Secretary uses the procedures in 52.10 if a state process provides a state process recommendation to the Department through a single point of contact. 52.12 Reserved PART 55FLOODPLAIN MANAGEMENT Su
6、bpart AGeneral Sec. 55.1 Purpose and basic responsibility. 55.2 Terminology. 55.3 Assignment of responsibilities. Subpart BApplication of Executive Order on Floodplain Management 55.10 Environmental review procedures under 24 CFR parts 50 and 58. 55.11 Applicability of subpart C decision making proc
7、ess. 55.12 Inapplicability of 24 CFR part 55 to certain categories of proposed actions. Subpart CProcedures for Making Deter-minations on Floodplain Management 55.20 Decision making process. 55.21 Notification of floodplain hazard. 55.22 Conveyance restrictions for the dis-position of multifamily re
8、al property. 55.23 Reserved 55.24 Aggregation. 55.25 Areawide compliance. 55.26 Adoption of another agencys review under the executive orders. 55.27 Documentation. AUTHORITY: 42 U.S.C. 3535(d) and 40014128; E.O. 11988, 42 FR 26951, 3 CFR, 1977 Comp., p. 117. SOURCE: 59 FR 19107, Apr. 21, 1994, unles
9、s otherwise noted. Subpart AGeneral 55.1 Purpose and basic responsi-bility. (a) This part implements the require-ments of Executive Order 11988, Flood-plain Management, and employs the principles of the Unified National Pro-gram for Floodplain Management. It covers the proposed acquisition, con-stru
10、ction, improvement, disposition, fi-nancing and use of properties located in a floodplain for which approval is re-quired either from HUD under any ap-plicable HUD program or from a grant recipient subject to 24 CFR part 58. This part does not prohibit approval of such actions (except for certain ac
11、tions in high hazard areas), but provides a consistent means for implementing the Departments interpretation of the ex-ecutive order in the project approval decision making processes of HUD and of grant recipients subject to 24 CFR part 58. The implementation of Execu-tive Order 11988 under this par
12、t shall be conducted by HUD, for Department-ad-ministered programs subject to envi-ronmental review under 24 CFR part 50, and by authorized recipients of HUD fi-nancial assistance subject to environ-mental review under 24 CFR part 58. (b) Under section 202(a) of the Flood Disaster Protection Act of
13、1973, 42 U.S.C. 4106(a), proposed HUD financial assistance (including mortgage insur-ance) for acquisition or construction VerDate Mar2010 08:31 Apr 29, 2011 Jkt 223077 PO 00000 Frm 00387 Fmt 8010 Sfmt 8010 Y:SGML223077.XXX 223077jdjones on DSK8KYBLC1PROD with CFRProvided by IHSNot for ResaleNo repr
14、oduction or networking permitted without license from IHS-,-,-378 24 CFR Subtitle A (4111 Edition) 55.2 purposes in any area having special flood hazards (a flood zone designated by the Federal Emergency Manage-ment Agency (FEMA) shall not be ap-proved in communities identified by FEMA as eligible f
15、or flood insurance but which are not participating in the National Flood Insurance Program. This prohibition only applies to pro-posed HUD financial assistance in a FEMA-designated area of special flood hazard one year after the community has been formally notified by FEMA of the designation of the
16、affected area. This prohibition is not applicable to HUD financial assistance in the form of formula grants to states, including fi-nancial assistance under the State-ad-ministered CDBG Program (24 CFR part 570, subpart I) and the State-ad-ministered Rental Rehabilitation Pro-gram (24 CFR 511.51), E
17、mergency Shel-ter Grant amounts allocated to States (24 CFR parts 575 and 576), and HOME funds provided to a state under Title II of the Cranston-Gonzalez National Af-fordable Housing Act (42 U.S.C. 12701 12839). (c) Except with respect to actions listed in 55.12(c), no HUD financial as-sistance (in
18、cluding mortgage insur-ance) may be approved after May 23, 1994 with respect to: (1) Any action, other than a function-ally dependent use, located in a floodway; (2) Any critical action located in a coastal high hazard area; or (3) Any non-critical action located in a coastal high hazard area, unles
19、s the action is designed for location in a coastal high hazard area or is a func-tionally dependent use. An action will be considered to be designed for loca-tion in a coastal high hazard area if: (i) In the case of new construction or substantial improvement, the work meets the current standards fo
20、r V zones in FEMA regulations (44 CFR 60.3(e) and, if applicable, the Minimum Property Standards for such construc-tion in 24 CFR 200.926d(c)(4)(iii); or (ii) In the case of existing construc-tion (including any minor improve-ments): (A) The work met FEMA elevation and construction standards for a c
21、oast-al high hazard area (or if such a zone or such standards were not designated, the 100-year floodplain) applicable at the time the original improvements were constructed; or (B) If the original improvements were constructed before FEMA stand-ards for the 100-year floodplain became effective or b
22、efore FEMA designated the location of the action as within the 100-year floodplain, the work would meet at least the earliest FEMA stand-ards for construction in the 100-year floodplain. 55.2 Terminology. (a) With the exception of those terms defined in paragraph (b) of this section, the terms used
23、in this part shall follow the definitions contained in section 6 of Executive Order 11988 and in the Flood-plain Management Guidelines for Im-plementing Executive Order 11988 (43 FR 6030, February 10, 1978) issued by the Water Resources Council; and the terms criteria and Regular Pro-gram, shall fol
24、low the definitions con-tained in FEMA regulations at 44 CFR 59.1. (b) The definitions of the following terms in Executive Order 11988 and re-lated documents affecting this part are modified for purposes of this part: (1) Coastal high hazard area means the area subject to high velocity waters, inclu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- HUD24CFRPART552011FLOODPLAINMANAGEMENT 平原 管理 PDF

链接地址:http://www.mydoc123.com/p-782855.html