1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16994 Double Vision Inspection Procedure For Windshields Copyright 2013 General Motors Company All Rights Reserved December 2013 Page 1 of 4 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of con
2、flict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. This document is the GM Worldwide Glazing Testing Standard. Its purpose is to establish a common test methodology for Glazing Materials to ensure that a high quality world class system is consis
3、tently developed and produced. This standard describes the test method used to inspect for double vision in automotive windshields. This is a living document and any suggestions or revisions will be reviewed and/or updated annually by the Fixed Glass Global Subsystem Leadership Team (GSSLT). 1.2 For
4、eword. This is a component/subsystem test. 1.3 Applicability. This standard is applicable for all passenger vehicles, multipurpose passenger vehicle (MPV), and truck models with heated grid elements in fixed glass and produced by GM worldwide. 2 References Note: Only the latest approved standards ar
5、e applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3600 2.3 Additional References. GM Security Guidelines Subsystem Technical Specifications (SSTS) 3 Resources 3.1 Facilities. 3.1.1 Calibration. The test facilities and equipment s
6、hall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.2 Equipmen
7、t. 3.2.1 A light box consisting of a 25 W light source mounted behind a No. 3480 Corning yellow-red glass or equivalent. 3.2.2 A 12.7 mm diameter light aperture positioned at the front of the light box. Centered on the aperture is a 102 mm diameter circle. 3.2.3 Test shall be performed in a dimly li
8、t room. See Figure 1 for test setup. 3.3 Test Vehicle/Test Piece. Test samples shall be of production intent design and material for design validation (DV); or, production intent design and materials manufactured with production processes (home line) for product validation (PV). Any changes to the c
9、omponents or material, e.g., design, fit, form, function, properties, manufacturing process, and/or location of manufacture require revalidation. GM shall approve Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking per
10、mitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16994 Copyright 2013 General Motors Company All Rights Reserved December 2013 Page 2 of 4 validation methods for product/process changes before the supplier is committed to the change. Refer to GMW3600. 3.4 Test Time. Calendar
11、 time: 1 day Test hours: 8 hours Coordination hours: 4 hours 3.5 Test Required Information. Review GM Security Guidelines. Note: The supplier shall work with the GM Design Responsible Engineer to comprehend this requirement. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. 4.2 Cond
12、itions. All conditions specified shall be targeted toward the specified value with any given tolerance () used to compensate for variation. During testing, conditions specified shall not be readjusted within the tolerance unless it is to maintain the particular test condition within the specified to
13、lerance. If such an adjustment is made, it shall be approved by the appropriate GM engineer prior to the start of any testing. Unless otherwise specified, perform the tests in the as received condition without any special pre-conditioning. 4.2.1 Environmental Conditions. The following conditions app
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW169942013DOUBLEVISIONINSPECTIONPROCEDUREFORWINDSHIELDSISSUE1ENGLISHREPLACEDGMNAGM9628PGMNAGM9628PPDF

链接地址:http://www.mydoc123.com/p-757962.html