GMW GMW16821-2012 Wiper Washer Reservoir Debris Test Procedure Issue 1 English.pdf
《GMW GMW16821-2012 Wiper Washer Reservoir Debris Test Procedure Issue 1 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16821-2012 Wiper Washer Reservoir Debris Test Procedure Issue 1 English.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16821 Wiper Washer Reservoir Debris Test Procedure Copyright 2012 General Motors Company All Rights Reserved December 2012 Originating Department: North American Engineering Standards Page 1 of 7 1 Scope Note: Nothing in this standard supercedes app
2、licable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. The purpose of this test is to evaluate the performance of the Washer Reservoir with debris. This procedure is a Subsystem level test. 1.2
3、Foreword. This document is intended to test performance requirements of a Wiper Washer Reservoir under environmental conditions. This document is the GM Worldwide Washer System Testing Standard for Washer Reservoir Debris. Its purpose is to establish a common test methodology for washer systems to e
4、nsure that a high quality world class system is consistently developed and produced. This is a living document and any suggestions or revisions will be reviewed and/or updated annually by the Windshield Wiper Global Subsystem Leadership Team (GSSLT). The washer system is used to store and apply a wa
5、shing agent to the target area on the outside of the windscreen and back lite of vehicles. If used correctly, no washing agent shall escape and no hoses shall become detached from the screen washer. The washer reservoir also referred to for convenience as the reservoir, is the part of the washer sys
6、tem which is used to store the washer fluid. 1.3 Applicability. This procedure is applicable for all car, multipurpose passenger vehicle (MPV), and truck models produced by GM. The following reservoirs are used: Reservoir for windshield washer systems Reservoir for headlamp washer systems Reservoir
7、for windshield and backlight systems Reservoir for backlight systems Reservoir for windshield washer systems and headlamp washer systems The following pumps are used: Devices with one pressure outlet (Mono pump) Devices with two pressure outlets (Dual pump) 2 References Note: Only the latest approve
8、d standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. 9985670 GMW3600 GMW16387 2.3 Additional References. 9274023 Isopropanol GM1829 Analysis/Development/Validation Plan and Report Copyright General Motors Company Provided
9、 by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16821 Copyright 2012 General Motors Company All Rights Reserved December 2012 Page 2 of 7 3 Resources 3.1 Facilities. The test fac
10、ilities shall be accredited to ISO/IEC standards or by the International Laboratory Accreditation Cooperation. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.1.1 Calibration. The test facilities and equipment
11、shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as stated in this specification shall be determined correctly with respect to their physical definition. 3.2 Equip
12、ment. 3.2.1 Play Sand from Home Improvement Stores. Fine sand with a particle size of between 1 mm and 63 m with the majority falling in the 355 m to 125 m range. If the preferred sand is not available, test sand can be prepared by using appropriate screens to sort dust/sand particles to the require
13、d sizes to Table 1 below. Table 1: Dust/Sand Composition Particle Size Percent (%) by Volume 2% 1 mm 5 500 um 10 400 um 15 300 um 25 200 um 25 100 um 10 60 um 10 3.2.2 Washer Reservoirs. Program specific. 3.2.3 Vibration Table. Standard table capable of 50 mm (2 in) displacement and 1 Hz. 3.2.4 Ther
14、mal Chamber. Large enough to contain fully assembled washer systems and capable of -40 C to 120 C with controlled humidity. 3.2.5 Electrical power supply device that reflects vehicle electrical interface, e.g., mating connector, wire gage, control box, etc. 3.2.6 Graduated cylinder with 1 mL increme
15、nts to measuring cylinder content. 3.2.7 Test Nozzle See Appendix A, Figure A1 for performing pump test with reproducible measurements of pump parameters. Production level nozzles can be used for system durability. 3.3 Test Vehicle/Test Piece. Test samples shall be of production intent design and ma
16、terial for design validation (DV); or, production intent design and materials manufactured with production processes (home line) for product validation (PV). Any changes to the components or material, e.g., design, fit, form, function, properties, manufacturing process, and/or location of manufactur
17、e require revalidation. GM shall approve validation methods for product/process changes before the supplier is committed to the change. Refer to GMW3600 3.4 Test Time. Calendar time: 2 days Test hours: 6 hours Coordination hours: 3 hours Copyright General Motors Company Provided by IHS under license
18、 with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16821 Copyright 2012 General Motors Company All Rights Reserved December 2012 Page 3 of 7 3.5 Test Required Information. Requirements from the Subsyste
19、m Technical Specification (SSTS) or respective specification are necessary in order to execute test methods in this procedure. Equipment and test sample detail is included in Section 4 of this standard. 3.6 Personnel/Skills. The test facility shall have sufficient personnel having the necessary educ
20、ation, training, technical knowledge, and experience for performing the required tests. 4 Procedure 4.1 Preparation. This test procedure has been developed to reflect customer usage of markets which have more stable road systems and fewer unpaved and rough roads. Other regional or local requirements
21、 may necessitate additional test options. For further information, consult the regional Engineering Centers i.e., GM North America, GM Europe, GM Brazil, GM Holden, and GM Korea, etc. 4.2 Conditions. All conditions specified shall be targeted toward the specified value with any given tolerance () us
22、ed to compensate for variation. During testing, conditions specified shall not be readjusted within the tolerance unless it is to maintain the particular test condition within the specified tolerance. If such an adjustment is made, it shall be approved by the appropriate GM engineer prior to the sta
23、rt of any testing. Unless otherwise specified, perform the tests in the as received condition without any special pre-conditioning. 4.2.1 Environmental Conditions. Symbol definitions required for test methods contained in this procedure are listed in Table 2. Actual requirement values for the symbol
24、s shall be obtained from the SSTS or the respective specification and recorded on Datasheet A1. If not otherwise specified, tests shall be performed at TROOM. If various temperature ranges for the tests are specified, the procedure shall be constructed, if not otherwise specified, in a way that all
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW168212012WIPERWASHERRESERVOIRDEBRISTESTPROCEDUREISSUE1ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757881.html