GMW GMW16671-2011 Air Induction Subsystem Filtered Air Leakage with Aging Issue 1 English《进气口子系统过滤的漏气和老化 第1次出版(英文版本)》.pdf
《GMW GMW16671-2011 Air Induction Subsystem Filtered Air Leakage with Aging Issue 1 English《进气口子系统过滤的漏气和老化 第1次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16671-2011 Air Induction Subsystem Filtered Air Leakage with Aging Issue 1 English《进气口子系统过滤的漏气和老化 第1次出版(英文版本)》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16671 Air Induction Subsystem Filtered Air Leakage with Aging Copyright 2011 General Motors Company All Rights Reserved October 2011 Originating Department: North American Engineering Standards Page 1 of 5 1 Scope Note: Nothing in this standard supe
2、rcedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. To identify any leaks in the filtered air side of the air induction system. 1.2 Foreword. Not applicable. 1.3 Applicability. All
3、vehicles. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. None 2.3 Additional References. None. 3 Resources 3.1 Facilities. Must be able to maintain an ambient room temperatu
4、re of 21 C 5 C. 3.2 Equipment. 3.2.1 Environmental chamber capable of temperatures from -40 C to 110 C 2 C continuous. Note: Chamber must be large enough to house the clean air duct and air cleaner assembly. 3.2.2 Vacuum source capable of maintaining a 15 kPa static vacuum at 0.55 g/second flow rate
5、. 3.2.3 Flow meter capable of measuring airflow rates from 0.01 g/second to 2.0 g/second with 0.01 g/second resolution. 3.2.4 Barometer to measure room conditions. 3.2.5 Thermometer to measure room conditions. 3.2.6 Relative Humidity Indicator to measure room conditions. 3.2.7 Solid plug/plate to re
6、present the throttle body/turbo compressor inlet at minimum dimensions. Plug/plate shall have a nipple to connect a vacuum source. 3.2.8 Solid plug/plate to represent the inlet air duct connection to the air cleaner. 3.3 Test Vehicle/Test Piece. Not applicable. 3.4 Test Time. Calendar time: 6 days (
7、range) Test hours: 100 hours (range) Coordination hours: 5 hours Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16671 Copyright 2011 General Motors Company All Rights Reserved October 2011 Page 2 of 5 3.5 Test R
8、equired Information. Minimum torque specifications for fasteners attaching the air cleaner cover to housing. Minimum torque specifications for any clamps used in the assembly. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. 4.1.1 Attach clean air duct to air cleaner assembly. 4.1.
9、2 Install plug/nipple assembly into the throttle body/turbo inlet end of the clean air duct. 4.1.3 Torque the clamp screws on the clean air duct to the minimum torque specification. 4.1.4 Remove air inlet duct if necessary. 4.1.5 Install and seal the plug into inlet of air cleaner. Plug/seal any dra
10、in holes. 4.1.6 Torque the threaded fasteners used to hold the air cleaner cover to housing to the minimum torque specification. 4.1.7 Attach any additional hoses to air cleaner or clean air duct where ports are provided (Positive Crankcase Ventilation (PCV), Secondary Air Injection (SAI), etc.) and
11、 plug/seal the open ends. 4.2 Conditions. 4.2.1 Environmental Conditions. Record barometer, temperature and relative humidity. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certif
12、icates, reports, etc. 4.3 Instructions. 4.3.1 Attach vacuum source to nipple on plug. 4.3.2 At room ambient, apply a VAC kPa vacuum 0.1 kPa and measure the leak rate. Note: VAC kPa vacuum is the air induction system static flow restriction at maximum air flow rate +5.0 kPa. Reference the Air Inducti
13、on program specific Subsystem Technical Specification (SSTS). 4.3.3 Install air cleaner/duct assembly into environmental chamber in the as installed in vehicle position, raise temperature to 110 C 2 C and maintain for 100 hours. 4.3.4 While assembly is still in the chamber and heated to 110 C 2 C, a
14、pply VAC kPa vacuum 0.1 kPa and measure leak rate. 4.3.5 Lower temperature to -40 C 2 C at an appropriate rate. Maintain parts at this temperature for two (2) hours. 4.3.6 Apply VAC kPa vacuum 0.1 kPa and measure leak rate. Do not disassemble. Verify that there is no permanent damage to the parts. 4
15、.3.7 If leak rate exceeds requirement, then raise temperature to -28 2 C at an appropriate rate. Maintain parts at this temperature for two (2) hours. 4.3.8 Apply VAC kPa vacuum 0.1 kPa and measure leak rate. 4.3.9 Remove assembly from chamber and let cool to ambient. Once parts have reached room am
16、bient, maintain parts at ambient for two (2) hours. 4.3.10 Apply VAC kPa vacuum 0.1 kPa and measure leak rate. 4.3.11 Simulate servicing the air filter. Remove air filter assembly from air cleaner, then reinstall. 4.3.12 Torque the threaded fasteners used to hold the air cleaner cover to housing to
17、the minimum torque specification. 4.3.13 Apply VAC kPa vacuum 0.1 kPa and measure leak rate. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16671 Copyright 2011 General Motors Company All Rights Reserved October
18、 2011 Page 3 of 5 5 Data 5.1 Calculations. Flow rates should be corrected to standard conditions: Barometer = 101.3 kPa Temperature = 21 C Leak rate = standard grams/second 5.2 Interpretation of Results. Refer to program specific SSTS. Data for the leak rates: Ambient 100 hour/110 C soak -40 C soak
19、-28 C soak (if needed) Ambient soak Ambient soak after filter service 5.3 Test Documentation. An engineering report should be generated following completion of this procedure. Include the completed data sheet found in Appendix A. 6 Safety This standard may involve hazardous materials, operations, an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW166712011AIRINDUCTIONSUBSYSTEMFILTEREDAIRLEAKAGEWITHAGINGISSUE1ENGLISH 进气口 子系统 过滤 漏气 老化 出版 英文 版本

链接地址:http://www.mydoc123.com/p-757830.html