1、 WORLDWIDE ENGINEERING STANDARDS Material Specification GMW15625 Adhesive Application Approval Requirements Copyright 2011 General Motors Company All Rights Reserved June 2011 Originating Department: North American Engineering Standards Page 1 of 7 1 Scope 1.1 Material Description. This specificatio
2、n describes the process and requirements for obtaining GM Adhesive Application Approval (AAA) for components or assemblies that contain adhesive bonds, structural and non-structural. 1.2 Symbols. Not applicable. 1.3 Typical Applications. Adhesive materials include; thermosetting polymeric liquids an
3、d pastes, pressure sensitive films and tapes, hot-melts, and solvent/water based contact cements. 1.3.1 Applicability. Not all bonding applications will require approval. Only those applications that list this specification on the drawing requirements shall require approval. 1.4 Remarks. AAA is requ
4、ired for Production Part Approval Process (PPAP) in accordance with the latest revision level of this standard. 1.5 Approvals are specific to the substrate/adhesive combination and to the facility where the adhesive application is performed. 2 References Note: Only the latest approved standards are
5、applicable unless otherwise specified. 2.1 External Standards/Specifications. ISO/IEC 17025 ISO/TS 16949 2.2 GM Standards/Specifications. GMW3041 GMW15671 GMW3059 GMW15921 GMW3221 GMW16016 GMW14874 GMW16183 GMW14892 GMW16195 GMW15200 GMW16232 2.3 Additional References. TMC003 Material Safety Data Sh
6、eet guidance documents (available at ). 3 Requirements 3.1 Testing Requirements. Perform AAA testing as indicated in Table A1. 3.1.1 For AAA testing, all testing shall be performed in a laboratory accredited to ISO/IEC 17025. Laboratories meeting the requirements of ISO/TS 16949 can be used with the
7、 consent of GM Materials Engineering. 3.1.2 All testing is the responsibility of the GM supplier that supplies a component containing an adhesive application. 3.1.3 Final AAA will be based on the results of testing performed on production parts for each combination of substrate, adhesive and manufac
8、turing location. Tests may be performed on surrogate parts or plaques, only when approved in advance by GM Materials Engineering. 3.1.4 All samples for testing shall be obtained from parts that have been created using production intent materials and processes at the part/component build locations th
9、at will be used for manufacturing production Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15625 Copyright 2011 General Motors Company
10、All Rights Reserved June 2011 Page 2 of 7 parts. For some plastic substrate materials, if regrind is allowed, all specimens for testing must be obtained from production parts that are made from the maximum allowable regrind as stated on the drawing. 3.1.5 All materials used in the bond joint includi
11、ng substrates, paint, coatings, adhesion promoters and adhesives shall have been qualified and approved to the appropriate GM specifications. 3.1.6 All cure/activation schedules are to be those of the production system and must agree with the adhesive manufacturers recommendations. 3.1.7 Test Review
12、. When testing is completed, the tested components will be reviewed by the responsible GM Materials Engineer. 3.1.8 Test Conditions. Tests shall be conducted using the latest issue of the test methods indicated in Table A1. Suitable precautions should be taken to ensure that applicable safe limits a
13、re not exceeded when conducting test procedures, processes and/or handling the materials required by this specification. 3.2 Requirements on Test Specimens. Reference GMW3221. 3.2.1 Sample Conditioning. Unless otherwise specified, bonded samples shall be subjected to testing after a minimum aging pe
14、riod of 72 h following the curing/activation cycle. A shorter aging period may be used with approval of the appropriate GM Engineer. 3.2.2 Safety. This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated wi
15、th its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 3.2.3 All tested samples shall be retained by the supplier for review by the appropriate GM Materials Enginee
16、r at least until AAA is obtained. 3.3 Changes in Processing. 3.3.1 Notification. It is the sole responsibility of the supplier to provide the customer, unsolicited, with documentation of any change or modification to the product/process, and to apply for a new AAA release using the form in Table A3.
17、 3.3.2 Process Changes. After the initial AAA has been established, any change in processing parameters as recorded on the Adhesive Bonding Process Data Sheet (Table A2), requires evaluation with the responsible GM Materials Engineer. 3.3.3 Revalidation. If not otherwise agreed to, the entire AAA pr
18、ocess shall be repeated and documented by the supplier prior to the start of delivery of the modified or changed product. In some cases, a shorter test protocol can be agreed to between the responsible GM department, GM Materials Engineer and the supplier. 3.4 Test Results. Test reports shall be wri
19、tten per the Requirements for Test Report in ISO/IEC 17025. A checklist of all documents required for AAA is provided in Table A4. 3.5 Deviations from this Standard. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawi
20、ngs, test certificates, reports, etc. 4 Manufacturing Process Not applicable. 5 Rules and Regulations 5.1 Legal Regulations. All materials must satisfy applicable laws, rules, regulations and recommendations valid in the country of usage. 5.2 Language. In the event of conflict between the English an
21、d domestic language, the English language shall take precedence. 5.3 Inspection and Rejection. Samples of components or materials released to a GM material specification shall be tested for conformity with the requirements of this material specification and approved by the responsible Engineering de
22、partment prior to commencement of delivery of bulk supplies. A new approval must be received for any changes, e.g., properties, manufacturing process, location of manufacture, etc. If not otherwise agreed, all testing and documentation normally required for initial release must be completed. Copyrig
23、ht General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15625 Copyright 2011 General Motors Company All Rights Reserved June 2011 Page 3 of 7 It is the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW156252011ADHESIVEAPPLICATIONAPPROVALREQUIREMENTSISSUE2ENGLISH 粘合 批准 要求 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757677.html