GMW GMW15010-2012 Global Supplier Serviceability Requirements Issue 3 English《国际供应商的可服务性要求 第3次出版(英文版本)》.pdf
《GMW GMW15010-2012 Global Supplier Serviceability Requirements Issue 3 English《国际供应商的可服务性要求 第3次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW15010-2012 Global Supplier Serviceability Requirements Issue 3 English《国际供应商的可服务性要求 第3次出版(英文版本)》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW15010 Global Supplier Serviceability Requirements Copyright 2012 General Motors Company All Rights Reserved May 2012 Originating Department: North American Engineering Standards Page 1 of 16 1 Introduction Note: Nothing in this standard super
2、cedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Scope. This document describes the deliverables that shall be provided by suppliers, for the product to be supplied, to support service par
3、t releases, service and parts information development, service diagnostics development, and owner information development. A description of the required form and format of the deliverables is provided in Sections 3.4 through 3.13 of this document. This document takes effect at the time of Supplier s
4、election and continues as described in 1.1.1 of this document. The Supplier must provide service parts, in a form directed by Buyers service part release personnel, which allow the economical service and repair of customers vehicles in terms of costs of replacement parts and labor time. In accordanc
5、e with GMs General Terms and Conditions, the Seller understands and agrees that the Sellers written acceptance or commencement of any work or services under the contract shall constitute Sellers acceptance of these terms and conditions only. 1.1.1 Life of Service and Service Part Support. The Suppli
6、er shall continue to provide Service and Service part support following completion of GM vehicle production which utilizes the product to be supplied as specified in the General Motors contract “General Terms and Conditions” unless otherwise specified in the Request for Quote (RFQ). 1.2 Mission/Them
7、e. Not applicable. 1.3 Classification. Not applicable. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3059 GMW16331 GMW14375 GMW16592 2.3 Additional References. Global De
8、sign InfoBOOK GM Common Circuit Query and Request Application Process (located at http:/ GM1804 - Supplier Cost Eng. Piece Cost Breakdown Worksheet (available at ) GM1825 - Supplier Technology Information (available at ) Service Packaging Standards and Guidelines (available at ) Statement of Require
9、ments (SOR) Appendix J2 - Supplier Serviceability Requirements - Exceptions (Commodity Specific) TMC003 Material Safety Data Sheet guidance documents (available at ) Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking
10、permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15010 Copyright 2012 General Motors Company All Rights Reserved May 2012 Page 2 of 16 3 Requirements 3.1 Order of Precedence. The respective terms and conditions of Buyers RFQ and Contract or Purchase Order are intended to
11、be cumulative to and consistent with the provisions of the Statement of Requirements (SOR). However, if there is any conflict among such terms and conditions, the following order of precedence applies: First: RFQ and Contract or Purchase Order terms and conditions. Second: SOR and Appendices/Attachm
12、ents/GM Standards. Third: Other Provisions, Specifications, or Documents (if any). 3.2 Service Deliverable Support. The Supplier shall provide support and information, as detailed in subsequent sections, to aid in the development of the GM service deliverables including but not limited to: Service P
13、arts Determination and Release Service Manual (including electrical/mechanical diagnostics) Diagnostic Scan Tool Service Programming System (SPS) Vehicle Owners Manual Service Parts Catalog Training Bulletins Campaigns The Supplier shall provide one primary contact, which can support serviceability
14、activities and service and parts deliverables immediately after the Original Equipment (OE) contract has been signed. 3.2.1 Service Deliverables Timing. New product information is required at the time described in Table 1 in 7.6 of this document. There may be other specific requirements for Service
15、Deliverables included in Appendix J2 of the SOR. 3.2.2 Standard of Service for Revised Product Information. Interim changes are required 16 weeks prior to production build date. Note: The Supplier shall provide the specified deliverables, according to timing provided by Buyers service and parts pers
16、onnel, without a request from Buyers service and parts personnel. 3.3 Compliance with Technical Specifications. The Supplier shall assure that the product to be supplied is in compliance with GM Serviceability requirements, which include, but are not limited to those specified in the Subsystem Techn
17、ical Specifications (SSTS), Component Technical Specifications (CTS), and Appendix J2. 3.4 Documentation. Including instructions, specifications and/or calibrations shall, to the extent possible, be provided in standard word processing software, such as Microsoft Word. The information, instructions,
18、 specifications and/or calibrations must be provided in the English language unless otherwise indicated in Appendix J2 of the SOR. Artwork shall, to the extent possible, be provided as a .jpg file or other similar electronic file format. The Supplier shall ensure that all service deliverable content
19、 is accurate and complete, and provided in accordance with specified timing schedules. 3.4.1 Instruction Sheets, Templates, and Tags. When developed by the Supplier, these items shall be approved for content by Buyers service and parts personnel. The Supplier shall ensure that the approved instructi
20、on sheet, template or tag is translated into languages required for the region where the part is to be sold. The specific language requirements will be supplied by the regional Buyer or the regional Buyers service and parts personnel. EXAMPLE: The instruction sheet, template, or tag supplied with th
21、e part(s) for the North American market will consist of all language versions (English, Canadian French, and Latin American Spanish). 3.5 Service Parts Information. Production and service part numbers shall be the same if the production and service part is physically, and functionally, identical. Se
22、parate service part numbers shall not be assigned for non-part characteristics such as packaging or corrosion prevention, unless directed to do so by Buyers service and parts personnel. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reprodu
23、ction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15010 Copyright 2012 General Motors Company All Rights Reserved May 2012 Page 3 of 16 3.5.1 The Supplier shall provide the deliverables referenced in Sections 3.6 thru 3.13 to aid Buyers service and part
24、s personnel. The Supplier deliverables include, but are not limited to: Design related information Hardware/Software Specifications Math Data/Drawings, per GM standards Assembly Exploded View Drawings Service Recommendations Complete Bill of Materials (BOM) for all of the Suppliers parts intended fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW150102012GLOBALSUPPLIERSERVICEABILITYREQUIREMENTSISSUE3ENGLISH 国际 供应商 服务性 要求 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757595.html