GMW GMW14449-2011 Testing the Force Fit of Exhaust Pipe Clamped Connections Issue 2 English《排气管夹紧的连接的压入配合的试验 第2次出版(英文版本)》.pdf
《GMW GMW14449-2011 Testing the Force Fit of Exhaust Pipe Clamped Connections Issue 2 English《排气管夹紧的连接的压入配合的试验 第2次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW14449-2011 Testing the Force Fit of Exhaust Pipe Clamped Connections Issue 2 English《排气管夹紧的连接的压入配合的试验 第2次出版(英文版本)》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW14449 Testing the Force Fit of Exhaust Pipe Clamped Connections Copyright 2011 General Motors Company All Rights Reserved July 2011 Originating Department: GME Specification Center Page 1 of 4 1 Scope Note: Nothing in this standard supercedes applic
2、able laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. Determining the force fit of exhaust system pipe connections in laboratory test. 1.2 Foreword. Not applicable. 1.3 Applicability. For all exha
3、ust system pipe connections which are connected by means of a clamp. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW15261 3 Resources 3.1 Facilities. Not applicable. 3.2
4、Equipment. 3.2.1 Heating oven to condition the pipe connection to +600 C for 1 h. 3.2.2 Torsion testing device. 3.2.2.1 Data acquisition (X-Y recorder). 3.2.2.2 Torque load cell with a measuring range of (10 to 500) Nm. 3.2.2.3 Torque angle gauge with a measuring range of (0 to 90). 3.2.2.4 Leak mea
5、suring equipment according to GMW15261. 3.3 Test Vehicle/Test Piece. The test shall be performed on 5 new 300 mm long pipe sections manufactured under production conditions, the dimensions of which are the upper tolerance range, according to the drawing specifications. The surface properties of the
6、pipe sections shall correspond to the series production parts, as per the part drawing for the pipe. 3.4 Test Time. Calendar time: 1 weeks Test hours: 40 hours Coordination hours: 2 hours 3.5 Test Required Information. Not applicable. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation
7、. See paragraph 4.3. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW14449 Copyright 2011 General Motors Company All Rights Reserved July
8、 2011 Page 2 of 4 4.2 Conditions. 4.2.1 Environmental Conditions. Not applicable. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. 4.3.1
9、 Pairing the Pipe Sections. To pair the pipe sections, the 300 mm long sections of insert and push-on pipes shall be measured in the connection area. The outer lower (minimum) and upper (maximum) diameters of the insert pipe shall be determined. The inner lower (minimum) and upper (maximum) diameter
10、s of the push-on pipe shall be determined. The measured values shall be documented in Table 1. To pair the pipe sections, the tolerances of the insert and push-on pipes (column I in Table 1) shall be in the upper range. Table 1: Pipe Pairing Report Pipe wall thickness: Pipe material: Surface conditi
11、on: Pipe manufacturer A B C D E F G H I Insert Pipe Outer Diameter in mm Push-On Pipe Inner Diameter in mm Part no. min max Average value Part no. min max Average value Tolerance Nominalmin Note 1Nominalmax Note 1 Nominalmin Note 1 Nominalmax Note 1 Test no. of pipe - column A, E measured pipe diame
12、ter - column B, C, F, G column D = (B + C)/2 column H = (F + G)/2 column I = H D Note 1: Nominal value in accordance with CTS/part drawing 4.3.2 Mounting the Pipes. When mounting the pipes, which shall be performed according to the part drawing, the following shall be noted: a. the depth to which th
13、e insert pipe is inserted into the push-on pipe, b. the positioning of the clamp on the push-on pipe and c. the bolt tightening torque (Ma) of the clamp screw connection. 4.3.3 Measuring the Leakage Rate of the Pipe Connection. Determining the leakage rate of the pipe connection according to GMW1526
14、1. Determining the leakage rate shall be performed following paragraph 4.3.2. The permissible leakage rate can be taken from the SSTS/CTS/part drawing. The measured leakage rates shall be documented in Table 2. Copyright General Motors Company Provided by IHS under license with General Motors Compan
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW144492011TESTINGTHEFORCEFITOFEXHAUSTPIPECLAMPEDCONNECTIONSISSUE2ENGLISH 排气管 夹紧 连接 配合 试验 出版 英文 版本

链接地址:http://www.mydoc123.com/p-757493.html