GMKOREA EDS-T-7530-2011 Test Method of Plastic Tank.pdf
《GMKOREA EDS-T-7530-2011 Test Method of Plastic Tank.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-7530-2011 Test Method of Plastic Tank.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING STANDARDS General Specification SUPERCEDED EDS-T-7530 Test Method of Plastic Tank This standard may be applied only for current projects. It is Superceded for all future projects and replaced by GMW3086. F(3D% 8:8 7$*B%A 7 $4F 4G - Note: 8 E:48t G8 =97 FF7 957%L+ , FG P-P Program .Bd# G
2、MW3086 8p) $4=F7 957F$ . Copyright 2011 General Motors Company All Rights Reserved November 2011 Originating Department: GM Korea Engineering Standards Page 1 of 11 Version : 4 1 Introduction Note: Nothing in this standard supersedes applicable laws and regulations. Note: In the event of conflict be
3、tween the Korean and English language, the Korean language shall take precedence. 1.1 Purpose. This standard is to define the general requirements for plastic fuel tank. 1.2 Scope. This standard is applied only to gasoline all the models of sedan and van. 2 References Note: Only the latest approved
4、standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. ECE R34 2.2 GM Standards/Specifications. EDS-T-7511 GMW3059 2.3 Additional References. None 3 Test Preparation and Evaluation 3.1 Resources. 3.1.1 Calibration. The test facilities and equipment shall be in go
5、od working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.1.3 Test Piece. 3.1.3.1
6、 A finished product or a part of it must be chosen as a test piece. Unless otherwise specified, the number of test pieces is three or more for approval test and one or more for quality review and import inspection. 1 P7 :0 : ., E:48 6&F !7$ :4-8! 9I8x $4=F 3L 6$ . :0 : F67t 7568 18 88x 7 , F6* 72T8p
7、) F$ . 1.1 +95 . ., 4G E:48t F(3D% 8:8 7$*B%A 7 $4F 8-L958 7 98x 9IF$ . 1.2 957 -88 . ., E:48t d2*8x 17F# 37= -C 3F= 98 =97 FF7 957F$ . 2 4) E:4 / :0 : C-H +d%P 9I8 6# F 48 07 38%P E:48x 957F$ . 2.1 17 E:4 / . ECE R34 2.2 GM E:4 / . EDS-T-7511 GMW3059 2.3 dA E:4 / . None 3 4G :4/x -C D4 3.1 4G 88 .
8、3.1.1 9I . 4G 2X/x7t 8/x# 9P 2e#8x -PHLF 8TGF 9I Fx:8x J66 F$ . 3.1.2 $4= 3L$ . $4= 4G 42X0 8/x4 17%T 3L 8$ . ,) ! ., E:47 +d%P +& ?U9I -3L&8t , ,p*95 9I87 8 9IGF 9I%L66 F$ . 3.1.3 4G D . 3.1.3.1 7x9PE D# F .8x 4G D8p) 17F%L , $+8! 2l. 4G 97 C-H 9I%L6 8: 6# F , 384G 8t 3P , E:B -C 3L81# 1P 818p) F$
9、. GM KOREA ENGINEERING STANDARDS EDS-T-7530 Copyright 2011 General Motors Company All Rights Reserved November 2011 Page 2 of 11 Version : 4 3.1.3.2 The test piece supplier must gain the prior (initial) approval of the Technical Center under test as to whether the piece matches up to the specificati
10、ons that are required. 3.1.3.3 If a test piece is approved, its structure and manufacturing process cannot be changed without the permission or consent of the Technical Center. If changed, it must be re-approved by the Center. 3.2 Conditions. 3.2.1 Pre-Conditioning. Unless otherwise specified, the t
11、est pieces must be placed under pre-conditioning at a temperature of (232) E and a relative humidity of (505)% for 48 hours or more. 3.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test
12、certificates, reports, etc. 3.3 Safety. This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and healt
13、h practices and determine the applicability of regulatory limitations prior to use. 3.4 Documentation. Samples of components or material released to this standard shall be tested for conformity with the requirements of this standard and approved by the responsible GM Department prior to the start of
14、 delivery of production level components or materials. Any change to the component or material, e.g., design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide the customer, unsol
15、icited, with documentation of any change or modification to the product/process, and to apply for a new release. If not otherwise agreed to, the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product. In some cases, a s
16、horter test can be agreed to between the responsible GM department and the supplier. 4 Requirements and Procedure 4.1 Impact Resistance Test. 4.1.1 Test Method. 4.1.1.1 Fill solution of a mixture of 60% ethylene glycol and 40% water into the fuel tank up to the nominal volume and leave the tank belo
17、w (-40) E for 24 hours. Then, perform an impact test on the tank using a pendulum impact tester. 3.1.3.2 9PE8x )=Fd 98 )=8# d3T 7$ 2).Bd ., 8 7 ?* +9F# :8 7 .7 $4F7 4G 8x 38 -O6x6 F$ . 3.1.3.3 %P .E8! 8*8 4G D8t ., E:47 9I%P 4G 8x 7 98x +94P6 F+ , 61 )= 987 GM :04 .2P8 388x -O6x6 F$ . .E8! 8*7 862P
18、&H88 , d# , 22e , 9P9 )9I ,* /D# 21:7t 4)%P 6&F -8($ -P2%T 7 49PE 4* 7F$ . )=8# +88 7= 7 .7t 14 68 9PE /21 )9I 18 - Gm8t P97 4F 2P* 9P)F6 F+ 4 9PE 4 4=8x F6 F$ . $* F84 6# F , )=8# P9 Gm8t -%P 9PE8 )= 987 98= : 4G 8x -L.) 3LFF 0* ,l2PGF6 F$ . 8. 77 86 GM :04 .2P7t )=888 F87 8F $%P : 4G 8x 44F 3L 8$
19、. 4 7 9 -C 4G 9 4G . 4.1.1 4G - . 4.1.1.1 7D,)4*0 ,p8 GpF76 (7D,)4* : ,p = 60 : 40, vol %)8x )?7(: =x7 7$*B%A * (-40) E8 7$ F72P 24 48 % 6| -?F G , D&)0 4G d* 87F7 7$*B%A 7 8x 4F$ . GM KOREA ENGINEERING STANDARDS EDS-T-7530 Copyright 2011 General Motors Company All Rights Reserved November 2011 Page
20、 3 of 11 Version : 4 4.1.1.2 The pendulum impact tester must be fabricated according to the specifications below (See Figure 1). y Impact Hammer (in a pyramid shape) mass: 15 kg. y Pendulum Length: 1 m. y Impact Energy: 3.1 Kgfm. 4.1.1.3 The impact point must be specified in the drawings. 4.1.2 Requ
21、irement. No crack must be found so that the solution can leak out. 4.2 Fuel Permeability Test. 4.2.1 Test Method. 4.2.1.1 Fill unleaded (smokeless) gasoline into the tank up to half the nominal volume and then keep the tank at a temperature 40 E for 4 weeks with all the holes and passages unblocked.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST75302011TESTMETHODOFPLASTICTANKPDF

链接地址:http://www.mydoc123.com/p-757307.html