GMKOREA EDS-T-5208-2008 UNSCREENED HIGH-TENSION IGNITION CABLES.pdf
《GMKOREA EDS-T-5208-2008 UNSCREENED HIGH-TENSION IGNITION CABLES.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5208-2008 UNSCREENED HIGH-TENSION IGNITION CABLES.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards UNSCREENED HIGH-TENSION IGNITION CABLES Do Not Use on New Programs. Being Replaced by GMW3172 EDS-T-5208 ISSUED DATE: 1992. 03. 04 REVISED DATE: 2008. 10. 27 VERSION: 3 (Superceded) EDS-T-5208UNSCREENED HIGH-TENSION I
2、GNITION CABLES PAGE: 1/13 ISSUED DATE: 1992. 03. 04 REVISED DATE: 2009. 10. 27 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T255 Program). It is Superceded for all future projects and replaced by GMW3172 1. PURPOSE This test specification
3、specifies the dimensions, general and special requirements and the test method for unscreened high-tension ignition cables. 2. NUMBER OF TEST SAMPLES A conduct composed of at least twenty 5m high-tension ignition cables. 3. APPARATUS 3.1. Test instruments shall correspond to the specified DIN-standa
4、rd. 3.2. Ohmmeter(accuracy class 1.5), for measuring the resistance to conduction 3.3. Micrometer, for measuring diameters and wall thicknesses. 3.4. Trigger mechanism or machine, with which to pull plugs from instruments or from cables at a speed of 100 mm/min. Measuring range of force: up to 200N
5、3.5. Wire coiled filament, of +1mm in inner diameter like that of the cable, approx. 3mm in slope, and 1.5mm in wire diameter. It is used to examine defective portions. 3.6. High voltage source: 12KV40KV (50Hz60Hz) 3.7. High-voltage measuring instrument (accuracy class 2.0): 0KV40KV 3.8. Glass test
6、tube, for carrying out tests in salt water, tap water, oil and fuel. 3.9. Chamber (for low and high temperature), for temperature tests. 3.9.1. Height of interior: min. 500mm 3.9.2. Range of temperature: -50+250 3.9.3. Permissible temperature deviation: 2.5K at a temperature over 0, 3K at a temperat
7、ure under 0 3.10. Microscope, for measuring depth of indentation. EDS-T-5208UNSCREENED HIGH-TENSION IGNITION CABLES PAGE: 2/13 ISSUED DATE: 1992. 03. 04 REVISED DATE: 2009. 10. 27 VERSION: 3 GM DAEWOO Auto & Technology 3.11. Rotary spindle ( 35 mm), for ozon resistance test. 3.12. Tank, capable of c
8、ontaining bearing lead balls of 3mm in diameter( ) fully. 3.12.1. Length: 220 mm 3.12.2. Width: 110 mm 3.12.3. Depth: 80 mm 4. DIMENSIONS OF IGNITION CABLES 4.1. Finished cables shall have outside diameters as follows. 4.1.1. 80.3 mm 4.1.2. 70.3 mm 4.1.3. 50.3 mm 4.2. As for required diameters, sele
9、ct from clause 4.1 appropriately. 5. TEST PROCEDURE 5.1. Insulation failure test 5.1.1. Principle Grounded dry ignition cables (or, cladding that covering corresponds to cathode) shall not show dielectric breakdown when voltage is applied to the coil wire(anode). 5.1.2. Apparatus Coil wire, of +1 mm
10、 in inside diameter equal to that of the cable, approx. 3mm in coiled width, and 1.5 mm in wire diameter. 5.1.3. Test voltage For 8 mm ignition cable: 30KV (50Hz60Hz) For 7 mm ignition cable: 25KV (50Hz60Hz) For 5 mm ignition cable: 20KV (50Hz60Hz) 5.1.4. Test period Application for at least 1 secon
11、d is required for each portion of the cable. 5.2. Thirty-minute-test voltage and dielectric breakdown test (see Fig 1, Appendix Table #2) 5.2.1. Length of test sample EDS-T-5208UNSCREENED HIGH-TENSION IGNITION CABLES PAGE: 3/13 ISSUED DATE: 1992. 03. 04 REVISED DATE: 2009. 10. 27 VERSION: 3 GM DAEWO
12、O Auto & Technology Ignition cable of approx. 1200 mm 5.2.2. Test procedure Immerse the ignition cable into the salt water of 3% for 4h with both ends exposed to the air of 235 When applying voltage according to clause 5.2.3 for 30 min between the solution and the ignition cable, dielectric breakdow
13、n shall not occur. While the voltage is raised at the rate of 500V/sec until reaching the specified values(5.2.4), dielectric breakdown shall not occurs, either. 5.2.3. Test voltage (applied for 30 minute) For 8 mm ignition cable: 20KV (50Hz60Hz) For 7 mm ignition cable: 20KV (50Hz60Hz) For 5 mm ign
14、ition cable: 15KV (50Hz60Hz) 5.2.4. Test voltage (for dielectric breakdown) For 8 mm ignition cable: Approx. 40KV (50Hz60Hz) For 7 mm ignition cable: Approx. 35KV (50Hz60Hz) For 5 mm ignition cable: Approx. 25KV (50Hz60Hz) 5.3. Capacity test 5.3.1. Length of test sample Ignition cable of approx. 120
15、0 mm 5.3.2. Test procedure Immerse the ignition cable into 3% salt water of +702 for 24h. Here, the both ends shall be projected from the water by approx. 100 mm. Measure the capacity between the conductor and the tank of salt water. Then immerse the ignition cable into the tap water of 232 for 1h w
16、ith the both ends exposed to the air by approx. 100mm. Measure capacity between the conductor and the tank of tap water. (Capacity shall not exceed the values specified in Appendix Table #1) 5.3.3. Measuring frequency 1000 Hz 5.4. Resistance test under corona discharge (see Fig 2, Appendix Table #2)
17、 5.4.1. Length of test sample Ignition cable of approx. 1200 mm 5.4.2. Test procedure Fasten one of the sample ends to the rotary spindle of 25 mm and apply load of 2.5 kg to the other end. Wind the sample 5 turns around the spindle and fasten it so that the both ends of the cable stands off freely
18、19 mm. Cover the top with a metal sleeve and apply voltage according to clause 5.4.3. After 8 hours of test, any change or defective like ruptures and cracks shall not appear on the sample. EDS-T-5208UNSCREENED HIGH-TENSION IGNITION CABLES PAGE: 4/13 ISSUED DATE: 1992. 03. 04 REVISED DATE: 2009. 10.
19、 27 VERSION: 3 GM DAEWOO Auto & Technology 5.4.3. Test voltage For 8 mm ignition cable: 20KV (50Hz60Hz) For 7 mm ignition cable: 20KV (50Hz60Hz) For 5 mm ignition cable: 15KV (50Hz60Hz) 5.5. Pressure test at high temperature (see Fig 3. Appendix Table #2) 5.5.1. Length of test sample Ignition cable
20、of approx. 100 mm 5.5.2. Test procedure Mount the sample on the apparatus and put it into the naturally-ventilated hot oven at a temperature specified in Appendix Table #1 for 4h and at a load specified in clause 5.5.3. Then dismantle the sample from the apparatus and cool it in the cooling water wi
21、thin 10 sec. Inspect the dented point in the horizontal or vertical section with a microscope. This dented point shall not occupy more than 50%. It is related to the mean value of the covering thicknesses of test samples at a point that is apart from the pressurized area to some degree when dividing
22、 the sample into 6 parts. 5.5.3. Test load For 8 mm ignition cable: 510g (including the weight of assembly table) For 7 mm ignition cable: 450g (including the weight of assembly table) For 5 mm ignition cable: 312g (including the weight of assembly table) 5.6. Thermic overload test 5.6.1. Length of
23、test sample Ignition cable of approx. 500 mm 5.6.2. Test procedure Suspend the sample vertically in a naturally-ventilated hot oven and leave it at the temperature specified in Appendix Table #1 for 48h. After then cool the sample at 235 and wind the sample both clockwise and counterclockwise 4 turn
24、s each around the cylindrical spindle of 12.5 mm in diameter while applying a load of 4.5Kg. Here, cracks shall not occur. 5.7. Thermal contraction test 5.7.1. Length of test sample Ignition cable of approx. 200 mm 5.7.2. Test procedure Measure the length of the sample precisely at 235 prior to the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST52082008UNSCREENEDHIGHTENSIONIGNITIONCABLESPDF

链接地址:http://www.mydoc123.com/p-757111.html