GMKOREA EDS-T-2604-2010 Power Steering Hose Performance Test Procedure (Version 4 English Korean This standard may be applied only for current project (incl 200 Series) It is Super G.pdf
《GMKOREA EDS-T-2604-2010 Power Steering Hose Performance Test Procedure (Version 4 English Korean This standard may be applied only for current project (incl 200 Series) It is Super G.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-2604-2010 Power Steering Hose Performance Test Procedure (Version 4 English Korean This standard may be applied only for current project (incl 200 Series) It is Super G.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 GMDAT ENGINEERING STANDARDS General Specification Chassis SUPERCEDED EDS-T-2604 Power Steering Hose Performance Test Procedure This standard may be applied only for current project (incl. 200 Series). It is Superceded for all future projects and replaced by GMW14600, GMW15348 and GMW15422. D76 3D$6
2、* Gl38 2e# 4G 98 88x 7 , F6* 72T8p) F$ . 1.1 +95 . ., E:48t 37=7 D8 3D$6* Gl38 2e# 4G 907 38%P E:48x 957F$ . 2.1 17 E:4 / . ISO1402 BS 5173 2.2 GM E:4 / . F$-1F 68 . 3 4G 8? 3.1 +# 8* 4G d . 3.2 8T6 4*$ . 3.3 6)Y . 3.4 948 7d . 3.5 6)Y =$ -l/ . 3.6 /$)O (Accuracy: 0.05cm3). 3.7 X - Y d) . GMDAT ENGI
3、NEERING STANDARDS EDS-T-2604 Copyright 2010 General Motors All Company Rights Reserved November 2010 Page 2 of 5 Version : 4 4 Sample Preparations 4.1 Number of Samples. At least 3 for approval test and at least 1 for regular quality check test. 4.2 Conditions. Samples shall be tested at least 7 day
4、s after manufacturing for approval test, and 3 days for regular quality check. Before test, samples shall be exposed to 23 E 5K for over 8 hours under no-load conditions. 5 Test Method Test shall be conducted at 23 E 5K except specified otherwise in the drawing. 5.1 Tensile Force Test. 5.1.1 Mount t
5、he sample including end fitting on the U.T.M without torsion. 5.1.2 While testing at 50mm/min., record the force-displacement diagram. 5.2 Burst Pressure Test. 5.2.1 Mount the sample on the test equipment without torsion and tension. 5.2.2 Fill the sample with test liquid and remove air bubble. 5.2.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST26042010POWERSTEERINGHOSEPERFORMANCETESTPROCEDUREVERSION4ENGLISHKOREANTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROJECTINCL200SERIESITISSUPERGPDF

链接地址:http://www.mydoc123.com/p-756971.html