GME GMI L-8A-8-2000 Side Impact 20 mph 90 Degree - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301) (English German).pdf
《GME GMI L-8A-8-2000 Side Impact 20 mph 90 Degree - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301) (English German).pdf》由会员分享,可在线阅读,更多相关《GME GMI L-8A-8-2000 Side Impact 20 mph 90 Degree - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301) (English German).pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、STDoOPEL GMI L-BA-8-ENGL 2000 8597118 0030008 5T9 File name: 75004- Prepared: DM Test Procedure GMHA GMB HEC ISUZU SAAE TDCE HO Side Impact, 20 mph, 90“ - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301) Seitenaufprall, 20 mph, 90“ - fahrbare starre Barriere (Integritt des Kraftsto
2、ffsystems nach MVSS 301) Approved J. Barboza GM do Brasil Approved Saab Approved S. Maeda ISUZU Approved Holdens Automotive Approved M. Stephens Holdens Engine Company Approved v. Cott TDCE Approved W. T. Fletcher Delta Motor STD=OPEL GMI L-BA-8-ENGL 2000 R 8577LLB 0030007 435 = I GM INTERNATIONAL E
3、NGINEERING STANDARD GMI L-8A-8 I Revisions nderungen Date Paragraph Datum Abschnitt 08.96 new 08.96 neu TDCE Release TEZ - Freigabe 02.00 Released for GMB, HEC, Isuzu, ITDCE and Delta 02.00 Freigegeben fr GMB, HEC, Isuzu, ITDCE und Delta February 2000 Page 2 of 8 LECP GMI 2 11/95 STD=OPEL GMI L-BA-8
4、-ENGL 2000 II 8597118 0030010 157 = GM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-8 1 Introduction 1.1 Purpose Investigation of the fuel system integrity in a side impact. 1.2 Foreword The idea of the test is to avoid fuel leakage in side impact accidents. All values mentioned in this test procedur
5、e were valid at the date of issue. For the actual values refer to the newest edition of the regulation mentioned in paragraph 1.5.2. 1.3 Applicability This test procedure applies to passenger cars, mul- tipurpose passenger cars, trucks and buses with a GWVR I 10000 Ib. (= 4536 kg) and use fuel with
6、a boiling point above 32F (= 0%). It serves for prod- uct validation with reference to vehicle safety. i .4 Definitions MRB Moving rigid barrier. For further definitions refer to the regulation men- tioned in paragraph 1.5.2. 1.5 References 1.5.1 Order of Precedence This test is essentially based up
7、on the regulation mentioned in 1.5.2, in this test procedure referred to in short as “standard“. In the event of a conflict between the text of the test procedure and the documents cited herein, the text of the test procedure takes precedence. Nothing in the test procedure, however, supersedes appli
8、cable laws and regulations unless a specific exemption has been obtained. Remark: In the event of a conflict between the Eng- lish and the domestic language, the English lan- guage shall take precedence. I Einleitung 1.1 Zweck berprfung der Integritt des Kraftstoffsystems bei einem Seitenaufprall. I
9、 .2 vonnfort Hintergrund des Tests ist, bei Unfllen mit Seiten- aufprall den Austritt von Kraftstoff zu vermeiden. Alle in diesem Prfverfahren angegebenen Werte gelten zum Zeitpunkt der Erstellung. Die aktuellen Werte sind der neuesten Ausgabe der in Abschnitt 1.5.2 genannten Regelung zu entnehmen.
10、1.3 Anwendbarkeit Das vorliegende Prfverfahren gilt fr Pkw, Mehr- Zweck-Pkw, Lkw und Busse mit einem zul. Gesamt- gewicht I4536 kg (= 10000 lb.), die mit Kraftstoff betrieben werden, der einen Siedepunkt ber 0C (= 32F) hat. Es dient der Produktvalidierung in Bezug auf Fahrzeugsicherheit. 1.4 Definit
11、ionen FSB Fahrbare starre Barriere. Weitere Definitionen siehe Richtlinie in Abschnitt 1.5.2. 1.5 Referenzen 1.5.1 Rangfolge der Dokumente Grundlage dieser Prfung bildet im wesentlichen die unter 1.5.2 aufgefhrte Regelung, in diesem Prf- verfahren vereinfachend “Richtlinie“ genannt. Im Falle eines W
12、iderspruchs vom Text dieses Prf- Verfahrens und den Dokumenten, die in dem Prf- verfahren enthalten sind, hat der Text des Prfver- fahrens Vorrang. Falls keine Ausnahmen vereinbart wurden, darf das Prfverfahren keine anzuwenden- den Gesetze und Regelungen auer Kraft setzen. Hinweis: Im Falle von Uns
13、timmigkeiten zwischen dem englischen und dem landessprachlichen Text, ist der englische Text ausschlaggebend. February 2000 Page 3 of 8 LBSP GMI 2 11/95 STD=OPEL GMI L-BA-8-ENGL 2000 8597LLB 0030011 O93 GM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-8 1.5.2 Government Documents 1.5.2.1 Legal Documen
14、ts 1.5.2.1 .I Regional N.a. 1.5.2.1.2 National MVSS 301 (USA) Fuel System Integrity 1.5.2.2 Standards N.a. 1.5.3 General Motors Documents 1.5.3.1 GMIO Static Rollover Test 1.5.3.2 NAO Fuel System Integrity GMI L-8A-6 GMUTS R1-8A-301G 1.5.4 Industry Documents N.a. 1.5.5 Supplier Documents N.a. 1.5.6
15、Other Documents Specific facilities, equipment and test descriptions from the various GMIO partners. 2 Resources The conditions for a correct realization of the test are defined in the above-mentioned standard and its appendices. The described test installation or a demonstrably comparable one has t
16、o be used. The facilities and equipment listed below guarantee a test conduction in accordance with the require- ments stated in the standard and allow an evalua- tion exceeding the requirements pursuant to the actual state of the art. They are not rule and may be different with respect to the vario
17、us GMIO partners. 1.5.2 Staatliche Dokumente 1.5.2.1 Gesetzliche Dokumente 1.5.2.1 .I Regionale N.a. 1.5.2.1.2 Nationale MVSS 301 (USA) Fuel System Integrity 1.5.2.2 Normen N.a. 1.5.3 General Motors Dokumente 1.5.3.1 GMIO Statischer Rol lover-Test 1.5.3.2 NAO Fuel System Integrity GMI L-8A-6 GMUTS R
18、1-8A-301G 1.5.4 Industrie Dokumente N.a. 1.5.5 Lieferanten Dokumente N.a. 1.5.6 Andere Dokumente Spezifische Anlagen-, Ausrstungs- und Testbe- Schreibungen der einzelnen GM10-Partner. 2 Gerte und Einrichtungen Die Voraussetzungen, die zur korrekten Durchfh- rung dieser Prfung erfllt werden mssen, si
19、nd in der obengenannten Richtlinie und deren Anhngen definiert. Es ist der dort beschriebene oder ein nachweislich gleichwertiger Versuchsaufbau einzu- setzen. Die nachfolgend aufgefhrten Einrichtungen und Ausrstungen gewhrleisten eine Testdurchfhrung gem den Forderungen in der Richtlinie und erlau-
20、 ben eine umfassendere Versuchsauswertung ent- sprechend dem aktuellen Stand der Technik. Sie sind nicht Vorschrift und knnen je nach GMIO- Partner unterschiedlich sein. February 2000 Page 4 of 8 LBSP GMI 2 11/95 STD-OPEL GMI L-OA-A-ENGL 2000 8577118 0030012 TZT W GM INTERNATIONAL ENGINEERING STANDA
21、RD GMI L-8A-8 2.1 Facilities Crash-test facility to conduct moving barrier im- pacts. 2.2 Equipment 2.2.1 Moving rigid barrier (MRB). 2.2.2 Dummy (Type Hybrid II or Hybrid ill). 2.2.3 Electronic instrumentation and equipment to record and process the sensor data. 2.2.4 Computer system and software t
22、o evaluate and save the data. 2.2.5 High speed cameras to take film shots. 2.2.6 Lighting equipment to take film shots. 2.2.7 Film evaluation equipment. 2.2.8 Extractor facility for airbag inflating gas as required. 2.3 Test VehiclelTest Piece Fully equipped vehicle incl. dummy. 2.1 Einrichtung Cras
23、hanlage zur Durchfhrung von Aufprallversu- chen mit einer fahrbaren Barriere. 2.2 Ausrstung 2.2.1 Fahrbare starre Barriere (FSB). 2.2.2 Dummy (Typ Hybrid II oder Hybrid ill). 2.2.3 Metechnik zur Erfassung und Weiterverarbeitung der Sensordaten. 2.2.4 Computeranlage und Software zur Auswertung und Si
24、cherung der Daten. 2.2.5 Hochgeschwindigkeitskameras zur Filmaufnahme. 2.2.6 Beleuchtungsanlage zur Filmaufnahme. 2.2.7 Anlage zur Filmauswertung. 2.2.8 Absauganlage fr Airbagfllgas nach Bedarf. 2.3 VersuchsfahrzeuglProbekrper Komplett ausgestattetes Fahrzeug inkl. Dummy. February 2000 Page 5 of 8 L
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMEGMIL8A82000SIDEIMPACT20MPH90DEGREEMOVINGRIGIDBARRIERFUELSYSTEMINTEGRITYACCORDINGTOMVSS301ENGLISHGERMANPDF

链接地址:http://www.mydoc123.com/p-755485.html