GME GMI L-8A-11-2007 Rear Impact - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301 GS 37) (English German This standard may be applied only for current projects ifor.pdf
《GME GMI L-8A-11-2007 Rear Impact - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301 GS 37) (English German This standard may be applied only for current projects ifor.pdf》由会员分享,可在线阅读,更多相关《GME GMI L-8A-11-2007 Rear Impact - Moving Rigid Barrier (Fuel System Integrity According to MVSS 301 GS 37) (English German This standard may be applied only for current projects ifor.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONALENGINEERINGSTANDARDSTest Procedure GMI L-8A-11Rear Impact - Moving Rigid Barrier(Fuel System Integrity According to MVSS 301, GS 37)Heckaufprall - fahrbare starre Barriere(Integritt des Kraftstoffsystems nach MVSS 301, GS 37)May 2007 Page 1 of 8Note: This standard may be applied only fo
2、r current projects incl. Global Epsilon (37#). It isSuperceded for all future projects and replaced by GMW14533.Hinweis: Diese Spezifikation darf nur noch fr laufende Projekte einschlielich Global Epsilon (37#) angewendet werden und ist fr alle zuknftigen Projekte ungltig und ersetzt durchGMW14533.G
3、M INTERNATIONAL ENGINEERING STANDARD GMI L-8A-11May 2007 Page 2 of 8LBSP GMI 2 11/95RevisionsDate Paragraphnew02.95 TDCE releasenderungenDatum Abschnittneu02.95 TEZE Freigabereworked, new layout12.96 TDCE releaseberarbeitet, neues Layout12.96 TEZE Freigabe02.00 Released for GMB, HEC, Isuzu,ITDCE and
4、 Delta02.00 Freigegeben fr GMB, HEC, Isuzu,ITDCE und Delta05.08 set to Superseded 05.08 Status auf “Superseded” gesetztGM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-11May 2007 Page 3 of 8LBSP GMI 2 11/951 Introduction 1 Einleitung1.1 PurposeInvestigation of the fuel system integrity of motorvehicle
5、s in a rear impact.1.1 Zweckberprfung der Unversehrtheit des Kraftstoff-systems bei einem Heckaufprall.1.2 ForewordThe idea of the test is to avoid fuel leakagefollowing rear impact accidents.1.2 VorwortHintergrund des Tests ist, den Austritt von Kraftstoffnach Unfllen mit Heckaufprall zu vermeiden.
6、1.3 ApplicabilityThis test procedure applies to passenger cars,multipurpose passenger cars, trucks and buses witha GVWR 10000 lb. ( 4536 kg) and use fuel witha boiling point above 32F (= 0C). The testprocedure serves for product validation with refer-ence to vehicle safety.All values mentioned in th
7、is test procedure werevalid at the date of issue. For the actual valuesrefer to the newest editions of the standards men-tioned in paragraph 1.5.2.1.3 AnwendbarkeitDie vorliegende Prfverfahren gilt fr Pkw, Mehr-zweck-Pkw, Lkw und Busse mit einem zul. Gesamt-gewicht 10000 lb. ( 4536 kg), die mit Kraf
8、tstoffbetrieben werden, der einen Siedepunkt ber 32F(= 0C) hat. Das Prfverfahren dient der Produkt-validierung in Bezug auf Fahrzeugsicherheit.Alle in diesem Prfverfahren angegebenen Wertegelten zum Zeitpunkt der Erstellung. Die aktuellenWerte sind den neuesten Ausgaben der in Ab-schnitt 1.5.2 genan
9、nten Regelungen zu entnehmen.1.4 DefinitionsMRB: Moving rigid barrier.Further definitions see standards.1.4 DefinitionenFSB: Fahrbare starre Barriere.Weitere Definitionen siehe Richtlinien.1.5 References 1.5 Referenzen1.5.1 Order of PrecedenceThis test is essentially based upon the regulationsmentio
10、ned in 1.5.2, in this test procedure referredto in short as “standards“.In the event of a conflict between the text of thetest procedure and the documents cited herein, thetext of the test procedure takes precedence.Nothing in the test procedure, however, supersedesapplicable laws and regulations un
11、less a specificexemption has been obtained.Remark: In the event of a conflict between theEnglish and the domestic language, the Englishlanguage shall take precedence.1.5.1 Rangfolge der DokumenteGrundlage dieser Prfung bilden im wesentlichendie unter 1.5.2 aufgefhrten Regelungen, in diesemPrfverfahr
12、en vereinfachend “Richtlinien“ genannt.Im Falle eines Widerspruchs vom Text dieses Prf-verfahrens und den Dokumenten, die in dem Prf-verfahren enthalten sind, hat der Text des Prfver-fahrens Vorrang. Falls keine Ausnahmen vereinbartwurden, darf das Prfverfahren keine anzuwenden-den Gesetze und Regel
13、ungen auer Kraft setzen.Hinweis: Im Falle von Unstimmigkeiten zwischendem englischen und dem landessprachlichen Text,ist der englische Text ausschlaggebend.GM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-11May 2007 Page 4 of 8LBSP GMI 2 11/951.5.2 Government Documents 1.5.2 Staatliche Dokumente1.5.2.
14、1 Legal Documents 1.5.2.1 Gesetzliche DokumenteMVSS 301 (USA)Fuel System IntegrityGS 37 (Gulf States)Moving Barrier Rear ImpactMVSS 301 (USA)Fuel System IntegrityGS 37 (Golfstaaten)Moving Barrier Rear Impact1.5.2.2 Standards 1.5.2.2 NormenN.a. N.a.1.5.3 General Motors Documents 1.5.3 General Motors
15、Dokumente1.5.3.1 GMIO 1.5.3.1 GMIOGMI L-8A-6Static Rollover TestGMI L-8A-6Statischer Rollover-Test1.5.3.2 NAO 1.5.3.2 NAOGMUTS R1-8A-301GFuel System IntegrityCPPO-8A-1-82 (GM inhouse requirement)GMUTS R1-8A-301GFuel System IntegrityCPPO-8A-1-82 (GM Inhouse-Anforderung)1.5.4 Industry Documents 1.5.4
16、Industrie DokumenteN.a. N.a.1.5.5 Supplier Documents 1.5.5 Lieferanten DokumenteN.a. N.a.1.5.6 Other Documents 1.5.6 Andere DokumenteSpecific facilities, equipment and test descriptionsfrom the various GMIO partners.Spezifische Anlagen-, Ausrstungs- und Testbe-schreibungen der einzelnen GMIO-Partner
17、.2 Resources 2 Gerte und EinrichtungenThe conditions for a correct realization of the testare defined in the above mentioned standards andits appendices. The described test installation or ademonstrably comparable one has to be used.Die Voraussetzungen, die zur korrekten Durchfh-rung dieser Prfung e
18、rfllt werden mssen, sind inden obengenannten Richtlinien und deren Anhn-gen definiert. Es ist der dort beschriebene oder einnachweislich gleichwertiger Versuchsaufbau einzu-setzen.The facilities and equipment listed below guaranteea test conduction in accordance with the require-ments in the standar
19、d and allow an evaluationexceeding the requirements pursuant to the actualstate of the art. They are not rule and may bedifferent with respect to the various GMIO partnersDie nachfolgend aufgefhrten Einrichtungen undAusrstungen gewhrleisten eine Testdurchfhrunggem den Forderungen in der Richtlinie u
20、nd er-lauben eine umfassender Versuchsauswertung ent-sprechend dem aktuellen Stand der Technik. Siesind nicht Vorschrift und knnen je nach GMIO-Partner unterschiedlich sein.GM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-11May 2007 Page 5 of 8LBSP GMI 2 11/952.1 FacilitiesCrash test facility to condu
21、ct moving barrierimpacts.2.1 EinrichtungCrashanlage zur Durchfhrung von Aufprallversu-chen mit einer fahrbaren Barriere.2.2 Equipment2.2.1Moving rigid barrier (MRB).2.2.2Dummies (Type Hybrid II or Hybrid III).2.2.3Electronic instrumentation and equipment to recordand process the sensor data.2.2.4Com
22、puter system and software to evaluate andsave the data.2.2.5High speed cameras to take film shots.2.2.6Lighting equipment to take film shots.2.2.7Film evaluation equipment.2.2.8Extractor facility for airbag inflating gas as required.2.2 Ausrstung2.2.1Fahrbare starre Barriere (FSB).2.2.2Dummies (Typ
23、Hybrid II oder Hybrid III).2.2.3Metechnik zur Erfassung und Weiterverarbeitungder Sensordaten.2.2.4Computeranlage und Software zur Auswertung undSicherung der Daten.2.2.5Hochgeschwindigkeitskameras zur Filmaufnahme.2.2.6Beleuchtungsanlage zur Filmaufnahme.2.2.7Anlage zur Filmauswertung.2.2.8Absaugan
24、lage fr Airbagfllgas nach Bedarf.2.3 Test Vehicle/Test PieceFully equipped vehicle incl. dummies.2.3 Versuchsfahrzeug/ProbekrperKomplett ausgestattetes Fahrzeug inkl. Dummies.GM INTERNATIONAL ENGINEERING STANDARD GMI L-8A-11May 2007 Page 6 of 8LBSP GMI 2 11/953 Procedure 3 Durchfhrung3.1 Preparation
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMEGMIL8A112007REARIMPACTMOVINGRIGIDBARRIERFUELSYSTEMINTEGRITYACCORDINGTOMVSS301GS37ENGLISHGERMANTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROJECTSIFORPDF

链接地址:http://www.mydoc123.com/p-755484.html