GME 8713-2007 Fuel Tank Capacity and Fill Performance.pdf
《GME 8713-2007 Fuel Tank Capacity and Fill Performance.pdf》由会员分享,可在线阅读,更多相关《GME 8713-2007 Fuel Tank Capacity and Fill Performance.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Test ProcedureRoad GME8713Fuel Tank Capacity and Fill PerformanceNote: This specification may be applied only for current projects incl. Global Epsilon (37#). It isSuperceded for all future projects and replaced by GMW14508 and GMW15198.1 IntroductionNote: Nothinginthisstandardsupersedesapplicablela
2、ws and regulations.Note: In the event of a conflict between the Germanand theEnglish language,the German language shalltake precedence.1.1 Purpose. The purpose of this specification is:to determine Tank Capacity Evaluationto evaluate Fill Behavior1.2 Foreword. Not applicable.1.3 Applicability. Gasol
3、ine and diesel passengercars.1.4 Definitions.Static Unusable Capacity: Volume of remainingfuel in tank after the fuel pump has drained all thatit is able to drain. Fuel system is in design (curbmass) position for level ground and not moving (seeGME8712).Specified Fuel Capacity: The amount of fuel th
4、atcan be filled into the tank (including fill hose (+25.45) C fuel in tank (1/3filled)c +50 C delivered fuel (first (4.10) l), then +30 Cdelivered fuel3.3.4.2 Winter Gasoline.a (0.+10) C delivered fuelb +10 C delivered fuel; (+5.+25) C fuel in tank (1/3filled)3.3.4.3 Summer Diesel.a (+10.+30) C deli
5、vered fuelb +30 C delivered fuel; (+25.+60) C fuel in tank(1/3 filled)3.3.4.4 Winter Diesel.a (0.+20) C delivered fuelb +5 C delivered fuel; (+5.+40) C fuel in tank (1/3filled)c +20 C delivered fuel3.3.5 First Fill.a +20 C delivered fuel3.3.6 Failed Shut Off Nozzle.a +20 C delivered fuel; +20 C fuel
6、 in tankFill Parameter Tolerances:Reid Vapor Pressure: 2.5 kPaFill Rate: 1 lTemperature: 1 C3.4 Test Time. Not applicable.3.5 Test Required Information. Not applicable.3.6 Personnel / Skills. Not applicable.4 Procedure4.1 Preparation. Not applicable.4.2 Conditions.4.2.1 Environmental Conditions. See
7、 relevant testaccording to paragraph 4.3.4.2.2 Test Conditions. Deviations from the require-ments of the test procedures shall have been agreedupon. Such requirements shall be specified on com-ponent drawings, test certificates, reports etc.4.3 Instructions.4.3.1 General Evaluation.4.3.1.1 For Tank
8、Capacity Evaluation the test shallbe performed at “6 oclock nozzle position” with flowrates defined in SSTS and temperatures defined inparagraph 3.3.4. Vehicle on a flat surface and underinclination of 6 % (left-, right-, front-, rear up).4.3.1.2 Customer Usable Fuel System Capacity isreached after
9、step e), with a flow-rate of 38 l/min at anambient temperature and fuel temperature of +20 Con a flat surface and at “6 oclock nozzle position”.4.3.1.3 ForFillBehaviorEvaluationthetestshallbeperformed at “4, 6 and 8 oclock nozzle position” (oras close to this in case of design limitations) with flow
10、rates defined in SSTS and temperatures defined inparagraph 3.3.4. Vehicle on a flat surface and underinclination of 6 % (left -, right -, front -, rear up).Overfill Prevention Rate: after last fill step (asdescribed above) continue filling until the fuel levelis up to the filler cup. The fuel shall
11、be kept 30 s atthis level by filling very slowly.a Drain the tank.b Insert nozzle (handle down) as far as possible.c Engage filler nozzle on fast fill rate. Wait for auto-matic shutoff.d Wait 10 s, engage nozzle on fast fill rate. Fuelnozzle still inserted as far as possible. Wait untilautomatic shu
12、toff occurs.e Wait 5 s, pull out nozzle one step. Engage nozzleon slow fill rate and wait for automatic shutoff.f Wait 5 s. Engage nozzle on slow fill rate and waitfor automatic shut off. Repeat step f three moretimes.g Repeat a to f lift up and hold the nozzle into thehand.4.3.2 First Fill. Step c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME87132007FUELTANKCAPACITYANDFILLPERFORMANCEPDF

链接地址:http://www.mydoc123.com/p-754983.html