GME 12527 PART 1-2011 Headlamp Washer Systems Part 1 High Pressure Pump (Revision 5 English German Includes Appendix A This standard may be applied only for current programs It is .pdf
《GME 12527 PART 1-2011 Headlamp Washer Systems Part 1 High Pressure Pump (Revision 5 English German Includes Appendix A This standard may be applied only for current programs It is .pdf》由会员分享,可在线阅读,更多相关《GME 12527 PART 1-2011 Headlamp Washer Systems Part 1 High Pressure Pump (Revision 5 English German Includes Appendix A This standard may be applied only for current programs It is .pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、GeneralSpecification SUPERCEDEDGME 12527 Part 1Headlamp Washer Systems ScheinwerferreinigungsanlagenPart 1: High Pressure PumpNOTE: This standard may be applied only forcurrent programs. It is inactive for all futureprojects and replaced by GMW16619.Teil 1: HochdruckpumpeHINWEIS: Diese Spezifikation
2、 darf nur noch frlaufende Projekte angewendet werden und istfr alle zuknftigen Projekte ungltig und ersetztdurch GMW16619.1 Introduction 1 Einfhrung1.1 Scope. High pressure pumps for vehicle head-lamp washer systems.1.1 Anwendungsbereich. Im Fahrzeug zum Ein-satzkommendeHochdruckpumpenfrScheinwerfer
3、-reinigungsanlagen.1.2 Mission / Theme. This specification stipulatesthe requirements, the general test conditions and thetest methods for operational- and material tests, andthe durability test for high pressure pumps for head-lamp washer systems, in the following referred to as“pump“.1.2 Aufgabe /
4、 Thema. Diese Spezifikation legt dieAnforderungen, die Prfbedingungen und Prfver-fahren fr die Funktions- und Werkstoffprfungenund die Dauerprfung fr die im Fahrzeug zumEinsatz kommenden Hochdruckpumpen fr Schein-werferreinigungsanlagen, im folgenden kurz “Pumpe“genannt, fest.Inadditiontothe require
5、mentsofthisspecificationthepump shall fulfill the lawful requirements of the coun-tries in which it is used when assembled to a highpressure headlamp washer system.Zustzlich zu den Anforderungen dieser Spezifika-tion muss die Pumpe im Zsb. mit einer Hochdruck-Scheinwerferreinigungsanlage auch die ge
6、setzlichenForderungen der Lnder erfllen, in denen sie einge-setzt wird.1.3 Classification. Not applicable. 1.3 Einteilung. Nicht anwendbar.Note: Nothing in the specification supersedes appli-cable laws and regulations.Hinweis: Die Vorschrift darf keine anzuwendendenGesetze und Regelungen auer Kraft
7、setzen.Note: In the event of a conflict between the Englishand the domestic language, the English languageshall take precedence.Hinweis: Im Falle von Unstimmigkeiten zwischendem englischen und dem landessprachlichen Text istder englische Text ausschlaggebend.2 References 2 ReferenzenNote: Only the l
8、atest approved standards are appli-cable unless otherwise specified.Hinweis: Wenn nicht anders angegeben, ist jeweilsdieneueste Fassung derangegebenenReferenz gl-tig.2.1 External Standards/Specifications. 2.1 Externe Normen/Vorschriften.DIN 400509 EN 10204 ECE-R45 SAE 30201 VDA 260 Copyright 2011 Ge
9、neral Motors Company All Rights ReservedPublication Department: GME Specification CenterDecember 2011 Page 1 of 18PRD045 - VPRE ST 1 10/03 SUPERCEDED GME 12527 Part 1 GM EUROPE ENGINEERING STANDARDS2.2 GM Standards/Specifications. 2.2 GM Normen/Vorschriften.GME3191GME 60202GME 60251GMI 60206GMW3059G
10、MW3091GMW3097GMW3103GMW3172ON 1397ON 1397.13 Test Preparation and Evaluation 3 Prfungsvorbereitung undAuswertung3.1 Resources. 3.1 Gerte und Einrichtungen.3.1.1 Calibration. The test facilities and equipmentshall be in good working order and shall have a validcalibration label.3.1.1 Kalibrierung. Al
11、lePrfeinrichtungenund -aus-rstungen mssen funktionsfhig sein und eine gl-tige Kalibrierplakette haben.3.1.2 Alternatives. Alternative test facilities andequipment may also be used. However, all measur-ing variables as specified in this specification shallbe determined correctly with respect to its p
12、hysicaldefinition.3.1.2 Alternativen. EsknnenauchalternativePrf-einrichtungen und -ausrstungen verwendet werden.Alle Messvariablen, wie sie in dieser Vorschrift ange-geben werden, mssen jedoch in Bezug auf ihre phy-sikalische Definition korrekt festgelegt werden.3.1.3 Facilities. 3.1.3 Einrichtungen
13、.3.1.3.1 As required by the indicated test methods,test specifications and DIN-standards etc.3.1.3.1 Entsprechend den angegebenen GME-Prf-verfahren, Prfvorschriften, DIN-Normen usw.3.1.3.2 Recirculating air temperature cabinet with airextraction system, explosion proof.3.1.3.2 Temperaturschrank fr U
14、mluftbetrieb mitAbsaugung, explosionsgeschtzt.Test space: suitable size Prfraum: geeignete GrePassages: 2 passages, diameter | 100 mm Durchfhrungen: 2 Durchfhrungen, Durchmesser| 100 mmTemperature range: (-40.+100) C, continuouslyadjustableTemperaturbereich: (-40.+100) C, kontinuierlicheinstellbarPe
15、rmissible temperature deviation: 3 C Zulssige Temperaturabweichung: 3 C3.1.3.3 Electromagnetic oscillation table with controlunit for oscillation test.3.1.3.3 Elektromagnetischer Schwingtisch mitSteuereinheit zur Schwingungsprfung.3.1.3.4 Durability Test Equipments. Suitable testequipment for proced
16、ure of durability test, which con-sists of counter and time switch. The durability testequipment is a device used to operate the pump forthe total number of durability test cycles according topreset operating and break times. Upon completionof the specified number of cycles, the durability testequip
17、ment shall shut off automatically.3.1.3.4 Dauerprfeinrichtung. Geeignete Prf-einrichtung zur Durchfhrung der Dauerprfung,bestehend aus Zhleinrichtung und Zeitschalter.Die Dauerprfeinrichtung ist ein Gert, mit demdie Pumpe nach vorher eingestellten Betriebs- undPausenzeiten ber die gesamte Zahl der Z
18、yklen derDauerprfung betrieben wird. Die Dauerprfeinrich-tung soll nach Erreichen einer vorgegebenen Anzahlvon Zyklen selbstttig abschalten knnen.3.1.4 Equipment. 3.1.4 Ausrstung.3.1.4.1 Asrequiredbythe indicatedtestmethodsandspecifications.3.1.4.1 Entsprechend den angegebenen Prfverfah-ren und Vors
19、chriften. Copyright 2011 General Motors Company All Rights ReservedPage 2 of 18 December 2011PRD045 - VPRE ST G 10/03GM EUROPE ENGINEERING STANDARDS SUPERCEDED GME 12527 Part 13.1.4.2 Devices for attachment and mounting of thepumps to be tested.3.1.4.2 Vorrichtungen zur Aufnahme und Montageder zu pr
20、fenden Pumpen.3.1.4.3 Voltage stabilizer 15 V / 100 A, voltage andcurrent adjustable.3.1.4.3 Spannungskonstanthalter 15 V / 100 A,Spannung und Strom regelbar.3.1.4.4 Voltmeter for measuring range (0.20) Vdirect current voltage, class of accuracy 0.5 or better.3.1.4.4 SpannungsmesserfrMessbereich(0.2
21、0)VGleichspannung, Genauigkeitsklasse 0.5 oder bes-ser.3.1.4.5 Ammeter for measuring range (0.20) Adirect current, class of accuracy 0.5 or better.3.1.4.5 Strommesser fr Messbereich (0.20) AGleichstrom, Genauigkeitsklasse 0.5 oder besser.3.1.4.6 Digital displayed overpressure measuringinstrument wit
22、h analog output (printer- and recorderoutput), limiting value stressable, instrument range(0.400) kPa, resolution 2 kPa min.3.1.4.6 Digitalanzeigendes berdruckmessgertmit Analogausgang (Drucker- und Schreiberaus-gang), grenzwertbeanspruchbar, Anzeigebereich(0.400) kPa, Auflsung 2 kPa min.3.1.4.7 Tim
23、e Switch with Counter. The time switchwith counter is a device used to operate the pump forthe total number of cycles according to preset oper-ating and break times. Upon completion of the spec-ified number of cycles, the time switch and counterunit shall automatically shut off.3.1.4.7 Zeitschalter
24、mit Zhleinrichtung. Der Zeit-schalter mit Zhleinrichtung ist ein Gert, mit demdie Pumpe nach vorher eingestellten Betriebs- undPausenzeiten ber die gesamte Zahl der Prfzyklenbetrieben wird. Der Zeitschalter mit Zhleinrichtungsoll nach Erreichen einer vorgegebenen Anzahl vonZyklen selbstttig abschalt
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME12527PART12011HEADLAMPWASHERSYSTEMSPART1HIGHPRESSUREPUMPREVISION5ENGLISHGERMANINCLUDESAPPENDIXATHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROGRAMSITISPDF

链接地址:http://www.mydoc123.com/p-754858.html