FORD WSS-M1P51-A-2014 NICKEL PLATED TUBING INTERIOR TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M1P51-A-2014 NICKEL PLATED TUBING INTERIOR TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M1P51-A-2014 NICKEL PLATED TUBING INTERIOR TO BE USED WITH FORD WSS-M99P1111-A .pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 0 2014 01 07 Released T. Covert, NA Controlled document at www.MATS Copyright 2014, Ford Global Technologies, LLC Page 1 of 3 NICKEL PLATED, TUBING INTERIOR WSS-M1P51-A 1. SCOPE The material defined by this specification is a finished tu
2、be with a nickel plating requirement on the interior surface. The tube is derived from a coil of steel electroplated on one side, slit to size, and formed into a single wall tube with the edges welded together. 2. APPLICATION This specification was released originally for low carbon steel fuel lines
3、 used for flex fuel and biodiesel vehicles for improved corrosion resistance over uncoated low carbon steel. 3. REQUIREMENTS 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1
4、111-A). 3.2 NICKEL PLATING THICKNESS, 3 m, min (Metallurgical cross section, ASTM E3) The nickel plating on the interior surface shall be at or above the minimum. The weld bead can be less than 3 m but must have full coverage of nickel when checked using a metallurgical mounted cross-section viewed
5、at 400X 500X magnification (see Figure 1 and 2). Actual coating thickness of the nickel finish shall be monitored circumferentially and longitudinally for each tube manufacturing line. A sampling plan shall be referenced in the control plan. Any non-conforming weld bead will require Ford Materials E
6、ngineering approval. Other methods of measurement may be used as long as they correlate to the metallurgical cross-section testing method, but the cross-section is the final determinant. 3.3 HUMIDITY TESTING (ASTM D1735, 168 h) Finished tube shall be exposed to the following humidity test using 150
7、mm straight samples. The cut ends of the test samples shall be sufficiently protected to prevent rust bleed out. The samples shall be placed approximately at a 30 angle from the vertical in order to allow for moisture to run off. After 168 hours of humidity testing, the three test samples shall be s
8、ectioned longitudinally 90 to the weld bead, exposing the plated inside surfaces of the tube. Requirement: There shall be no red rust on the interior surfaces except for the weld bead. The weld bead shall have less than 5 red rust spots no larger than 3 mm in diameter. A sampling plan shall be refer
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM1P51A2014NICKELPLATEDTUBINGINTERIORTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-752468.html