FORD WSS-M10P12-B2-2013 PRETREATMENT ALUMINUM BATCH APPLIED TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSS-M10P12-B1).pdf
《FORD WSS-M10P12-B2-2013 PRETREATMENT ALUMINUM BATCH APPLIED TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSS-M10P12-B1).pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M10P12-B2-2013 PRETREATMENT ALUMINUM BATCH APPLIED TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSS-M10P12-B1).pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev 0 2013 11 07 Released C. Mracna, NA Controlled document at www.MATS Copyright 2013, Ford Global Technologies, LLC Page 1 of 2 PRETREATMENT, ALUMINUM, CONTINUOUS APPLIED WSS-M10P12-B1 PRETREATMENT, ALUMINUM, BATCH APPLIED WSS-M10P12-B2 1.
2、SCOPE This specification defines the requirements for pretreatment for bond durability intended to be used on sheet, wrought, and cast aluminum. The pretreatment for bond durability coatings shall be specified in conjunction with the appropriate base aluminum specification. 2. APPLICATION This speci
3、fication was originally released for material used for automobile body parts requiring long term durable adhesive bonding performance. 3. REQUIREMENTS 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Produ
4、ction Materials (WSS-M99P1111-A). 3.2 STRUCTURAL ADHESIVE PERFORMANCE REQUIREMENTS Material supplied to this specification shall demonstrate acceptable stress durability and impact toughness performance as detailed in the adhesive performance specification, WSS-M2G410-A, Sections. 3.5.2 and 3.5.4 wi
5、th the following exceptions: For stress durability (sec. 3.5.2), all samples shall be tested at a load of 2400 +/- 25 N, and shall withstand a minimum of 45 cycles. WSS-M10P12-B1 Coupons shall be subjected to a 7% uniaxial strain after pretreatment prior to testing. For continuous coil heat treatabl
6、e sheet, coupons sheet be T82 heat treated per FLTM AB 107-01 prior to testing. WSS-M10P12-B2 no pre-strain conditioning is allowed after pretreatment prior to testing. 3.3 SEALANT PERFORMANCE REQUIREMENTS Material supplied to this specification shall demonstrate acceptable performance as detailed i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM10P12B22013PRETREATMENTALUMINUMBATCHAPPLIEDTOBEUSEDWITHFORDWSSM99P1111ASHOWNONFORDWSSM10P12B1PDF

链接地址:http://www.mydoc123.com/p-751154.html